FAIRway Danube Commission Meeting in Budapest 29.09.2015 Károly GOMBÁS (Andreas Bäck) Harmonized realization of the Fairway Rehabilitation and Maintenance Master Plan Global Project IWW of the Rhine-Danube Corridor Proposed.
Download ReportTranscript FAIRway Danube Commission Meeting in Budapest 29.09.2015 Károly GOMBÁS (Andreas Bäck) Harmonized realization of the Fairway Rehabilitation and Maintenance Master Plan Global Project IWW of the Rhine-Danube Corridor Proposed.
FAIRway Danube Commission Meeting in Budapest 29.09.2015 Károly GOMBÁS (Andreas Bäck) Harmonized realization of the Fairway Rehabilitation and Maintenance Master Plan Global Project IWW of the Rhine-Danube Corridor Proposed Action FAIRway waterways Conclusions by Danube Ministers Fairway Maintanance Master Plan for the Danube and its navigable tributaries Guidelines + CEF Key facts Schedule Start: 07/2015 Closure: 06/2020 [Duration of 5 years] Budget Total: 23,4 Mn EUR CEF: 19,7 Mn EUR Setting Multi-applicant CEF study including pilot operations: seven interlinked actions Page 5 Overview on FAIRway activities • Elaborate coordinated national action plans and define pilots • Procure equipment for hydrological services • Execute and evaluate pilots • Harmonized basic data on critical locations • Coherent monitoring of navigational status • Harmonized water level prognosis • Potential of fairway relocation and floating ship data • Develop innovative approaches (aerial monitoring, AtoNs …) • Prepare documentation for future implementation steps • Manage project and disseminate results Page 6 Activity 2 National action plans and definition of pilots Ministerial Conclusions (Dec 2014) ask for national roadmaps based on the Fairway Rehabilitation and Maintenance Master Plan until June 2015. Further development within FAIRway: • Develop 1st version further • Update national action plans yearly • Elaborate pilot implementation concept and evaluation framework Page 7 Activity 3 Procurement of hydrological service pilots Joint market survey, aligned technical specifications, preparation of procurement documents with support of international experts Joint tenders envisaged for transnational waterway asset management system. Data gathering Surveying vessels and gauging stations, floating ship data Data processing and analysis Waterway asset management system Water level prognosis Respond to data Multifunctional marking equipment Page 8 Activity 3 Pilot operation over 3 years… Exploit full potential of navigation conditions through dynamic marking Systematic decision support through improved data analysis. Optimized surveys with denser intervals at critical locations. Strategically placed water level gauges deliver basic data. Matchable water level prognosis displayed in a harmonized way. … to gain experience for the full deployment of the FRMMP Page 9 Activity 5 Innovative approaches Add new perspectives to the waterway administration. • Aerial photo monitoring concepts • Optimum speed at navigable canals • Recalculation of Low Navigable Water Level at the Lower Danube • Agree on AIS AtoN application standard Page 10 Activity 6 Documentation for full deployment Prepare for the full implementation of the Fairway Rehabilitation and Maintenance Master Plan based on the national roadmaps and pilot results. • Feasibility studies in Slovakia (Lower Váh and Gabcikovo) • Prepare implementation of additional measures Page 11 Thank you for your attention! Contact Andreas Bäck viadonau Strategy & Action Programmes T +43 50 4321-1609 [email protected] Donau-City-Straße 1, 1220 Vienna Seite 12