Naston Engineering, Ltd.

Download Report

Transcript Naston Engineering, Ltd.

WATER TREATMENT ENGINEERS AND
CONTRACTORS
Naston Engineering Nigeria Ltd. is a leading indigenous engineering and
contracting company in the field of water and wastewater treatment
systems, sewage treatment, bulk and domestic metering systems, tank
fabrication and pumping systems.
The company's unique range of different technologies come from her
research and development centres, constant liaison with world leaders in
engineering and ensures that our clients (which includes private
companies, municipalities, governments, and international
organizations) receive the most innovative and effective technological
solutions.
With several years of experience, we are able to draw upon an unsurpassed
knowledge of traditional and innovative solutions in order to meet the
demands of both industrial and municipal client.
We have executed projects for many states and the federal government and
have participated in a number of local and internationally funded projects
and are conversant with international procurement Procedures.
2
Our mission is to transform lives by providing systems that adhere to
international standards.
The management and staff of Naston (of more than 60 employees) are
committed to ethical business practices and professional conduct. The
company led by professional engineers with more than 20 years of
combined experience in the field of waste management, industrial waste
water management, operation and maintenance management, turnkey
projects, process reengineering, health and safety management and cost
reduction program.
3
Naston Engineering's services include:
 Feasibility studies,
 Procurements and Supply of equipment,
 Construction of water treatment plant (Fabrication, Installation
&Erection),
 Geo-physical services and Drilling of boreholes,
 Project Management,
 Operation and Management of Plants,
 Metering (Bulk and Domestic),
 Commissioning of Plants and Equipments,
 After-sales service maintenance,
 Plant monitoring and staff training,
 Rehabilitation and upgrading of Waterworks for public and private
sectors,
 We operate a standard laboratory equipped with modern
equipments to carry out water Analyses.
4
We also offer engineering Services in the following areas:
 Packaged Water Treatment Plants, utilizing raw water from
boreholes or Rivers to produce potable water,
 Municipal Water Schemes for Township and Urban centre,
 Supply and Installation of Metering devices, including Pre-paid
meters, Domestic Meters, Nodal Flow Meters, etc.
 Sewage Treatment Plants for small communities as well as more
elaborate schemes for larger communities.
5
We promote world class metering
solution for both Nodal and
Domestic metering. These meters
are fully Electronic, intelligent
thus offering exceptional features
such as:





Exceptional Accuracy,
Durability,
Reliability/Sustainability,
Maintenance Free, and
Good Security.
6
VISUAL DISPLAY OF REMOTE METER READING FROM ONE OF
THE INSTALLED ELECTROMAGNETIC FLOW METER
7
Procurement and Installation of
Prepayment Water Meters in
Gwarinpa II Housing Estate
Client:
Financier:
Date of Award:
Status:
Value:
FCT, Abuja
World Bank
July, 2009,
Completed.
N60Million
The Scope of the Project Includes:
 Procurement of 1000units of Fully Electronic
Domestic Prepaid Water Meters
 Installation of Fully Electronic Domestic
Prepaid Water Meters Including Testing and
Commissioning
8
Construction of Otta-Ikosi 4MGD
Regional Water Supply Scheme
and pipeline Reticulation.
Client:
Lagos State
Financier:
Lagos State
Date of Award:
17th Dec, 2008,
Status:
70% completed
Value:
N4.37Billion
The Scope of the Project Includes:
Construction of River Intake,
Construction of Head-Works & Ancillaries
- Pumps Ranging from 25Kw to 75Kw
Construction 2 Booster Pumping Stations at Agbowa and
Imota,
9
Laying of 40km of DI Pipe for Transmission Mains
- Pipes ranging from ∅80mm to ∅500mm of DI Pipe
Laying of over 40km of PVC Pipe for Reticulation in 13 communities
- Pipes ranging from ∅63mm to ∅315mm of PVC Pipe,
Laying of Service Mains
Supply and Installation of Motor Control Panel (MCC) with Soft Starters
Supply and installation of Telemetry SCADA Equipment and other works
Supply and Installation of 16Nos Galvanized Pressed Steel bolted Panel Tanks of
different sizes - 8,400m3 Cumulative Capacity.
10
Construction of 4MGD Otta-Ikosi
Regional Water supply Schemes
(Additional worksExtension To Ikorodu)
Client:
Lagos State
Financier:
Lagos State
Date of Award:
18th April, 2011
Status:
` In progress.
Value:
N2.3Billion
The Scope of the Project Includes:
Construction of booster Station at Isiu,
Supply and Installation of 3Nos 750m3 Galvanized Pressed Steel
bolted Panel Tanks on 18m Tower at Isiu and Ikorodu.
Supply and installation of 15km of DI pipes (∅ 400mm & ∅ 500mm)
including fittings and accessories.
11
Rehabilitation of 4MGD
Ishasi Waterworks
Client:
Financier:
Date of Award:
Status:
`
Value:
Lagos State
World Bank
24th Jun, 2011.
In progress.
N745.9Million
The Scope of the Project Include:
Refurbishment of Raw water intake station & Floating pontoon
Supply and installation of Raw water Submersible Pumps
Overhauling/Refurbishment of Pumping Station Equipment: Clear
water pumps, Compressors, blowers, dosing equipment, MCC Panels etc
Refurbishment of Filtration Systems Including Installation of New
Instrument and Control Systems
Refurbishment and Improvement to Control Room and PLC
(Programmable Logic Controllers
Replacement of chemical dosing pumps, Mixers and dosing pipelines
Improvement to office, security lightings and small power distribution
12
Construction of Water supply
schemes at Murtala Muhammed
International Airport, Ikeja.
Client:
FAAN
Financier:
Fed. Govt. of Nig.
Date of Award: 14th Oct. 2008.
Status:
80% Completed
Value:
N290Million
The Scope of the Project Include:
Upgrading of the plant from 200m3/day to 400m3/day,
Construction of 3nos ∅250mm Borehole,
Installation of Pump galleries (between 15Hp to 30Hp Pumps),
Supply and Installation of Diesel/Electric Fire Hydrant Pump set
Supply and Installation of Motor Control Panel (MCC) with Soft Starters,
Supply and Installation of Standard Laboratory Equipments,
Etc….
13
Construction of 4Nos 2Million Gallon
Per Day Mini Waterworks
at:
1.
2.
3.
4.
Magodo,
Epe-Agric,
Ajangbadi and
Isheri-Oshun in Lagos
Client:
Financier:
Date of Award:
Status:
Value:
Completion Period:
State.
Lagos State
Lagos State
21st Apr, 2008
Completed
N 1.9Billion
6 Months
14
Scope of Works of Each of the 4 Sites:
 Drilling of 4Nos Deep Boreholes,
 Booster Pumping System Installed,
 Aeration/Sedimentation Tank Fabricated and Installed,
 Filtration System- 4 pressure filters of ∅3m and 3m height,
 Clear Water Tank (1,000m3) Fabricated and Installed,
 Elevated Tank (225m3) Fabricated and Installed,
 Power Generation System,
 Operations Building,
 5km of Distribution Pipeline of different sizes (∅110mm to
∅315mm).
 Installation of MCC Control Panel
 Etc.
15
Upgrade of Water Treatment Plant at
United State of America Consulate,
Lagos Nigeria.
Client:
US Consulate
Financier:
United State of America
Date of Award:
21st Aug. 2009
Status:
Completed
Value:
N38.5Million
Picture not Available
The Scope of the Project Includes:









Upgrading of the plant from 12m3/hr to 18m3/hr,
Supply and installation of 10hp Submersible pump,
Construction of 18m3/hr Water Treatment Plant Comprising:
Aeration & Sedimentation tank: 4.8mL X 2.5mW X 1.5mH
Supply and Installation 3kw Filter pumps and 4kW Transfer pumps
Supply and Installation Pressure Filters
Supply and Installation 3kW Air blower
Supply and Installation Dosing Equipment
Supply and Installation of Motor Control Panel (MCC) with Soft Starters,
16
Overhauling/Upgrading of the
FCT Water Board’s Pumping
Stations.
Client:
FCT, Abuja
Financier:
Fed. Govt. of Nig.
Date of Award:
8th Sept, 2008.
Status:
Completed
Value:
N428.9Million
The Scope of the Project Include:
 Pump and Power Upgrade of 11 Stations
 Rehabilitation and Complete overhauling of the Electromechanical
Equipments of the Booster Pumping Station,
 Supply and Installation of Pumps Ranging from 11Kw to 30Kw,
 Supply and Installation of Electricity Generating Set,
 Installation of Bulk Flow Meter
17
Rehabilitation of Lower Usuma
Dam Water Treatment Plant
(Phase 1)
Client:
Financier:
Date of Award:
Status:
Value:
FCT, Abuja
Fed. Govt. of Nig
8th Sept, 2008,
Completed.
N245. 8Million
 The Scope of the Project Includes:




Replacement of the Emergency De-silting Gate of the Dam at a Depth of 60m,
Rehabilitation of the Phase 1 LUD Water Treatment Plant,
Rehabilitation of The Intake Tower,
Supply and Installation of Electromechanical Equipments (Electric Flow Meters,
Compressor, etc.
 Supply and Installation of Chlorinator (Pre and Post Chlorinator ; up to 20Kg/h),
 And many more..
18
Construction Works for the
Extension and Rehabilitation of
Karu/Nyanya Water Distribution
Network.
Client:
Financier:
Date of Award:
Status:
Value:
FCT, Abuja
World Bank
7th Oct. 2008.
Completed.
N599.9Million
The Scope of the Project Include:
Laying of over 40Km of PVC and
Ductile Iron for Transmission and
Distribution Pipeline Network
19
Emergency Rehabilitation of
Nsukka
Water Supply System
Client:
Financier:
Date of Award:
Status:
Value:
Enugu State
World Bank
10th Oct. 2007
Completed
N182Million
The Scope of the Project Include:






Drilling of ∅350mm Borehole,
Rehabilitation of 4Nos Existing Borehole,
Supply and Installation of Clear Water Pumps
Rehabilitation of Treatment Plant and Installation of Dosing Equipments,
Rehabilitation of Operational Building and Treatment Plant Building,
Laying of 22Km of Distribution Pipeline Network..
20
Supply of Vertical Driven
Pumps for Ajalli-Owa Head
works.
Client:
Financier:
Date of Award:
Status:
Value:
Enugu State
World Bank
10th Oct. 2007
Completed
N102.4Million
The Scope of the Project Includes:
 Procurement of 4Nos Vertical Line Driven Pumps
for Raw Water (580m3/hr @178mH)
 Procurement of 4Nos Vertical Line Driven Pumps
for Clear Water (1070m3/hr @150mH)
21
Replacement of the Electrical
Panels for the New Ajalli-Owa
Intake and High lift pumps
Client:
Financier:
Date of Award:
Status:
Value:
Enugu State
World Bank
3rd July, 2009
Completed
N101.3Million
The Scope of the Project Includes:
 Supply and Installation of Motor Control Panel (MCC) with Soft
Starters for Intake Station,
 Supply and Installation of Motor Control Panel (MCC) with Soft
Starters for High Lift Station
 Supply of Spare Parts.
22
Rehabilitation of Enugu
Metropolis Water Distribution
Network. (Lot 1)
Client:
Financier:
Date of Award:
Status:
Value:
Enugu State
World Bank
23rd Jan. 2009
Completed
N136.9Million
The Scope of the Project Includes:
Procurement of ∅300mm and ∅450mm Ductile Iron Pipes
Procurement of ∅100mm and ∅200mm UPVC Pipes
Laying of Pipes in a densely Built up Area
Reclaimation of Right of Ways by Relocating Utilities such as Underground
Electrical Cables, Telecoms Cable, Transformer etc.,
 Rehabilitation of Lower Ogui Road Pipe Reticulation of 4km Pipe Line,
 Reconnection of New Pipe Network With Supply Mains, Testing, Flushing and
Chlorination of New Pipeline,




23
Rehabilitation of Enugu
Metropolis Water Distribution
Network. (Lot 2)
Client:
Financier:
Date of Award:
Status:
Value:
Enugu State
World Bank
23rd Jan. 2009
Completed
N139.3Million
The Scope of the Project Includes:
Procurement of ∅300mm and ∅450mm Ductile Iron Pipes
Procurement of ∅100mm and ∅200mm UPVC Pipes
Laying of Pipes in a densely Built up Area
Reclamation of Right of Ways by Relocating Utilities such as
Underground Electrical Cables, Telecoms Cable, Transformer etc.,
 Reconnection of New Pipe Network With Supply Mains, Testing,
Flushing and Chlorination of New Pipeline,




24
Ikoyi Hotel Redevelopment Borehole/Water Treatment and
Sewage Treatment Plant
Installation
Client:
Financier:
Date of Award:
Status:
Value:
Ikoyi Hotel Ltd.
Beta Consurtium
24th Jul. 2007
Completed
N44.9 Million
 Drilling of ∅200mm Borehole,
 Design, Construction and Installation of 20m3 Water
Treatment Plant,
 Design, Construction and Installation of Sewage Treatment
Plant.
25
The Scope of the Project Includes:
Rehabilitation and Upgrade of
Ose-Owo Water Supply Scheme.
Client:
Ondo State
Financier:
Ondo State
Date of Award:
14th Oct. 2010
Status:
In progress
Value:
N1.4Billion
 De-silting (Dredging) of the fully silted
Ose dam reservoir.
 Improvement of the treatment and
production capacity of the Treatment
plant
 Improvement on the water supply to
the catchments area via – Installation
of new Transmission and distribution
pipelines (16.7Km 300mm Steel
Pipeline of Transmission Main).
26
The Scope of the Project Includes:
Rehabilitation and Upgrade of
Ose-Owo Water Supply Scheme.
(continue )
 De-silting (Dredging) of the fully silted
Ose dam reservoir.
 Improvement of the treatment and
production capacity of the Treatment
plant
 Improvement on the water supply to the
catchments area via – Installation of new
Transmission and distribution pipelines
(16.7Km 300mm Steel Pipeline of
Transmission Main).
27
Rehabilitation and Upgrade of
Awara Water Supply Scheme.
Client:
Financier:
Date of Award:
Status:
Value:
Ondo State
Ondo State
14th Oct. 2010
In progress
N988.7Million
The Scope of the Project Includes:
 Upgrade of the treatment and production capacity of the plant
 Salvaging of abandoned pressure filtration accessories and Completion of
the abandoned pressure filtration system.
 Upgrade of The Water Supply to The Catchment Area via – Installation
New Transmission And Distribution (HDPE) Pipelines
28
Construction of 50M3/hr
Augmentation Water Treatment
Plant at Ido-Ani.
Client:
Ondo State
Financier:
Ondo State
Date of Award:
3rd Dec, 2010
Status:
In progress
Value:
N117.5 Million
 Expansion of the Water Treatment Capacity of the Plant from 50m3/hr




to 150m3/hr.
Refurbishment of the intake and treatment plant buildings.
Construction of new ground tank .
Completion of the abandoned clarifier.
Supply and installation of new 100m3/hr high lift pumps for Ido-Ani.
29
Construction of Re-designed
Intake/ Rehabilitation of
Existing intake structure at
Oke-Igbo Water Scheme.
Client:
Financier:
Date of Award:
Status:
Ondo State
Ondo State
24th Dec. 2010
In progress
Value:
N42 Million
30
Rehabilitation of Ife-Odan Water
supply scheme.
(EU Financed)
Client:
Osun State
Financier:
European Union
Date of Award:
9th Mar. 2011.
Status:
In progress
Value:
N48 Million
Rehabilitation of Lower Usuma Dam
Embarkment. (Landscaping)
Client:
Financier:
Date of Award:
Status:
Value:
FCT, Abuja
Fed. Govt. of Nig
30th Nov. 2010
60% Completed
N19.9Million
31
1
Rehabilitation and Expansion of Onikan Water
Works (WORLD BANK PROJECT)
Onikan, Lagos
Lagos State Govt.
World Bank
Completed
N 79.6M
2
Rehabilitation of V.I Annex, Eredo, Ota-Ikosi
and Agege Micro Waterworks
Lagos
Lagos State Govt.
Lagos State Govt.
Completed
N 506.7M
3
UACN Property
Development
Company plc.
UACN Property
Development
Company plc.
Completed
N 90.5M
Lagos State Govt.
Lagos State Govt.
Completed
N 525.3M
Artee Group Nig.
Ltd.
Artee Group Nig.
Ltd.
Completed
N 111.0M
6
Construction of 1.25MGD Water Treatment
Victoria Island,
Plant, Supply and Installation of Fire Pump Set
Lagos
and Provision of External Water Distribution
System at 1004 Estates Redevelopment ,
Victoria Island, Lagos
Water Supply Project at Ojo and Epe Campuses,
Lagos
Lagos State University
Design, Fabrication and Installation of 75m3/hr
Lagos
Water Supply System and Pipeline.
Management of the water energy services at
Palm Springs Residences & Resorts, Lekki,
Lagos
Ijora Badiya Micro Waterworks
Lagos
Lagos State Govt.
Lagos State Govt.
Completed
N169.0M
7
Federal Rural Water Supply, Ikorodu, Lagos
N13.6M
Design, Supply & Installation of 50m Water
Treatment Plant at Nicon Town, Lagos
Completed
N54.5M
9
Drilling of 6” Borehole, Installation of 3m /hr
Water Treatment Plant, Provision of High Lift
Pumps, Welding & Fabrication of Steel Water
Storage Tank at Banana Island, Private
Development, Ikoyi, Lagos
Federal Ministry of
Water Resources
Chevron Employees
Coop Thrift & Credit
Society Ltd
Business Contracting
Limited
Completed
8
Federal Ministry of
Water Resources
Chevron Employees
Coop Thrift & Credit
Society Ltd
Business Contracting
Limited
Completed
N9.85M
4
5
3
3
Lagos
Lagos
Lagos
32
10
11
12
13
14
15
16
17
18
Laying of Water Pipeline Reticulation for
Oworonsoki, Otto-Awori and Ijora Badia
Iwaya Micro Water Works – 1 Million
Gallon Per Day
Otto-Awori Micro Water Works – 1
Million Gallons per Day
Oworonshoki Micro Water Works – 1
Million Gallons Per Day
Ijora Badia Micro Water Works – 1 Million
Gallons Per Day
Onikan Micro Water Works – 1 Million
Gallons per Day
Rehabilitation of Owena Water Treatment
Plant
Drilling of 2 Boreholes, Reticulation,
Rehabilitation of Gent Sets and Storage
Tanks at University of Abuja.
And many more projects
Lagos
Lagos State Govt.
Lagos State Govt.
Completed
N 288.2M
Lagos
Lagos State Govt.
Lagos State Govt.
Completed
N 162.0M
Lagos
Lagos State Govt.
Lagos State Govt.
Completed
N 229.0M
Lagos
Lagos State Govt.
Lagos State Govt.
Completed
N 229.0M
Lagos
Lagos State Govt.
Lagos State Govt.
Completed
N 229.0M
Lagos
Lagos State Govt.
Lagos State Govt.
Completed
N 229.0M
Owena
Ondo State Govt.
Ondo State Govt.
Completed
N 15.0M
Completed
N 7.5M
Abuja
University of Abuja University of Abuja
Across
Nigeria
Private, Companies, Private, Companies, Completed
Governments and Governments and
And
International Bodies International Bodies On-Going
33
We have presented our capability and
experience in executing projects of
various sizes and complexity in the
water industry and we are roaring to
do more…
34
LAGOS OFFICE ADDRESS
WATER HOUSE, IPONRI
1, AFRIC ROAD,
OFF FUNSHO WILLIAMS AVENUE,
IPONRI LAGOS
ABUJA OFFICE ADDRESS
3, GOBA STREET, OFF MONROVIA
STREET
AMINU KANO CRESENT,
WUSE II, ABUJA.
AKURE OFFICE ADDRESS
22, IKALE STREET,
IJAPO ESTATE
AKURE,
ONDO STATE.
TELEPHONE:
+234 1 841 6002, +234 803 303 4927
E-MAIL:
[email protected];
35