ATSSA Conference
November, 2014
Khoa Nguyen, MS, P.E.
Director of Tech. Services
THANK YOU
 John Horsley and the entire leadership of
AASHTO
 AGC of America and ARTBA (American Road and
Transportation Builders Association)
 NACE, (National Association of County Engineers)
APWA, (American Public Works Association)
LTAPs and TTAPs, ACEC (American Council of
ttp://www.fhwa.dot.gov/everydaycounts
Engineering Companies)
EVERY DAY COUNTS
Launched by FHWA Administrator, Victor
Mendez, October 2010
• Designed to:
– shorten project development and delivery
– Enhance the safety and performance of our
highways and bridges
– Improve environmental
sustainability
Building on our SUCCESSES
EDC-3
2015 -2016
•
•
•
•
EDC-2
2013 -2014
EDC-1
2011 -2012
Safety
Mobility
Shortening Project Development
Shortening Project Delivery
•
•
•
•
•
•
Safety
Mobility
Reducing Project Delivery Time
Reducing Construction Time
Innovative Contracting
Environment
• Shortening Project Delivery
• Accelerating Technology Deployment
FLORIDA EDC-1 STATUS AND SUCCESSES
Selected Initiatives:
 Clarifying the Scope of Preliminary Design
 Fully Implemented: Updated Manuals &
Processes
 Safety Edge
 Fully Implemented: Adopted in the Florida
Greenbook
 Prefabricated Bridge Elements & System (PBES)
 Fully Implemented: Constructed bridges
using PBES.
 Geosynthetic Reinforced Soil/ Integrated Bridge
System (GRS-IBS)
 Developed Standard Details & Policy
FLORIDA EDC-1 STATUS AND SUCCESSES
Implemented Initiatives:
 Mitigation Banking & In-lieu Fees
 Established by Florida Legislature in 1994
 Planning & Environmental Linkages
 Implemented in the Late 2000’s
 Projected Net Savings: $26M / 67 years
 Flexibilities in ROW
 Fully utilized
 Flexibilities in Utility Relocation
 Fully utilized
 Design Build
 Implemented in the early 2000’s
 438 Projects - $11.6 B – Ave. 30% of all Fund
 Warm Mix Asphalt
 Fully Implemented, 1,133,000 Tons – 96 Projects
 Adaptive Signal Control
 Implemented since the 1990’s
FLORIDA EDC-2 STATUS AND SUCCESSES
Selected Initiatives:
 Programmatic Agreements (PA)
 18 Interagency Agreements
 Locally Administered Federal-Aid Projects
 Mutual LPA Certification Program
 Active LAP Community of Practice Team
 Initiated Consultant Service Flexibility
 3 Dimensional Modeling
 Designed 34 Projects using 3D data
 Intelligent Compaction
 Development Stage
 PBES & GRS/IBS
 Six bridges using GRS-IBS
 High Friction Surfaces
 Projects: 14 addressing 24 Locations
 Intersection and Interchange Geometrics
 Pursuing roundabouts in all Districts
 Diverging Diamond I-75 @University Parkway
 First Responder Training (SHRP 2)
 Held 112 Sections – Trained 2850 Responders
EDC-3 INITIATIVES
Safety & Mobility
 Data-Driven Safety Analysis
 Road Diets (Roadway Reconfiguration)
 Smarter Work Zones
Shortening Project Development
 Regional Models of Cooperation
 Improving Collaboration & Quality Environmental
Documentation (eNEPA and IQED)
Shortening Project Delivery
 3D Engineered Models: Cost/Schedule/Post
Construction
 e-Construction
 Ultra-High Performance Concrete Connections for
PBES
 Geosynthetic Reinforced Soil-Integrated Bridge System
 Locally Administered Federal-Aid Projects: Stakeholder
Partnering
 Improving DOT and Railroad Coordination
State Transpor tation Innovation Council
(STIC)
•
•
•
•
•
•
•
•
•
•
State DOT CEO
FHWA Division Administrator
FDOT & FHWA Personnel
FTTTC
MPO
FACERS
Florida Trans. Builders Assn.
Florida Institute of Consulting Engineers
APWA
ATSSA
QUESTIONS ?