ATSSA Conference November, 2014 Khoa Nguyen, MS, P.E. Director of Tech. Services THANK YOU John Horsley and the entire leadership of AASHTO AGC of America.
Download
Report
Transcript ATSSA Conference November, 2014 Khoa Nguyen, MS, P.E. Director of Tech. Services THANK YOU John Horsley and the entire leadership of AASHTO AGC of America.
ATSSA Conference
November, 2014
Khoa Nguyen, MS, P.E.
Director of Tech. Services
THANK YOU
John Horsley and the entire leadership of
AASHTO
AGC of America and ARTBA (American Road and
Transportation Builders Association)
NACE, (National Association of County Engineers)
APWA, (American Public Works Association)
LTAPs and TTAPs, ACEC (American Council of
ttp://www.fhwa.dot.gov/everydaycounts
Engineering Companies)
EVERY DAY COUNTS
Launched by FHWA Administrator, Victor
Mendez, October 2010
• Designed to:
– shorten project development and delivery
– Enhance the safety and performance of our
highways and bridges
– Improve environmental
sustainability
Building on our SUCCESSES
EDC-3
2015 -2016
•
•
•
•
EDC-2
2013 -2014
EDC-1
2011 -2012
Safety
Mobility
Shortening Project Development
Shortening Project Delivery
•
•
•
•
•
•
Safety
Mobility
Reducing Project Delivery Time
Reducing Construction Time
Innovative Contracting
Environment
• Shortening Project Delivery
• Accelerating Technology Deployment
FLORIDA EDC-1 STATUS AND SUCCESSES
Selected Initiatives:
Clarifying the Scope of Preliminary Design
Fully Implemented: Updated Manuals &
Processes
Safety Edge
Fully Implemented: Adopted in the Florida
Greenbook
Prefabricated Bridge Elements & System (PBES)
Fully Implemented: Constructed bridges
using PBES.
Geosynthetic Reinforced Soil/ Integrated Bridge
System (GRS-IBS)
Developed Standard Details & Policy
FLORIDA EDC-1 STATUS AND SUCCESSES
Implemented Initiatives:
Mitigation Banking & In-lieu Fees
Established by Florida Legislature in 1994
Planning & Environmental Linkages
Implemented in the Late 2000’s
Projected Net Savings: $26M / 67 years
Flexibilities in ROW
Fully utilized
Flexibilities in Utility Relocation
Fully utilized
Design Build
Implemented in the early 2000’s
438 Projects - $11.6 B – Ave. 30% of all Fund
Warm Mix Asphalt
Fully Implemented, 1,133,000 Tons – 96 Projects
Adaptive Signal Control
Implemented since the 1990’s
FLORIDA EDC-2 STATUS AND SUCCESSES
Selected Initiatives:
Programmatic Agreements (PA)
18 Interagency Agreements
Locally Administered Federal-Aid Projects
Mutual LPA Certification Program
Active LAP Community of Practice Team
Initiated Consultant Service Flexibility
3 Dimensional Modeling
Designed 34 Projects using 3D data
Intelligent Compaction
Development Stage
PBES & GRS/IBS
Six bridges using GRS-IBS
High Friction Surfaces
Projects: 14 addressing 24 Locations
Intersection and Interchange Geometrics
Pursuing roundabouts in all Districts
Diverging Diamond I-75 @University Parkway
First Responder Training (SHRP 2)
Held 112 Sections – Trained 2850 Responders
EDC-3 INITIATIVES
Safety & Mobility
Data-Driven Safety Analysis
Road Diets (Roadway Reconfiguration)
Smarter Work Zones
Shortening Project Development
Regional Models of Cooperation
Improving Collaboration & Quality Environmental
Documentation (eNEPA and IQED)
Shortening Project Delivery
3D Engineered Models: Cost/Schedule/Post
Construction
e-Construction
Ultra-High Performance Concrete Connections for
PBES
Geosynthetic Reinforced Soil-Integrated Bridge System
Locally Administered Federal-Aid Projects: Stakeholder
Partnering
Improving DOT and Railroad Coordination
State Transpor tation Innovation Council
(STIC)
•
•
•
•
•
•
•
•
•
•
State DOT CEO
FHWA Division Administrator
FDOT & FHWA Personnel
FTTTC
MPO
FACERS
Florida Trans. Builders Assn.
Florida Institute of Consulting Engineers
APWA
ATSSA
QUESTIONS ?
www.fhwa.dot.gov/everydaycounts/
9