RTS Re-fresh
North East Transport Consultative Forum
Tuesday 30th October 2012
Regional Transport Strategy
 Approved by Scottish
Ministers in 2008
 £1 billion package of
measures
 Covering period to 2021
 Separate delivery plan
published in 2010
Main Issues Report
 What has changed since the RTS was published in 2008?
– Policy
– Infrastructure
– Funding
 Current trends and progress towards achieving the objectives
 Trends forecast to 2030/35
 Where we want to be in 2030/35
External changes since 2008
European and National Policy
 EU White Paper on Transport
 Climate Change legislation and guidance
 Scottish Government Economic Strategy
 Cycling Action Plan for Scotland
 Scotland’s Cities: Delivering for Scotland
 National Planning Framework 2
 Designing Streets
 Scottish Government Infrastructure Investment
Plan
North East Policy changes since 2008
 Structure Plan & Local Development Plans adopted
– In 2008 the RTS did not have the context of an up to date
development plan
 RTS Action Plans:
– Health & Transport
– Bus
– Rail
– Freight
 Regional Parking Strategy
 Road Casualty Reduction Strategy
 Air Quality Action Plan (City Council)
Forecast trends to 2035
 Population growth and housing requirement
– Structure Plan aims to increase population by around 30,000
between 2011 and 2035
– Allowance for 67,000 new homes in the same period
 Cumulative impact on the transport network
 Changing travel patterns
 Trends towards increasing levels of obesity and poorer health
 Uncertainty in the future cost of fuel
Consultation Question:
– Do the objectives and actions, as set out in the current RTS, remain
valid and fit for purpose in light of these predicted trends
Consultation Questions
1. Does the MIR fairly reflect the changes in policy, funding
and trends since the publication of the RTS in 2008?
2. Are there any other issues affecting the extension of the
RTS that should be considered?
3. Are there any other trends that will influence the delivery of
the RTS that need to be considered?
Proposed changes to the strategy
External connections strategy
 Inclusion of proposals to dual the A96, as included in the
Scottish Government Infrastructure Investment Plan
 Continue dialogue with Scottish Government and the Northern
Isles ferry operator to ensure continuation of service.
 Rail enhancements
– Aberdeen-Inverness
– Aberdeen-Central Belt
 High Speed Rail
 Aviation
Proposed changes to the strategy
Internal connections strategy
 Rephrase local rail improvements focussing on incremental
delivery through individual projects.
 Investigate the potential for further stations in the context of
upgrades to the existing rail lines
 Rail Action Plan review
 Road capacity improvements to mitigate the cumulative impact of
development – Strategic Transport Fund
 New locations for strategic road capacity and safety
improvements
– Prioritisation
 Explore the potential for Park & Ride mini-hubs
Internal connections strategy cont…
 A focus on improving surface access to Aberdeen Airport by all
modes, rather than just bus.
 Improved access for public transport at Dyce railway station
 Less specific in relation to access to the airport, reference to
high quality transport links.
 Public transport improvements to mitigate the cumulative
impact of development
 Addition of smart ticketing for public transport
 Reference to the pedestrianisation of Union Street
 Greater emphasis on developing a connected and strategic
cycle network
Strategic policy framework
 Develop an active travel action plan
 Continue to promote and strengthen the Getabout brand
 Removal of specific reference to TMOs – encourage businesses to cooperate on travel planning
 Inclusion of car club schemes alongside carshare initiatives
 Specific reference to the delivery of the Health & Transport Action Plan
 Support enforcement measures to improve the operation of bus lanes
 Support the development and trial of new technologies
 Support measures that encourage the uptake of alternative fuels
 Demand management and other measures to maximise the benefits of
road investment
 An active and inclusive approach to engagement and consultation
Next Steps
 Main Issues Report for consultation
 Formally refer to the two Councils for comment
 SEA and EIA
 Members’ Workshop
 NETCF meeting with stakeholders
 Opportunity for more detailed discussions with partners if required
 Final re-fresh to Board for approval
 Final output – a revised actions table as an addendum to the
existing RTS document
 Submission to Scottish Ministers