Slayt 1 - www.barka.com.tr

Download Report

Transcript Slayt 1 - www.barka.com.tr

• To Whom It May Concern.
26.Aug.2009
• PROPOSAL FOR COLLABORATION
• We are a construction company which is located in Istanbul. Our Company has branches in Russia ,Abu Dhabi and Saudi Arabia . We have
been in construction market for twenty years.
• During the last year, we have been searching about construction projects in Libya .Our intension is to establish our company in Libya and
to realize high quality and enduring jobs in terms of engineering and manufacturing.
• Our greatest wish is to be long lasting and successful in our jobs.
• We would like to mention that we, as Barka Company, have the technical knowledge, capacity and financial resources to accomplish our
targets.
• Within the last year the representatives and partners of our company have made visits to Libya almost every month to make market
research and contacts and they have collected data about the Libya market.
• As a result of these visits and researches, we have concluded in the idea of having a permanent position in associate and brother country
like Libya
• Therefore, our greatest wish is to be guided and helped by respectable and considerable people like you. We would like to cooperate
indeed.
• Sincerely Yours.
•
•
Ahmet KARAMUSTAFAOĞLU
Chairman of Board
Muammer BARBAROSOĞLU
Vice Chairman of Board
• Brief Information about our Company:
• Barka Construction is a Company of the AKM Group.
• Other Companies in our Group:
• ASIL Chemicals Co.
•
• SILKO Co.
: Production, Export, Import and Marketing of Chemical row
Material.
•
: Production, Export, Import and Marketing of Construction
Chemical Materials.
• ACM Ltd.
: Construction and marketing of motorized Yacht
• REVANNA Ltd.
: Manufacturing and marketing of Elevator Rails
• BARKA CONSTRUCTION Co.
: Contracting Services National and Internationa
• Some of projects accomplished in Turkey:
•
•
•
•
•
•
•
•
•
•
•
1.BALIKESİR City ,214 km. Potable Water & Transmission Line Construction.(The Pipes Diameters are between Ø 400 - Ø 1800)
2. ASİL Chemical Co.; 2800 sqm.Chemical Material Factory Building.Builded as a steel construction in ISTANBUL.
3.IŞIKLAR HOLDİNG JV. ; 9500 sqm. Headquarters Building Construction İSTANBUL.
4.SPECİAL RESİDENCE CONSTRUCTİON ; 22.500 sqm. Including closed parking area & swimming pool. ISTANBUL.
5. 2 No. HISTORICAL BUILDING RENOVATION. (First Degree Majeur) . ISTANBUL.
6. HEALTH PROFESSION HIGH SCHOOL ; 14.500 sqm.Construction Area. BARTIN.
7. BRİCKYARD CONSTRUCTION ; 28.000 sqm. Construction Area . Builded as a steel construction in BARTIN.
8. WRAPPING PAPER MANUFACTURİNG PLANT ; 15.500 sqm. Construction Area. Builded as a steel construction in KONYA.
9. 1024 No. APARTMENTS CONSTRUCTİON ; 131.072 sqm.Construction Area. Public Works Ministry. ADAPAZARI.
10. 27 Km. HIGHWAY. Including Viaducts & Bridges.
11. HIGH VOLTAGE LINE.
• Some of projects accomplished in Russia:
•
•
•
•
•
•
•
1. RESPEKT Co. ; 5800 sqm. Office Building Construction.
2. RESPEKT CO. ; 13.200 sqm. Office Building Construction.
3. UGMK HOLDİNG ; 9.800 sqm. Administration Building.
4. UGMK HOLDİNG ; 24.000 sqm.Multi Purpose Gym . Builded as a steel space frame construction system.
5. STAVROPOL MUNICIPALITY BUILDING ; 10.200 sqm.
6. ALTIN AYAR CO. ; 11.000 sqm. Administration Building.
7. SBERBANK BUILDING ; 16.500 sqm. Construction Area.
–
–
–
–
–
Notes ;
1. In Russia we signed two contracts.Cement Factory and 30.000 sqm. Office Building Also
contract in Saudi Arabia which is 103.000sqm. Hotel Project.
But they are in pending at that time by the reason of crisis.
we have another
2. We have three projects in Turkey as a holder of these projects.Also all the plans and projects are done by
ourselves. CALCİDE & TALCUM MANUFACTURING PLANT , 2.800 sqm.OFFİCE BUILDING and 7.500 sqm. APARTMENT
BUILDING.
Now a days these projects are in pending, by the reason of crisis.
AKM GROUP COMPANIES CHART
AKM GROUP
Chairman of the Board -Ahmet KARAMUSTAFAOĞLU
Board Member - Muammer BARBAROSOĞLU
Board Member - Cemil GÜRSOY
ASIL CHEMICALS CO.
SILKO CONSTRUCTION CO.
BARKA CONSTRUCTION CO.
MARMARA MICRONISE
MINING CO.
ACM MARINE YATCHING CO.
AKRAY ELEVATOR SYSTEMS CO.
SAFIR MINING AND CHEMICALS CO.
BARKA CONSTRUCTIONS CO.
CHART OF BRANCHES
BARKA CONSTRUCTION
CO.
HEADQUARTERS
ISTANBUL/TURKEY
BARKA CONSTRUCTION BARKA CONSTRUCTION BARKA CONSTRUCTION BARKA CONSTRUCTION
CO.
CO.
CO.
CO.
RUSSIA BRANCH
ABU DHABI BRANCH
SAUDIA ARABIA BRANCH
LIBYA BRANCH
BARKA CONSTRUCTIONS CO.
ORGANIZATION CHART
BARKA CONSTRUCTION
CO
RUSSIA AND BDT
COORDINATOR
PROJECT COORDINATOR
PROJECT MANAGER
MIDDLE EAST
AND ARAB PENINSULA
COORDINATOR
CEO
GENERAL COORDINATOR
INFRASTRUCTURE AND ROADS
COORDINATOR
ELECTRO MECHANIC
COORDINATOR
PROJECT DESIGN
MANAGER
LOGISTICS AND PLANNING
MANAGER
FINANCE AND BUSINESS
MANAGER
Barka Construction Co.Management List
• 1 – BOARD OF DIRECTORS
•
Chairman of board
•
Ahmet KARAMUSTAFAOĞLU
•
•
Vice Chairman of Board
Muammer BARBAROSOĞLU
•
•
Board Member
Cemil GÜRSOY
•
• 2 – CEO
•
Mehmet TUTAL
• 3 – GENERAL COORDINATOR
•
•
Burak BEKTAŞ : Born in 1967 , Middle East Technical University Construction
Engineering 1990 graduate.
•
• 4 – RUSSIA AND CIS COORDINATOR
•
•
Ceshur TURHAN : Born in 1973 , Gazi University Construction Engineering
1995 graduate.
• 5 – MIDDLE EAST AND ARAB PENINSULA COODINATOR
•
•
Savaş ATAHAN : Born in 1957 , Karadeniz Technical University Construction
Engineering 1979 graduate.
• 6 – INFRASTRUCTURE AND ROADS COORDINATOR
•
•
Erdal ÖNCÜ : Born in 1956 , Karadeniz Technical University Construction
Engineering 1980 graduate.
• 7 – ELECTRO MECHANICS COORDINATOR :
•
•
Sancar AKYOL : Born in 1965 , Yıldız Teknik University Electric Engineering
1987 graduate.
• 8 – PROJECT DESIGN MANAGER
•
•
Sinan TÜRKKAN : Born in 1962 , Yıldız Teknik University Construction
Engineering 1984 graduate.
• 9 – LOGISTICS AND PLANNING MANAGER
•
•
•
Ali Rıza USLU: Born in 1970 , Çukuırova Universtiy Construction Engineering
1995 graduate.
• 10 – FINANCE AND BUSINESS MANAGER
•
•
Ahmet YELİS : Born in 1960 , Marmara University School of Business 1982
Graduate.
• 11 – PROJECT COORDINATOR
•
•
Nejdet DURGUN : Born in 1954 , Istanbul Technical University Faculty of
Architecture 1978 graduate.
• 12 – PROJECT MANAGER
•
•
•
•
Metin DEMİR : Born in 1955 , Karadeniz Technical University Construction
Engineering 1979 graduate.
Ahmet KARAMUSTAFAOĞLU
Chairman of the Board
Muammer BARBAROSOĞLU
Vice Chairman of the Board