Agenda
• Review Unscheduled Outages
• Review of Upcoming Outages
– July/August & September
• North System
• South System
• South Louisiana
– Outages for the remainder of 2014
• North System
• South System
• South Louisiana
• Contacts
3
Disclaimers
• Anticipated Impacts are estimates. Actual nominations, market
demand, weather and pipeline conditions, etc. will determine if, and
through what level, restrictions become necessary.
• Unless otherwise stated, all scheduled dates represent gas days as
defined in the Southern Natural Gas Pipeline tariff to mean a period of
twenty-four consecutive hours, beginning and ending at 9:00 a.m.
(Central Clock Time).
• Scheduled dates are subject to change.
• Projects may be added, altered, delayed or cancelled.
• SNG will provide notice of such additions or changes via SoNet Premier
postings.
• Dates as posted on SoNet should be deemed correct in the event of
conflicts between SoNet posted dates and dates within this
presentation.
4
Color Key for Maps
• Green
– No Impact Anticipated
• Yellow
– Restrictions are possible
– With extended duration, restrictions could be
necessary from time to time
– Meter(s) affected are noted with (M)
• Red
– Restrictions are probable
5
Southern Natural Gas Pipeline
Chattanooga
Muldon
MS
North System
GA
SC
Aiken
Atlanta
Bear Creek
Thomaston
Enterprise
Gwinville
LA
South System
AL
Elba
Albany
Pearl River
South Louisiana
Franklinton
White Castle
FL
Compressor Station
Storage Field
LNG
6
Southern Natural Gas Pipeline
Unscheduled Outage Update
Chattanooga
Bear Creek unit outage
Return to service
7-30-14
8” West Point Line outage.
Muldon
GA
MS
Aiken
Atlanta
Bear Creek
South Section line 28 outageErath, La. To White Castle
Station
605200-Sabine
605300-Sea Robin
033200-South Sect. Terminal
031900 Lake Larose
032400 Crook Chene
Return to service around
8-8-14
SC
Auburn
Thomaston
Elba
LA
Enterprise
Gwinville
AL
Albany
Pearl River
Franklinton
White Castle
Toca
Franklinton compressor
station unit outage
Return to service around
March of 2015
FL
Compressor Station
Storage Field
LNG
7
SNG North System
Maint. Review July/August & September
Chattanooga
Pipeline remediation 24”
North Main 2nd Loop line
September/October
Capacity reduced as much as
95 MMcf/d
Pipeline relocation on 30”
field storage line mid August
Stopple by-pass
Huntsville
Rome
AL
Muldon Storage
MS
McConnells
Providence
Tarrant
Pell City
Bell Mills
Atlanta
DeArmanville
Reform
Louisville
GA
Pickens
Onward
Bear Creek Storage
AL
Logansport
Bienville
Rankin
LA
Remediation on 24” North
Main Loop line 7/7/14 to
8/10/14
Cap reduced 90 MMcf/d
16” Logansport Supply line
pigging-7/29/14 and 7/31/14
Customers may experience
higher than normal pressures
Compressor Station
Southern will be conducting other general
maintenance during this period
Storage Field
8
SNG South System
Maint. Review July/August & September
Pipeline replacement on the 30”
South Main 2nd Loop line
9/15/14 thru 11/1/14
Capacity reduced up to 240 MMcf/d
MS
Hartwell
Aiken
Atlanta
Pipeline replacement on the 24”
South Main Loop line
8/4/14 thru 9/12/14
Capacity reduced up to 100 MMcf/d
Wrens
GA
Ocmulgee
Hallgate
AL
Ellerslie
Auburn
Enterprise unit
maintenanceSeptember/October
Thomaston
Elba
Gallion
York
Selma
Elmore
Riceboro
Holy Trinity
Enterprise
Bay Springs
Gwinville
Albany
Brookman
Pavo
Compressor Station
Storage Field
LNG
Southern will be conducting other general
maintenance during this period
9
SNG South La. System
Maint. Review July/August & September
Gwinville
MS
LA
Pearl River
Franklinton
West Leg
White Castle
East Leg
Shadyside
Toca
Compressor Station
Southern will be conducting other general
maintenance during this period
Storage Field
10
SNG North System
Maintenance Review remainder of 2014
Muldon Fall Shut-in Test
10/7/14 thru 10/13/14
DIQ and DWQ allocated 36%
Muldon unit maintenance
Two weeks in the fall
Chattanooga
Huntsville
Rome
Atlanta
Muldon Storage
Tarrant
Bear Creek Fall Shut-in Test
10/21/14 thru 10/27/14
DIQ and DWQ allocated 64%
McConnells
MS
Reform
Louisville
Providence
Pell City
Bell Mills
DeArmanville
GA
Pickens
Onward
Bear Creek Storage
AL
Rankin
Bienville
Logansport
LA
Southern will be conducting other general
maintenance during this period
Compressor Station
Storage Field
11
SNG South System
Maintenance Review remainder of 2014
Ellerslie unit maintenance
In October
Hartwell
AL
Aiken
Atlanta
GA
Wrens
Ocmulgee
Hallgate
Ellerslie
MS
Selma
Thomaston
Auburn
Elba
Gallion
Elmore
Holy Trinity
Riceboro
York
Enterprise
Bay Springs
Albany
Gwinville
Auburn unit maintenance
September /October
Brookman
Pavo
Compressor Station
Southern will be conducting other general
maintenance during this period
Storage Field
LNG
12
SNG South Louisiana System
Maintenance Review remainder of 2014
Gwinville
MS
Pearl River
LA
Franklinton
Southern will be conducting other general
maintenance during this period
West Leg
White Castle
Shadyside
East Leg
White Castle, Shadyside
Unit Maintenance
Mid September - mid October
West Leg Capacity impact up to
150 MMcf/d
Toca
Compressor Station
Storage Field
13
Gas Control Contacts
• Adam Krustchinsky – Manager
(713) – 420 – 3265 (office)
(713) – 202-7035 (cell)
[email protected]
• Kal Dankovich – Outage Coordinator
(713) – 420 – 7522 (office)
(205) – 420 – 7305 (Gas Control)
[email protected]
• Jimmy Reese – Lead Controller
(713) – 420 – 7310 (office)
(205) – 420 – 7305 (Gas Control)
[email protected]
• Daniel Mitchell – Lead Controller
(205) – 420 – 5874 (office)
(205) – 420 – 7305 (Gas Control)
[email protected]
14
Questions?
15