Unit 15
Plumbing Prints
page 159
Learning Objectives
Identify various piping systems
Recognize plumbing fixtures
symbols on prints
Explain the three stages of
plumbing installation
Read piping diagrams
Specifications
Unit 15
page 159
Staging
Stage 1
provisions for water outlet & for
service entrance of water supply &
sewer drain to the building are
made prior to the pouring of the
foundation.
Stage 2
rough-in plumbing work done
prior to slab-on-grade and wall
coverings
Specifications
Unit 15
page 159
Staging
Stage 3
finish plumbing - setting of fixtures
after walls and floors are finished
Plumbing Information
shown on architectural floor plan
Unit 15
page 160
Figure 15 - 1
Water Distribution
System
main supply line form water
meter
distributes to water outlets
water heater
sinks
water closets
hose bibs
etc.
includes control valves
Unit 15
page 159
Plumbing Symbols
Unit 15
page 161
Figure 15 - 3
Distribution Piping
Materials
Unit 15
page 160
copper - most common for water
distribution
comes in - heavy, medium, & light
hard or soft
do not embed in concrete
Unit 15
page 160
Sleeves
Use a sleeve to protect
pipe going thru wall
Allow for movement in
copper pipe
Distribution Piping
Materials
Unit 15
page 160
copper should never come in
contact with other metals
joints
sweated
threaded
Distribution Piping
Materials
galvanized steel pipe
great strength
dimensionally stable
protected inside & out
three grades
S - standard
XS - extra strong
XXS - double extra strong
Unit 15
page 162
Distribution Piping
Materials
brass pipe
Unit 15
page 162
used for highly corrosive water
plastic pipe
ABS - acrylonitrile butadiene styrene
PVC - polyvinyl chloride
polybutylene
threaded or solvent welded joints
rated according to wall thickness
can distribute hot water
Plumbing Isometric
Unit 15
page 163
Figure 15 - 4
Plumbing Rough-in
Unit 15
page 160
Plumbing Rough-in
Sewage Disposal System
includes
vertical soil stacks
a vent
a trap
cleanouts
Plumbing Codes
Uniform Plumbing Code
Local Government Codes
Specify leak testing
Test Your Knowledge
Unit 15
take 10 minutes to complete the
test on page 165
Unit 15
Residential Plumbing Prints
Take 10 minutes & complete
the questions for Activity 15-1
on page 166 refer to large
prints 15-1
Unit 15
Office Building Plumbing Prints
Take 15 minutes & complete
the questions for Activity 15-2
on page 167 refer to large
prints 15-2a & 15-2b
END OF UNIT 15