MSJC 4/10s Cost Analysis
Aug. ’08 - Rev. Feb. ‘09
Compiled by MSJC R&P Dept. – XCJH 09.03.08 Rev. 2.19.09
MSJC 4/10s Cost Analysis
Objective of study:
• To determine the benefits and the savings of implementing
a 4-day 10 hour work week at MSJC for non-faculty full time
permanent employees
While all parties benefit from lower levels of Carbon Dioxide
Emissions (CO2), the specific benefits by category include:
• Local Community/Environment – decreased traffic
• Employees – decreased transportation cost and
– increase number of 3 day weekends
• MSJC District – decreased utility cost
MSJC R&P Dept. XCJH09.03.08
MSJC Classified & Administrators
4/10s Savings per Employee
Miles
Gas
Gas Cost
(roundtrip)
(gallons)
($2.24/gal)
(2)
(3)
Gas, Maintenance, Repair
Cost, Insurance &
Depreciation
(4)
Wkly
26.2
1.29
$2.89
$6.16
Annual
969
47.7
$176
$228
(6)
(1)
Carbon Dioxide Emissions
(5)
Pounds
926
Metric Tons
0.41
(7)
Sources and assumptions:
(1) Includes classified staff, administrators & excludes faculty, temporary & part-time employees from MSJC Employee Data Extract
(2) Mileage from employee’s home address of record to respective campus worksite was calculated using Map Quest
(3) 20.3 MPG estimate & 19.4 lb of carbon dioxide (CO2) per gallon of gas - U.S. Environmental Protection Agency
(3a) Riverside County avg. price of regular on 2.11.09
(4) Based on an average cost of $.125/mile to operate a vehicle (excluding gas) & IRS/AAA average estimate of 15,000 miles a year (26.2 x .125 + gas)
(5) Over a 12 month period no mileage will be substituted for the reduction in mileage driven to MSJC as a result of a ‘4/10s program’
(6) Annual data based on 37 five day work weeks (assumes an average of 3 weeks vacation per employee and a total of 12 weeks with
four or less work days (calculation of 37 weeks = 52 total wks – 3 vacation wks – 12 wks with four or less work days)
(7) 2,204.6 lb = 1 metric ton – Metric Conversions .org
Compiled by MSJC R&P Dept. – XCJH 02.19.09
MSJC District
4/10s Annual Savings for Employee
# of
Employees
Miles
Gas
(roundtrip)
(gallons)
(1)
(2)
(3)
Gas
Cost
Gas, Maintenance,
Repair Cost, Insurance
& Depreciation
($2.24/gal)
(4)
(3a)
(6)
Carbon Dioxide Emissions
(5)
Pounds
Metric Tons
223
SJC
217,665
10,722
$24,018
$51,226
208,015
93
132
MVC
126,186
6,216
$13,924
$29,697
120,592
54
355
District
343,851
16,938
$37,942
$80,923
328,607
147
(7)
Sources and assumptions:
(1) Includes classified staff, administrators & excludes faculty, temporary & part-time employees from MSJC Employee Data Extract
(2) Mileage from employee’s home address of record to respective campus worksite was calculated using Map Quest
(3) 20.3 MPG estimate & 19.4 lbs of carbon dioxide (CO2) per gallon of gas - U.S. Environmental Protection Agency
(3a) Riverside County avg. price of regular on 2.11.09
(4) Based on an average cost of $.125/mile to operate a vehicle (excluding gas) & IRS/AAA average estimate of 15,000 miles a year
(5) Over a 12 month period no mileage will be substituted for the reduction in mileage driven to MSJC as a result of a ‘4/10s program’
(6) Annual data based on 37 five day work weeks (assumes an average of 3 weeks vacation per employee and a total of 12 weeks with
four or less work days (calculation of 37 weeks = 52 total wks – 3 vacation wks – 12 wks with four or less work days)
(7) 2,204.6 lb = 1 metric ton – Metric Conversions .org
Compiled by MSJC R&P Dept. – XCJH 02.19.09
MSJC 4/10s Annual End Benefits
• Carbon Dioxide Emissionsdown by 147 metric tons (328,600 lbs)
• Local Community/Environment decreased traffic by 13,135 vehicles (37 wk x 355 employees)
• Employees decreased cost by $80,900 ($241/employee)
increased # of 3 day weekends by 37 or 147%
• MSJC District decreased utility cost by (TBD)
Compiled by MSJC R&P Dept. – XCJH 02.19.09
4/10 Issues to address
1.
Utility cost savings appear to occur when the electric system for
the entire or section of the building can be shut off or lowered
2.
Telecommuting is a realistic option for administrators.
U.S. GSA survey (863 respondents) reported:
88% less stress
77% more energy
60% increased in job performance
3.
Computer hardware for administrators to telecommute
4.
4/10s would help meet South Coast Air Quality Management
District requirements