College Park Church is engaged in major
Renovations and Improvement of its building. This
is the first large renovation project since the Church
was built over 50 ago.
This renovation plan encompasses four phases as
follows:
Phase One
Phase One has already been implemented and it was
comprised of:
• The replacement of the old furnace by three new furnaces
• The replacement of all the windows
• The installation of power operated blinds
• The installation of Air Conditioning units
• The installation of new projectors and screens
Phase Two
(to be implemented in 2014)
Split the fellowship room into two floors, adding about 1300
square feet of space on the second floor
Add movable partitions to both floors allowing the fellowship
room and the newly created chapel/meeting room to be
divided into two large rooms, providing vital space for
meetings, Sabbath School classes, etc.
Renovate and upgrade the kitchen
Add a barrier-free washroom at the lower level
Rearrange the existing storage space to make it more userfriendly.
Phase Three
In phase three, the sanctuary will be renovated as follows:
General facelift of the whole Sanctuary
Pews will be either replace by padded pews or renovated and padded
The heating system will be addressed
A barrier-free washroom will be added to the Sanctuary level
The mothers’ room will be renovated
The lighting system will be studied and changed accordingly
The sound system will be addressed
The existing flooring will be replaced
The rostrum area will be re-designed
Phase Four
Renovate all existing washrooms on the middle floor
Add a barrier-free washroom to the middle floor
Renovate all the children’s classrooms and bring them up to
code
Build storage spaces in some of the children’s classrooms
Bring all doors and ventilation up to code