IET 222 COMMERCIAL ARCHITECTURE DESIGN & DRAFTING

Download Report

Transcript IET 222 COMMERCIAL ARCHITECTURE DESIGN & DRAFTING

Unit 15
Plumbing Prints
page 159
Learning Objectives




Identify various piping systems
Recognize plumbing fixtures
symbols on prints
Explain the three stages of
plumbing installation
Read piping diagrams
Specifications
Unit 15
page 159
Staging

Stage 1


provisions for water outlet & for
service entrance of water supply &
sewer drain to the building are
made prior to the pouring of the
foundation.
Stage 2

rough-in plumbing work done
prior to slab-on-grade and wall
coverings
Specifications
Unit 15
page 159
Staging

Stage 3

finish plumbing - setting of fixtures
after walls and floors are finished
Plumbing Information
shown on architectural floor plan
Unit 15
page 160
Figure 15 - 1
Water Distribution
System


main supply line form water
meter
distributes to water outlets
water heater
 sinks
 water closets
 hose bibs
 etc.


includes control valves
Unit 15
page 159
Plumbing Symbols
Unit 15
page 161
Figure 15 - 3
Distribution Piping
Materials

Unit 15
page 160
copper - most common for water
distribution
comes in - heavy, medium, & light
 hard or soft
 do not embed in concrete

Unit 15
page 160
Sleeves
Use a sleeve to protect
pipe going thru wall
Allow for movement in
copper pipe
Distribution Piping
Materials


Unit 15
page 160
copper should never come in
contact with other metals
joints
sweated
 threaded

Distribution Piping
Materials

galvanized steel pipe
great strength
 dimensionally stable
 protected inside & out
 three grades

 S - standard
 XS - extra strong
 XXS - double extra strong
Unit 15
page 162
Distribution Piping
Materials

brass pipe


Unit 15
page 162
used for highly corrosive water
plastic pipe
ABS - acrylonitrile butadiene styrene
 PVC - polyvinyl chloride
 polybutylene
 threaded or solvent welded joints
 rated according to wall thickness
 can distribute hot water

Plumbing Isometric
Unit 15
page 163
Figure 15 - 4
Plumbing Rough-in
Unit 15
page 160
Plumbing Rough-in
Sewage Disposal System
includes




vertical soil stacks
a vent
a trap
cleanouts
Plumbing Codes



Uniform Plumbing Code
Local Government Codes
Specify leak testing
Test Your Knowledge

Unit 15
take 10 minutes to complete the
test on page 165
Unit 15
Residential Plumbing Prints

Take 10 minutes & complete
the questions for Activity 15-1
on page 166 refer to large
prints 15-1
Unit 15
Office Building Plumbing Prints

Take 15 minutes & complete
the questions for Activity 15-2
on page 167 refer to large
prints 15-2a & 15-2b
END OF UNIT 15