Transcript Document
CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM MR MAUNG MAUNG ( Chief Engineer) Myanma Electric Power Enterprise Ministry of Electric Power 2 Contents Geography of Myanmar Existing Power Industry of Myanmar Upgrading options for the Grid (Short Term Reinforcement Plan of Transmission Lines & Substations) Conclusion 3 4 Brief Introduction to The Republic of Union of Myanmar Area of Country 261, 229.73 sq-mile(677,000 km2) Population around 59.78 million(as of 2011) Kachin Sagaing The country consists of States Regions (1) Kachin (1) Sagaing Shan Chin Mandalay Rakhaing Magway Kayar (2) Kayah (2) Tanintharyi Bago (3) Kayin (3) Bago Yangon (4) Chin (4) Magway (5) Mon (5) Mandalay (6) Rakhaing (6) Yangon (7) Shan (7) Ayeyarwaddy Ayeyarwaddy Kayin Mon Tanintharyi 5 GEOGRAPHY OF MYANMAR (Location) China – 2185km India- 1462 km Bangladesh-72km Coast-2308km Total Perimeter with International Borders 5756 km Lao – 238km Thailand- 1799km Geography of Myanmar Kachin Mountains Yakhine Mauntains Ayeyarwaddy Delta 6 (Topography) Shan Plateaus 7 Geography of Myanmar (Major Rivers) Chindwin 1,151 km Ayeyarwaddy 2,063 km India China Bangla desh Thanlwin 1,660 km Bay of Benga l Thail and Sittaung 310 km 8 Population Distribution of Myanmar POPULATION ESTIMATES OF MYANMAR (AS OF OCTOBER 1 - 2010) Population (Million) S.N. Year Annual Growth Rate Total Male Female (Percentage) 1 1990 - 1991 40.78 20.21 20.57 1.88 2 1995 - 1996 44.74 22.22 22.52 1.87 3 2000 - 2001 50.13 24.91 25.22 2.02 4 2003 - 2004 53.22 26.47 26.75 2.02 5 2004 - 2005 54.30 27.00 27.30 2.02 6 2005 - 2006 55.40 27.54 27.86 2.02 7 2006 - 2007 56.52 28.10 28.42 2.02 8 2007 - 2008 57.50 28.58 28.92 1.75 9 2008 - 2009 58.38 29.03 29.35 1.52 10 2009 - 2010 59.13 29.40 29.73 1.29 Main facts abstract from Geography of Myanmar Mandalay 1} According to the land form and climate of Myanmar, there are rich hydro power resources in Northern and Eastern Regions of Myanmar. There are more than 15 Hydro Power Resources which were the capacity >1000MW in that regions. 2) Myanmar have the border with the China, India and Thailand. Therefore the power trade to these country can be achieved. Naypyitaw Yangon 3) Yangon is the most populated region and it has about 7 millions peoples. Yangon has the main sea port and Industry Zones. Therefore, Yangon is the biggest load center of Myanmar. Mandalay, Naypyitaw and Ayeyarwaddy regions are also have the high population density and the power demand is increasing rapidly. 9 10 11 12 Background History • • • • • The voltage levels of the Myanmar electrical power system are – 230 kV – 132 kV – 66 kV – 33 kV – 11 kV. The national grid has no direct connections to other grids of neighboring countries. The network comprises 42 overhead lines at 230 kV with a total length of 3015 km 35 overhead lines at 132 kV with a total length of 2058 km 16 overhead lines at 66 kV with a total length of 587 km 11 overhead lines at 33 kV having a total length of 27 km. The 230 kV and 132 kV overhead lines are interconnecting approximately 50 substations. The above details are valid for the transmission system only and do not include the distribution network. Power Stations in Myanmar (as of Dec’ 2012) 13 Existing Power Station (Hydro, Gas-fired and Coal-fired Thermal) Hydropower Output (MW) Gas-fired Output (MW) 1 Baluchaung -1 28 1 Kyungchaung 54.3 2 Baluchaung -2 168 2 Mann 36.9 3 Yeywa 790 3 Shwedaung 55.35 4 Kinda 56 4 Mawlamyaing 5 Sedawgyi 25 5 Myanaung 34.7 6 Zawgyi -1 18 6 Hlawga 154.2 7 Zawgyi -2 12 7 Ywama 70.3 8 Thapanzeik 30 8 Ahlone 154.2 9 Mone 75 9 Thaketa 92 10 Paunglaung 280 10 Thaton 50.95 11 Kabaung 30 Subtotal 714.9 12 Yenwe 25 13 Zaungtu 20 14 Shweli -1 600(300) 15 Keng taung 54 16 Shwegyin 75 17 Kun 60 18 Kyeeon Kyeewa 74 19 Dapein-1 240(60) Subtotal 2660(2180) Coal-fired 1 Tigyit 12 Output (MW) 120 Existing Power System Total = 3,490.9(2950.9)MW Note: Output in parentheses is power supply to Myanmar from JV Projects. Location of Existing Power Stations (as of Dec’ 2012) India China 16 Bangladesh 14 Myanmar 8 3 Mandalay 15 6 2 5 A 13 9 19 BNay Pyi Taw4 1 10 C Bay of Bengal Ayeyawaddy River E 12 18 17 11 J 7 F G HI D Yangon Sittaung River Existing Power Station 1 Baluchaung -2 2 Kinda 3 Sedawgyi 4 Baluchaung – 1 5 Zawgyi -1 6 Zawgyi -2 7 Zaungtu 8 Thapanzeik 9 Mone Hydro 10 Paunglaung 11 Yenwe 12 Kabaung 13 Kengtawng 14 Shweli -1 15 Yeywa 16 Dapein-1 17 Shwegyin 18 Kun 19 Kyeeon Kyeewa A Kyungchaung B Mann C Shwedaung D Mawlamyaing E Myanaung Gas-fired F Hlawga G Ywama H Ahlone I Thaketa J Thaton Coal-fired α Tigyit ラオス α Thanlwing River Thailand 14 Output (MW) 168 56 25 28 18 12 20 30 75 280 25 30 54 600 (300) 790 240 (60) 75 60 74 54.3 36.9 55.35 12 34.7 154.2 70.3 154.2 92 50.95 120 ベトナム COD 1960/1974 1985 1989 1992 1995 1998 2000 2002 2004 2005 2007 2008 2009 2009 2010 2011 2011 2012 2012 1974 1980 1984 1980 1975/1984 1996/1999 1980/2004 1995/1999 1990/1997 1985/2001 2004 シャム湾 Note: Output in parentheses is power supply to Myanmar from JV Projects. 15 Power Supply Status of Myanmar in 2012(Dry and Rainy Season) Dry season: May 18, 2012 1,298 MW (10:00) Rainy season: October 18, 2012 1796 MW (20:00) (Maximum power supply as of December 31, 2012) 16 Power Plants Under Construction and Planning (up to 2016) Hydropower 1 2 Upper Paunglaung Nancho Output (MW) COD 140 2014 40 Gas-fired 1 2014 Output (MW) COD 52 2013 Hlawga (Gas Engine) Hlawga (3 Units) 3 Phyu 40 2014 9 Chipwenge 99 2012 10 Baluchaung-3 52 2013 11 Thaukyegat 120 2013 12 Upper Baluchaung 29 2015 Subtotal 520 Total Install Capacity = 2060.6 MW 543 2 Thaketa (Gas Engines) 123 2014 246 2015 174 2016 2013 53.6 Thaketa (3Units) 500 166 2014 166 2015 168 2016 3 Ahlone 100 2014 4 Ywa Ma 292 2013 Subtotal 1540.6 Location of Power Stations under Construction and Planning (as of December’ 2012) l India China Power Station under construction and planning a Upper Paunglaung 16 Bangladesh 14 h Myanmar p 8 15 6 2 5 A k g 3 Mandalay o α 9 Nay Pyi Taw4 i 19 B d a 1 10b m e Bay of Bengal Ayeyawaddy River C E 12 Thanlwing River j 18 17 11 J 7 F G HI D COD 140 2014 Nancho 40 2014 c Phyu 40 2014 d Middle Paunglaung 100 2018 e Tha-htay 111 2018 f Upper Keng Tawng 51 2018 g Upper Yeywa 280 2019 h Shweli -3 ベトナム Ann ベトナム Bawgata 1050 2020 10 - 168 - k Upper Bu 150 - l Chipwinge m Baluchaung-3 n Thaukyegat 120 2013 o Upper Baluchaung 29 2015 p Manipur 380 - シャム湾 99 2012 シャム湾 52 2013 Thailand Sittaung River Ⅰ Ⅱ Ⅲ IV Hydropower (existing)(Yangon Region) 52 123 246 174 52 166 166 168 2013 2014 2015 2016 2013 2014 2015 2016 Ⅰ Hlawga 543 Ⅱ Taketa 500 Ⅲ Ahlone 100 2013 IV Ywama 292 2013 Yangon Power Station GasFired Gas-fired (existing) Coal-fired (existing) Output (MW) b ラオスi ラオスj f 13 n c Hydropower 17 18 19 Monthly Generation in GWh (2009 to 2012) Month Janurary Februrary March Apri May Jun July August Setember October November December Total 2009 509 471 528 508 516 522 607 672 651 672 601 573 6830 2010 520 485 568 562 538 568 723 767 767 774 773 765 7810 2011 771 722 819 795 824 829 888 892 860 892 869 873 10034 2012 856 840 910 824 792 843 945 950 950 981 974 939 10804 Jun July August 2009 2010 2011 2012 December November October 573 601 672 651 773 765 910 974 873 939 869 981 950 892 860 892 950 888 945 829 843 774 767 767 723 795 824 819 840 824 792 722 672 607 568 522 538 516 562 508 700 Setember May 568 528 485 856 1000 Apri March 500 471 800 771 900 Februrary 520 509 600 Janurary 20 Monthly Generation in GWh (2009 to 2012) 400 300 200 100 0 Monthly Power Generation(by Power Producer) (2007 to 2012) 21 Monthly Power Generation (2007.01 - 2012.08) 1,000 800 MOEP1 HPGE MEPE Others Total 700 600 500 400 300 200 100 Jul-12 Apr-12 Jan-12 Oct-11 Jul-11 Apr-11 Jan-11 Oct-10 Jul-10 Apr-10 Jan-10 Oct-09 Jul-09 Apr-09 Jan-09 Oct-08 Jul-08 Apr-08 Jan-08 Oct-07 Jul-07 Apr-07 0 Jan-07 Power Generation (GWh/month) 900 Month Yenwe (25MW) COD: Feb. 2007 Kabaung (30MW) COD: Mar. 2008 Shweli -1(600MW) COD: May. 2009 Kengtawng (54MW) COD: Mar. 2009 Yeywa (790MW) COD: Dec. 2010 Shwegyin (75 MW) COD: Oct. 2011 Kun (60MW) COD: Jul. 2012 Kyeeon Kyeewa (74 MW) COD: Aug. 2012 Monthly Net System Energy Demand(by Supplier) (2007 to 2012) 22 Monthly Energy Consumption (2007.01 - 2012.08) 1,000 Total YESB ESE 800 700 600 500 400 300 200 100 Jul-12 Apr-12 Jan-12 Oct-11 Jul-11 Apr-11 Jan-11 Oct-10 Jul-10 Apr-10 Jan-10 Oct-09 Jul-09 Apr-09 Jan-09 Oct-08 Jul-08 Apr-08 Jan-08 Oct-07 Jul-07 Apr-07 0 Jan-07 Energy Consumption (GWh/month) 900 Month Yenwe (25MW) COD: Feb. 2007 Kabaung (30MW) COD: Mar. 2008 Shweli -1(600MW) COD: May. 2009 Kengtawng (54MW) COD: Mar. 2009 Yeywa (790MW) COD: Dec. 2010 Shwegyin (75 MW) COD: Oct. 2011 Kun (60MW) COD: Jul. 2012 Kyeeon Kyeewa (74 MW) COD: Aug. 2012 Power Consumption (1990 to 2009) 23 Power Consumption(by Use) 一般、家庭用 Household 一般、家庭用 工業用 Industrial 工業用 Power Consumption(by Use) (FY 2009) 商業用 Commercial Others (lighting) 商業用その他(外灯等) その他(外灯等) 6,000 000 4,000 3,000 一般、家庭 Household 用, 2,015GWh, 41% 1,000 000 1990 1995 2000 2003 000 2004 2005 2006 2007 2008 Industrial 工業用, 1,850GWh, 37% 2009 Fisical year Power Consumption per Consumer 2,500,000 2,500,000 - 2,500,000 2,500,000 2003 2004 2005 2006 2007 4,000 Fisical year 1,500,000 1,500,000 1,500,000 1,500,000 3,000 1,000,000 1,000,000 1,000,000 1,000,000 2,000 500,000 500,000 500,000 500,000 1,000 2008 4,000 2009 4,000 4,000 3,000 3,000 3,000 2,000 2,000 2,000 1,000 1,000 1,000 0 0 0 0 1990- 1995 2000 2003 2004 2005 2006 2007 2008 2009 1990 1995 2000 2004 2005 2006 1990 1995 2000 20032003 2004 2005 2006 2007 2008 2007 2009 2008 2009 1990 1995 2000 2003 year 2004 2005 2006 2007 2008 2009 Fisical year FisicalFisical year Fisical year Consumers Consumption per consumers (KWh/consumer) Consumers Consumption per consumers (KWh/consumer) Consumers Consumption per consumers (KWh/consumer) Consumers Consumption per consumers (KWh/consumer) -- - 5,000 5,000 5,000 5,000 Comsumed Energy per Consumer (kwh/Consumer) Number of Consumers (No.) Number of Consumers (No.) 1990 1995 2000 2,000,000 2,000,000 2,000,000 2,000,000 Number of Consumers (No.) その他(外灯 Others (lighting), 等), 57GWh, 57 GWh, 1% 1% 2,000 (kwh/Consumer) 000 Commercial 商業用, 1,071GWh, 21% 5,000 Comsumed Energy per Consumer (kwh/Consumer) Comsumed Energy per Consumer Comsumed Energy per Consumer (kwh/Consumer) 000 Power Generation (GMh) 000 Since 2006, the number of consumer has increased, however, power consumption per consumer has decreased. → Restriction of power consumption (ex. planned outage) is thought to be one of the reasons of the reduction above. 24 Energy Mix (MWh) (by Power Producer)2009 Energy Mix (MWh) (by Power Producer)2010 217,406 3% 1,578,856 23% 351,515 5% 1,802,754 23% 5,656,509 72% 5,033,601 74% Hydro Station (MWh) Gas-Fired Station (MWh) Coal-Fired Thermal Station (MWh) Energy Mix (MWh) (by Power Producer)2011 Gas-Fired Station (MWh) 266,223 3% 2,845,575 26% 7,177,899 71% Hydro Station (MWh) Gas-Fired Station (MWh) Coal-Fired Thermal Station (MWh) Coal-Fired Thermal Station (MWh) Energy Mix (MWh) (by Power Producer)2012 379,328 4% 2,476,327 25% Hydro Station (MWh) 7,722,780 71% Hydro Station (MWh) Gas-Fired Station (MWh) Coal-Fired Thermal Station (MWh) Current Installed Generation Capacity and Maximum Demand 3194MW 90 109 Power flow 240 76 265 125 35 63 (*)Summation of maximum load of each 230 and 132kV substation 63 Demand of Yangon Region occupies 50% of Myanmar’s demand. 1913MW Total Demand (*) 504 508 Total Installed Generation Capacity 60 1151 Some large hydropower plants in northern area 25 892 50 (Demand data in Kachin, Chin, Rakhaing, Kaya Kayin and Tanintharyi is not obtained.) Legend 471 Installed Capacity Maximum Demand ⇒Generation gap between supply and demand (approx 400MW) is supplied through 230kV bulk TL Unit[MW] 26 Electrification Ratio No Description 1 Population 2 Numbers of Household 3 Electrified Household 4 Percentage Quantity 59.78 million 8.92 million 2.575 million 28.86 % 1 % increment in electrified household covers 89,200 households and is expected to be consumed 18187 MWh/yr. 27 (MW) 20000 19215 18000 16978 16000 15008 14000 13274 12000 11746 10400 10000 9213 8167 8000 7243 6416 6000 5686 5024 4442 4000 2000 0 1806 2155 2426 2732 3078 3477 3929 (YEAR) 29 30 Transmission Lines Under Construction Estimated target period of completion - 2013 No From To kV Length (km) Region/ State Objective To Supply Mon State & strengthen National Grid To supply Yangon Grid 1 ThaHton Maw la Myaing 230 80.50 Mon 2 Thar ke ta East – Dagon 230 16.09 Yangon 3 Balu chaung-2 Shwe myo 230 193.12 Kayar 4 Upper Yeywa Shwe sar yan 230 128.75 Mandalay 5 Balu chaung-3 Balu chaung-2 132 5.79 Kayar To connect Balu chaung-3 HPP 6 Wah-Shaung Winemaw 132 17.3 Kachin To connect Chi-bwenge HPP To strengthen National Grid To connect upper Yeywa HPP 31 KACHIN STATE Sr. Project Name 2012-2013 Project Plan 1. CHIBWENGE (99 MW/2012) Winemaw-Myintkyina 66kV Transmission Line (1)(2)(3) MYITKYINA(1,2,3) (30)mile WASHAUNG HPAKAN WAINGMAW (MYITKYINA) 2. Mogaung- Myitkyina 66kV Transmission Line (42)miles MOGAUNG 2013-2014 Project Plan 1. 66/11kV, 10MVA Myintkyina (1) (2)(3)Substation 2. Bhamo-Nabar-Ngapyawdaing-Ohntaw 230kV MOHNYIN TAPEIN (240 MW) NABAR Transmission Line (285) miles & Substations 3. Bhamo-Myothit-Dawponyan 66kV Transmission Line DAWPONYAN KYAUKPAHTO (34)miles & Substations THAPHANSEIK (30 MW) 2014-2015 Project Plan 1. MUSE NAMKHAN SHWEKU TAGAUNG Mogaung-Hpakan 66kV Transmission Line (55)miles & ဘဘဘဘဘ Substations SHWELI (600 MW) BHAMO ဘဘဘဘ ဘဘဘဘဘ KALEWA MOGOK NGAPYADAING LETPANHLA ဘဘဘဘ ဘဘဘဘဘ ဘ SEDAWGYI (25 MW) THEINNI MANSAN YADANARPON NANSAN LASHIO MONYWA GANGAW MYITTHA 40 MW KYAW (Ka.Pa.Sa) NYAUNGBINGYI MYAUKPYIN AUNGPINLE HSIBAW PYINOOLWIN CHAUNGKU PAKHANGE INDUSTRIAL ZONE OHNTAW SHWESARYAN 3 AUNGPANG AUNGTHAPYE THAPYAYWA (MEIKHTILA) KENGTAUNG 54 MW PINPET THAZI KALAW MOENAL YEPAUNGSON SHWEMYO SONSAE KAYAR STATE TIKYIT NAYPYITAW(2) LINKHAE MAGWAY ဘဘ Sr. PINLAUNG Project Name 2012-2013 Project Plan NAYPYITAW SHARTAW TAUNGDWINGYI 1. BALUCHAUNG(1) (28 MW) PYINMANA LOIKAW Baluchaung(2)-ShweMyo 230kV Line (120)miles & Substation THEPHYU BALUCHAUNG(2) (168 MW) KYAUKSWEKYO Baluchaung(3)- Baluchaung(2)132kV Transmission Line (4) miles & Substations 2. KALAMA 2014-2015 Project Plan KHAPAUNG (30 MW) ဘ ဘဘ NAMSAN YINMARBIN ဘ ဘဘ ဘ LOILEM TAUNGOO BALUCHAUNG(3) ( 52 MW/2013) PHARSONG 1. Loikaw-ShreTaw 66 kV Transmission Line (45)Miles & Substations PAUK KAUNG PHYU (40 MW/2013)0 KUN SHEWDAUNG (3 x 18.45 MW) (60 MW) 2. Substations SHWEKYIN (75 MW) YENWE(25 MW) ZAUNGTU (20 MW) MYANAUNG (1X 16.25 MW) (1X 18.45 MW) Loikaw- Bawlakhe 66 kV Transmission Line (60)Miles & 3. THARYARGONE KAMARNAT Bawlakhe - PharSong 66 kV Transmission Line (40)Miles & Substations 4. Baluchaung(2)- Loikaw 132kV Transmission Line (12) miles & Substation MYAUNG TAGAR KAYIN STATE Sr. 33 Project Name 2012-2013 Project Plan THATON (2 x 16.25 MW) (1 x 18.45 MW) HLANINGBWE 1. PaAn-Industrial Zone 66 kV Transmission Line (17) miles & Substation 2013-2014 Project Plan PAAN INDUSTRIAL ZONE 1. PaAn-Phayangone(Zartapyin) 66/11kV, 5MVA Substation 2014-2015 Project Plan ဘဘဘ MYAWADDY MYAINGGALAY PHAYARGONE 1. Mawlamyine-Kawkareik-Myawaddy 230kV Transmission Line (80) miles & Substations 2. KAWKAREIK MAWLAMYINE (12 MW) CHAUNGSONE YE DAWEI PaAn - Hlaningbwe 66kV Transmission Line (27)miles & Substations CHIN STATE 34 NABAR ဘဘဘ Sr. Project Name KYAUKPAHTO ဘဘ 2012-2013 Project Plan 1. THAPHANSEIK (30 MW) Kyaw-Gangaw-Haka 66kV Transmission Line (89) miles & TAGAUNG THINEGIN Substation KALEWA ဘ 2013-2014 Project Plan 1. SHWEKU Hakha-Falam-Thinegin 66kV Transmission Line (50) NGAPYADAING KALE FALAM HAKHA LETPANHLA SEDAWGYI (25 MW) miles& Substation MONYWA 2. Pauk-Mindat 66kV Transmission Line (35) miles & AUNGPINLE GANGAW Substation MYITTHA 40 MW NYAUNGBINGYI KYAW MYAUKPYIN INDUSTRIA ZONE PAKHANGE CHAUNGKU OHNTAW BELIN PAKKHOKKU PAUK MINDAT MYINGYAN KYUNGCHAUNG (3 x 18.1 MW) SAW (KA.PA.SA) Project(N) MYINGYAN (INDUSTRY) Project(L) KYAUKTAW MRAUK-U PONNAGYUN MINBYA ဘဘဘဘ TANYAUNG Project(P) SAYTOTETAYAR MONE 75 MW KYEEON KYEEWA 70 MW THAZI CHAUK YEPAUNGSON MANN(MINBU) 2 X 18.45 MW SHWEMYO NAYPYITAW(2) MAGWAY SITTWE ANN YINMARBIN THAPYAYWA (MEIKHTILA) NGAPHE SONSAE PINLAUNG ဘဘဘ (၅၅ဘဘဘဘဘဘဘဘ) MON STATE Sr. Project Name 2012-2013 Project Plan SHWEKYIN ဘဘဘဘဘဘဘ ဘ(75 MW) 1. Thaton-Mawlamying 230kV Transmission Line (50) miles & Substation 2013-2014 Project Plan 1. 66/11kV, 20MVA & 66/33kV, 20MVA Mawlamyine Substation ဘဘ 2014-2015 Project Plan THATON (2 x 16.25 MW) (1 x 18.45 MW) HLANINGBWE ဘ PHAAN 1. INDUSTRIAL ZONE Substations 2. ဘဘဘဘ MYAWADDY MYAINGGALAY Mawlamyine-Chaungsone 66kV Transmission Line (18) miles & Mawlamyine- Thanbyuzayat 66kV Transmission Line (35) miles & Substations PHAYARGONE KAWKAREIK MAWLAMYINE (12 MW) CHAUNGSONE THANBYUZAYAT YE 35 Project(N) SAW RAKHINE STATE 36 Project(L) Project(P) Sr. Project Name KYAUKTAW TANYAUNG SAYTOTETAYAR BUTHIDAUNG 2012-2013 Project Plan PONNAGYUN 1. Ann-Ponnagyun 230 kV Transmission Line (120) miles & Substations 2. Oakshitpin-Taungup-Maei-Ann 230 kV Line (139) miles & Substations (ဘ CHAUK MYAUK-U MONE (75 MW) KYEEON KYEEWA 70 MW MINBYA MANN ဘဘဘ MAGWAY 3. Mann-Ann 230 kV Transmission Line (80) miles & Substations SITTWE 2013-2014 Project Plan 1. Maei-Kyaukphyu 230 kV Transmission Line (65) miles 2. Kyaukphyu 230 kV Substation-Kyaukphyu 66 kV Line (5) miles & KYAUKPHYU TAUNGTWINGYI SINPAUNGWE MAEI Project(C) AUNGLAN Ponnagyun-Sittwe 66 kV Line (22) miles & Substations RAMREE PYAE ဘဘဘ SANTE 4. Ponnagyun-MyukOo 66 kV Line (35) miles & Substations 5. Ponnagyun-Kyauktaw 66 kV Transmission Line (40) miles & Substations 6. Kyaukphyu-Ramree 6 6 kV Transmission Line (41) miles & Substations 7. TAUNGUP OAKSHITPIN THAHTAY 111 MW THANTWE MANTHONE Taungup-Thandwe 66 kV Transmission Line (30) miles & Substations 2014-2015 Project Plan 1. Kyauktaw-Buthidaung 66 kV Transmission Line (35) miles & Substations 2. Maruk U-Minbya 66 kV Transmission Line (20) miles & Substations 3. Thandwe-Kyeintali-Gwa 66 kV Line (84) miles & Substations 4. Athoke-Gwa 66 kV Transmission Line (62) miles & Substations ဘ KYAWSYA Substations 3. ဘ ဘဘ ANN NGEPHAE ဘဘ (၅၅ဘ KYANKIN MYANAUNG KYEINTALI GWA HINTHADA ဘ YEKYI THABAUNG ATHOKE ဘဘ TAPEIN DAWPHONEYAN NABAR SHAN STATE 37 MUSE SHWELI-1 Sr. NANKHAN SHWEKU Project Name BAMAW 2012-2013 Project Plan 105 MILE TAGAUNG TAUNG LAUKKAING 1 Kalaw-Pindaya 66 kV Transmission Line (22) miles & Substations 2 Kholan-Konhein 66 kV Line (33) miles & Substations 3 Lashio-Mineyal-Tantyan 66 kV Line (87) miles & Substations 4 Theinni-Tarmonye-Laukkaing 66 kV Line (75) miles & Substations 5 Aungthapye-Naungka 66kV Line (17) miles & Substations MOGOK ဘ LATPANHLA TARMONYE THEINNI SEDAWGYI 60 MW KUTKAI MANSAN YADANARBON NANSAN LASHIO TANTYAN AUNGPINLE HSIBAW MYAUKPYIN PYINOOLWIN ဘဘဘ KYETHI INDUSTRIAL ZONE MINEYAL 2013-2014 Project Plan MONGHSU SHWESARYAN MONG-NAUNG BELIN YEYWA ZAWGYI (2) 12 MW WANSIN ZAWGYI (1) 18 MW MONGKUNG 1 132/66 kV, 100 MVA Taungyi Substation 2 66/11 kV, 5 MVA Laihka Substation 3 Mong Naung-Mongshu 66 kV Line (33) miles & Substations 4 Upper Baluchaung-Kalaw 66 kV Transmission Line (20) miles KONHEIN LAIHKA PINDAYA LOILEN NANSAN AUNGTHAPY E YINMARBIN TAUNGYI PINPAT YEPAUNGSON KALA W SHWEMYO TIKYIT ဘဘ(၅) MOENAL HIS-HSENG UPPER LINKHAE BALUCHAUNG KHOLA N 2014-2015 Project Plan 1 Mansan-Theinni 230 kV Line (60) miles & Substations 2 Theinni-Kutkai-105 mile(Muse) 66kV Transmission Line (60) miles & KENGTAUNG Substations 3 Taungyi-Hsihseng 66kV Line (44) miles & Substations 4 Mong Naung-Kyethi 66 kV Line (30) miles & Substations PAUNG LAUNG ဘဘဘဘ PYINMANA MOGAUNG SAGAING DIVISION Sr. MOHNYIN 38 Project Name 2013-2014 Project Plan NABAR THAPHANSEIK 30 MW 2 Gangaw-Kale 230 kV Transmission Line (80) miles & Substation 3 132/66kV, 100MVA၅Extension at Kyaukpahto Substation ဘဘဘဘဘ ၅ ဘဘဘဘဘ ၅၅၅ ဘဘဘ MOGOK ဘဘဘဘဘဘဘဘ KALAYWA NGEPYAWDAING LATPANHLA SEDAWGYI 25 MW MONYWA (AUNGCHANTHAR) NYAUNGBINGYI 132/33 kV, 2 x 50 MVA Monywa Substation 2014-2015ဘဘဘ Project Plan KALE KYAW 1 ဘဘဘဘဘဘ(၅) KYAUKPAHTO THINEGIN ဘဘဘဘဘဘ AUNGPINLE MYAUKPYIN ဘဘ ၅ ဘဘဘဘဘဘဘဘဘဘ ၅ ၅ ၅ 1 Thinegin-Kale-Kalewa 66 kV Transmission ၅ ဘဘဘဘဘ ဘဘဘ ၅ ဘဘဘဘဘဘ ၅ ဘဘဘဘဘ ၅ ဘဘဘဘဘဘဘဘ ဘဘဘဘဘဘဘ ဘဘဘဘဘ ဘဘဘဘဘဘဘဘဘဘ ၅ ၅ ၅ ၅ ဘဘဘဘဘဘဘဘ ဘဘဘဘဘဘဘဘဘ ဘဘဘဘဘ ဘဘဘဘဘ INDUSTRIAL ဘဘဘဘဘ ဘဘ ဘဘဘဘဘဘဘဘ ၅ ၅ PAKHANGE ၅ CHAUNGKU ၅ ဘဘဘဘဘ BELIN PAKHOKKU ဘဘဘဘဘဘဘ(၅)(၅၅ဘဘဘဘဘဘဘဘဘဘ PAUK ဘဘဘ) ဘ MYINGYAN ဘဘဘဘဘဘဘ(၅)(၅၅ဘဘဘဘဘ ဘဘဘ ဘဘဘ) ဘဘဘဘဘဘ ဘဘဘ KYUNGCHAUNG ဘဘဘ ဘ MYINGYAN ဘဘဘ Project(N) ၅ SAW (STEEL MILL) ဘဘဘ ၅ (L) ဘဘဘဘဘဘဘဘဘ ဘဘဘ ဘဘဘဘဘဘ ဘဘဘ ဘဘဘဘ Project(P) ဘဘဘဘ ဘဘဘဘ YINMARBIN TANYAUNG ဘဘဘဘ SAETOTETAYAR ဘ THAPYIWA ဘ ဘဘဘဘဘဘဘဘဘဘဘဘဘ ဘဘဘဘဘဘဘ THAZI ၅ CHAUK ၅ ဘဘဘဘဘဘ ၅ YEPAUNGSON MONE (75 MW) ၅ GANGAW OHNTAW Line (30) miles MONYWA NYAUNGBINGYI MYAUKPYIN ဘဘဘဘဘဘဘဘဘဘဘ MANDALAY DIVITION HSIBAW PYINOOLWIN TAGuNTAING UPPER YEYWA INDUSTRIAL ZONE OHNTAW PAKHANGYI Sr. SHWESATYAN ဘဘဘဘဘဘဘ Project Name 2012-2013 Project Plan PAKOKEKU NGAZON BELIN INGONE YEYWA ZAWGYI(1) 12 MW MYINGYAN ဘဘဘဘ ZAWGYI(2) 18 MW LAIHKA TAUNG_T KWN MYINGYAN (STEEL MILL) KINDA 1. Upper Yeywa- Shwesaryan 230kV Line (80) miles 2. 230/33 kV,100MVA Naypyitaw(2) Substation 3. Meikhtila-Taungoo 500 kV Transmission Line (146) miles 4. Myogyi-Taungtawkwn 33kV Transmission Line (10) miles MYOGYI LOILEN AUNGPAN ဘဘဘဘဘဘ ဘဘဘဘဘဘ 2013-2014 Project Plan AUNGTHAPYAE YINMARBIN THAPYAWA 1. PINPET THAZI CHAUK KALAW YEPONSONE SHWEMYO LINKHAE 3. 132/66 kV, 60 MVA Letpanhla Substation 4. 66/33 kV, 30 MVA Mogok Substation 2014-2015 Project Plan PAUNGLAUNG SONSE BALUCHAUNG(1) 28 MW PYINMANA TAUNGTWINGYI SINPAUNGWE THEPHYU AUNGLAN KYAWSWA BALUCHAUNG(2) 160 MW KALAMA KYAUKSWEKYO SINTE 132/33 kV, 100 MVA Industrial Zone Substation NAYPYITAW MANN PYAE 2. TIKYIT NAYPYITAW(2) MAGWAY 132/33 kV, 100 MVA Taguntaing Substation ဘဘဘဘဘဘဘဘဘဘဘဘဘ 1. 132/33 kV, 2 x 50 MVA Thazi Substation 2. Chauk-Nyaungoo 66 kV Line (28) miles & Substation 3. MyinChan-NgaZon 66kV Line (10)Miles & Substations 4. ThapyaWa 500/230kV Substation 5. AungPinlae 132/33kV, (20)MVA Substation BALUCHAUNG(3) 52 MW KAPAUNG 30 MW TAUNGOO 2015-2016 Project Plan 1 230 /33kV, 100 MVA Thapyaywa(Meikhtila) Substation 39 ဘဘဘဘဘဘဘဘဘဘ KYAW (KA.PA.SA) GANGAW NYAUNGBINGYI PAKHAGYI MYITTHA 40 MW ၅၅ INDUSTRIAL ZONE OHNTAW CHAUNGKU MAGWAY DIVISION ဘဘဘဘဘဘဘဘဘ ဘဘဘဘဘဘဘဘ Sr 40 ဘဘဘဘဘဘဘ Project s Name PAKKHOKKU 2012-2013 Project Plan ဘဘဘဘဘ ဘဘဘဘဘ ဘဘဘဘဘဘဘ(၅)(၅၅ဘဘဘဘဘ ဘ ဘဘဘ) INGONE PAUK MINDAT MYINGYAN 1 KYUNGCHAUNG SAW (KA.PA.SA) 1 KINDA 56 MW YINMARBIN THAPYAYWA (MEIKHTILA) SAYTOTETAYAR 3 THAZI CHAUK MONE 75 MW 230/66 kV, 100 MVA Chaungku & 66/35 kV, 60 MVA Pauk ဘဘဘဘဘဘဘ ဘဘဘဘဘဘဘဘဘဘဘဘဘ Subsations. ဘဘဘဘ YEPAUNGSON ဘဘဘဘဘဘ 2014-2015 Project Plan ဘဘဘဘဘဘ SHWEMYO KYEEON KYEEWA 70 MW Mann-Taungdwingyi 230 kV Line (85) miles & Substations. ဘဘဘဘဘဘဘဘဘ ဘဘဘဘဘဘဘဘဘ ဘဘဘဘဘဘ 2ဘဘဘဘဘဘဘဘဘ Tanyaung-Saw 66 kV Transmission Line (45) miles & Substations. PROJECT-P TANYAUNG NAYPYITAW(2) MAGWAY NGAPHE 230 /66 kV, 100 MVA Taungdwingyi Substation. ဘဘဘဘဘဘဘ(၅)(၅၅ဘဘဘဘဘ ဘဘဘဘဘဘ ဘဘဘဘဘဘ 2013-2014 ဘဘဘ) Project Plan MYINGYAN (NGAZON) PROJECT-N ECT-L ဘ ဘဘဘဘဘဘဘဘဘဘဘ MYAUKPYIN 1 ဘဘဘဘဘဘဘ230 kV Line (60) miles & Substations. Gangaw-Chaungku 2 Myittha-Gangaw 66 kV Transmission Line (25) miles 3 Thapyaywa-Chauk-Minbu 230 kV Line (145) miles & Substations. NAYPYITAW MANN(MINBU) 2 X 18.45 MW SONSAE ဘဘဘဘဘဘဘဘဘဘဘဘ ဘဘဘဘဘဘဘဘဘဘဘဘ(၅) 4 (၅၅ဘဘဘဘဘဘဘဘ) Kyungchaung-Mann 230 kV Line (90) miles & Substations. PYINMANA TAUNGDWINGYI SINPAUNGWE PROJECT-C AUNGLAN THAYET KANMA 5 THEPHYU ဘဘဘဘဘဘဘဘဘဘဘဘ(၅) 6 Aunglan-Thayet 66 kV Line (10) miles & Substations. (၅၅၅ဘဘဘဘဘဘဘဘ) KALAMA KYAUKSWEKYO KYAWSWA PYAY KHAPAUNG (30 MW) 7 Oakshitpin-Kanma 66 kV Line (30) miles & Substations. ဘဘဘဘဘဘဘဘဘဘဘဘ(၅) (၅၅ဘဘဘဘဘဘဘဘ) 2015-2016 Project Plans SINDE Taungoo PAUK KAUNG PHYU (40 MW/2013) OAKSHITPIN Taungdwingyi-Aunglan 132 kV Line (66) miles & Subsations. SHEWDAUNG KUN 1 132/66 kV, 60 MVA Pakkhokku(Budhakone) Substation AUNGPANG LOILEM AUNGTHAPYE NAMSAN BAGO DIVISION THAZI THAPYAYWA (MEIKHTILA) YINMARBIN PINPET ဘ Sr Project Name PINPET YEPAUNGSON 2012-2013 Project Plan SHWEMYO TIKYIT 1 Shwedaung-Myaungtagar 230kV Transmission Line (130) miles 2 230/33 kV, 100 MVA Kamarnat Substation 3 230/33 kV, 100 MVA Minhla Substation 4 230/33 kV, 100 MVA Sittaung Substation NAYPYITAW(2 ) MAGWAY PAUNGLAUNG NAYPYITAW SONSAE BALUCHAUNG(1) (28 MW) PYINMANA TAUNGDWINGYI GWE 2013-2014 Project Plan 1 Taungoo-Kamarnat 500 kV Transmission Line (117) miles 2 Karmanat-Myaungtagar 500 kV Transmission Line (50) miles 3 Thaukyekhat(2)-Taungoo 230 kV Transmission Line (13) miles 4 Taungdwingyi-Shwedaung 230kV Transmission Line (100) miles & THEPHYU KALAMA LAN BALUCHAUNG(2) (168 MW) KYAUKSWEKYO BALUCHAUNG(3) ( 52 MW) KHAPAUNG (30 MW) PYAY THAUK-YE-KHAT (120 MW /2013) PAUK KAUNG PHYU TAUNGOO 2014-2015 Project Plan KUN SHEWDAUNG (60 MW) YENWE MINHLA (25 MW) ZAUNGTU (20 MW) Substations 1 Taungoo-Shwedaung 230 kV Line (110) miles & Substations 2 Baluchaung(2)-Taungoo 230kV Line (96) miles & Substations 3 500/230 kV, 500 MVA Kamarnat Substation 4 500/230 kV, 500 MVA Taungoo Substation SHWEKYIN THARYARGONE SITTAUNG MYANAUNG KAMARNAT 2015-2016 Project Plan MYAUNG TAGAR HINTHADA EAST DAGON 1 Minhla-Hinthada 230 kV Line (60) miles & Substations 41 AYEYARWADDY DIVISION SHEWDAUNG OAKSHITPIN NYAUNGCHE DAUUK Sr Project Name 42 ဘ ဘ ဘဘဘဘ MINHLA MATHONE ဘ (၅၅ 2012-2013 Project Plan KYANKIN 1 MYANAUNG Athoke-Pathein 230kV Line (40) miles & Substations. 2013-2014 Project Plan MYAUNG TAGAR 1 Pathein-Chaungthar 66kV Line (35) miles & Substations. 2 Pathein-Ngwesaung 66kV Line (30) miles & Substations. 3 Pathein-Kanni 66kV Line (7) miles & Substations. 4 Hlaingtharyar-Kyaiklat 230kV Line (30) miles & Substations. HINTHADA YEGYI DANUBYU YWAMA 2014-2015 Project Plan ဘဘဘဘဘ ATHOKE THARBAUNG 1 HLAWG LAYMYATNAR BAYINTNAUN Hinthada-Athoke 230 kV Line (80) miles CHAUNGTHAR 2 HLAINGTHARYAR Oakshitpin-Hinthada 230kV Line (95) miles & Substations. PATHEIN AHLON KANGYIDAUNT 3 Hlaingthayar-Kyaiklat 66kV Line (30) miles & Substations. MYAUNGMYA NGWESAUNG 4 Kyaiklat-Pyapon 66 kV Line (15) miles & Substations. 5 Kyaiklat-Bokalay 66kV Line (35) miles & Substations. 6 Hinthada - Laymyatnar 66kV Line (15) miles & Substations. 7 Hinthada - Danubyu 66kV Line (35) miles & Substations. 8 66/11kV, 2 x 10 MVA Hinthada Substaion KYAIKLA T KANNI LAPUTTA BOKALAY PYAPON Sr. PHYU YANGON DIVISION Project Name 2012-2013 Project Plan OAKSHITPIN KUN (60 MW) SHEWDAUNG MATHONE THARYARGON E ZAUNGT U (25 MW) KYANKIN Thaketa- East Dagon 230kV Line (10) miles & Substations. 2 230/33 kV, 100 MVA Myaungtagar Substation 3 230/33 kV, 2 x 100 MVA Hlawga Substation 4 230/33 kV, 100 MVA Hlaingtharyar Substation SHWEKYIN YENWE (25 MW) NYAUNGCHE DAUUK 1 MYANAUNG 2013-2014 Project Plan KAMARNAT HINTHADA 1 Ywama-Hlaingtharyae 230kV Line (7)miles & Substations MYAUNG TAGAR 2014-2015 Project Plan EAST DAGON HLAWGA YEGYI SEINPANMYAING 1 Shwelinpan (In/Out )Line (6) miles & Substations. 2 230/66kV, 100MVA Ywama Substation 3 ဘဘဘဘ Myaungdagar-Hlaingtaryar 230kV Transmission ဘဘဘဘဘဘဘဘLine (28) miles 4 Thaketa- Ahlone 230kV Line (11) miles & Substation YWAMA SHWELINPAN ATHOKE ဘဘဘဘဘ THAKETA KYAIKASAN THILAWA 2015-2016 Project Plan ဘဘဘဘဘဘဘဘဘဘ BAYINTNAUNG THANLYIN HLAINGTHARYAR 1 THIDA 2 KANGYIDAUNT Hlawga-Ywrma 230kV line(10)miles & Substations ဘဘဘဘဘ AHLON 3 KamarNut-EastDagon 230kV Line,(40)miles & Substations ဘဘဘဘဘဘဘ ဘဘဘဘ ThanLynn-Thilawa 230kV Line (15)miles & Substations 4 Hlawga-Thakata 230kV Line (5)miles & Substations ဘဘဘဘဘဘဘဘဘ 5 Ahlone-Dala ဘဘဘဘဘဘဘဘဘဘဘ 230kV Line (8)miles & Substations 6 Thida GIS 230/66/11kV, 2x200 MVA Substations MYAUNGMYA 43 44 TANINTHARYI DIVISION Sr Project Name 2013-2014 Project Plan THATON 1 PHAAN INDUSTRIAL ZONE ဘဘဘ MYAINGGALAY PHAYARGONE MYAWADDY KAWKAREIK MAWLAMYINE CHAUNGSONE YE DAWEI Mawlamyine-Ye-Dawei 230 kV Tranmsission Line (132) miles & Substations. 45 Current Status of Implementation of Projects (Transmission Lines & Substations), On-going and will be Completed During Financial Years of (2012-2013) To (2015-2016) Estimated Project Cost Sr. Project Name Material Cost Mil: Kyats(Mil:USD) Construction Cost Mil: Kyats(Mil:USD) Remarks Kachin State 1. Waingmaw-Myitkyina(1)(2)(3) 66 kV Transmisson Line (30) mile 4,261(4.734) 664.5(.738) Completed 2. Myitkyina-Mogaung66 kV Transmisson Line (42) mile 1,754(1.949) 930.5(1.034) Completed 3. Myitkyina(1),Myitkyina(2) & Myitkyina(3) 66 kV Substation 16,160(17.956) 1,314(1.460) Completed 4. Bhamo-Nabar, Ngapawdine-Ohntaw 230 kV Transmisson Lines (285) mile & Substations 89,786(99.762) 42,602(47.336) 2013-2014 Financial year 5. Bhamo-Myotit-Dawponyan 66 kV Transmisson Line (34) mile & Substations 2,800(3.111) 2,657(2.952) 2013-2014 Financial year 6. Waingmaw-Mogaung 132 kV Transmisson Line (60) mile & Substations 11,880(13.200) 2,642(2.936) 2014-2015 Financial year 7. Mogaung- Hpakant 66 kV Transmisson Line (55) mile & Substations 4,225(4.694) 2,350(2.611) 2014-2015 Financial year 130,866(145.407) 53,160(59.067) Sub Total Exchange Rate : 1 USD = 900 Ks. 46 Status of Implementation of Projects (Transmission Lines & Substations), On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016) Estimated Project Cost Sr. Project Name Material Cost Mil: Kyats(Mil:USD) Construction Cost Mil: Kyats(Mil:USD) Note Kayar State (Contd;) 1. Baluchaung(2)-Shwemyo 230 kV Transmisson Line (120) mile & Substations 2. Baluchaung(2)-Baluchaung(3) 132 kV Transmisson Line (4) mile & Substation Extension 3. Baluchaung(2)-Loikaw 132 kV Transmisson Line (12) mile & Substations 4. 2012-2013 Financial year 19,500(21.667) 7,699(8.554) 2012-2013 Financial year 14,709(16.343) 3,222(3.580) 2014-2015 Financial year Loikaw-Shadaw 66 kV Transmisson Line (45) mile & Substations 2,375(2.639) 1,979(2.199) 2014-2015 Financial year 5. Loikaw-Bawlakhe 66 kV Transmisson Line (60) mile & Substations 4,200(4.667) 2,491(2.768) 2014-2015 Financial year 6. Bawlakhe-Hpasawng 66 kV Transmisson Line (40) mile & Substations 5,400(6.000) 1,807(2.008) 2014-2015 Financial year 46,184(51.316) 17,198(19.109) Total for Kachin State 47 Status of Implementation of Projects (Transmission Lines & Substations), On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016) Estimated Project Cost Sr. Project Name Material Cost Note Mil: Kyats(Mil:USD) Construction Cost Mil: Kyats(Mil:USD) - 1,020(1.133) On-Going Kayin State 1. Hpa-an-Industrial Zone 66 kV Transmisson Line (17) mile & Substations 2. Hpa-an-Phayarkone(Zartabyin) 66 /11kV, 5 MVA Substation 2,250(2.500) 879(0.977) 2013-2014 Financial year 3. Mawlamyine-Kawkareit-Myawadi 230 kV Transmission Line (80) mile & Substations 27,900(31.000) 8,675(9.639) 2014-2015 Financial year 4. Hpa-an-Hlinebwe 66 kV Transmisson Line (27) mile & Substations 2,860(3.178) 1,392(1.547) 2014-2015 Financial year 33,010(36.678) 11,966(13.296) Total for Kayar State Status of Implementation of Projects (Transmission Lines & Substations), 48 On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016) Estimated Project Cost Sr. Project Name Material Cost Construction Cost Mil: Kyats(Mil:USD) Mil: Kyats(Mil:USD) Note Chin State 1. Kyaw-Gangaw-Harkhar 66 kV Transmisson Line (89) mile & Substations 11,531(12.812) 2,010(2.233) On-Going 2. Harkhar-Phalam-Taingin 66 kV Transmisson Line (50) mile & Substations 5,600(6.222) 3,820(4.244) 2013-2014 Financial year 3. Pauk-Minthet 66 kV Transmisson Line (35) mile & Substations 2,880(3.200) 2,295(2.550) 2013-2014 Financial year 22,011(22.234) 8,125(9.028) 11,106(12.340) 6,990(7.767) On-Going Total for Chin State Mon State 1. Thaton-Mawlamyine 230 kV Transmisson Line (50) mile & Substations 2. Mawlamyine-Chaungzon 66 kV Transmisson Line (18) mile & Substations 3,618(4.020) 5,084(5.649) 2013-2014 Financial year 3. Mawlamyine-Thanbuzayat 66 kV Transmisson Line (35) mile & Substations 3,600(4.000) 1,665(1.850) 2013-2014 Financial year 4. 66/11 kV, 20 MVA & 66/33 kV, 20 MVA Mawlamyine Substation 4,050(4.500) 438(0.487) 2014-2015 Financial year 5. Thaton-Bilin 66 kV Transmission Line (38) mile & Substations 3,368(3.742) 1,768(1.964) 2015-2016 Financial year 25,742(28.602) 15,945(17.717) Total for Mon State Status of Implementation of Projects (Transmission Lines & Substations), 49 On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016) Estimated Project Cost Sr. Project Name Material Cost Construction Cost Mil:Kyats(Mil:USD) Mil: Kyats(Mil:USD) Note Rakhine State 1. Mann-Ann-Ponnagyun 230 kV Transmission Line (200) mile & Substations 2. Oakshitbyin-Toungup-Ma-ei 230 kV Transmission Line (139) mile & Substations 3. On-Going 68,741(76.379) 21,699(24.110) Ma-ei-Kyaukphyu 230 kV Transmisson Line (65) mile 14,040(15.600) 2,224(2.471) 2013-2014 Financial year 4. Kyaukphyu 230 kV Substation-Kyaukphyu 66 kV Transmission Line (5) mile & Substations 2,025(2.250) 569(0.632) 2013-2014 Financial year 5. Mrauk-u-Ponnagyun-Sittwe 66 kV Transmission Line (57) mile & Substations 6,660(7.400) 2,856(3.173) 2013-2014 Financial year 6. Ponnagyun-Kyauktaw 66 kV Transmission Line (40) mile & Substations 2,520(2.800) 1,807(2.008) 2013-2014 Financial year 7. Kyaukphyu-Ramree 66 kV Transmission Line (41) mile & Substations 3,645(4.050) 1,870(2.078) 2013-2014 Financial year Sub Total On-Going 50 Status of Implementation of Projects (Transmission Lines & Substations), On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016) Estimated Project Cost Sr. Project Name Material Cost Mil: Kyats(Mil:USD) Construction Cost Mil: Kyats(Mil:USD) Note Yakhine State (cont;) 8. Toungup-Thandwe 66 kV Transmission Line (30) mile & Substations 4,000(4.444) 1,465(1.628) 2013-2014 Financial year 9. Kyauktaw-Buthitaung 66 kV Transmission Line (35) mile & Substations 3,183(3.537) 1,665(1.850) 2014-2015 Financial year Mrauk-u-Minbya 66 kV Transmission Line (20) mile & Substations 2,250(2.500) 1,152(1.280) 2014-2015 Financial year 11. Thandwe-Kyeintali 66 kV Transmission Line (84) mile & Substations 6,480(7.200) 3,342(3.713) 2014-2015 Financial year 12. Athoke- Gwa 66 kV Transmission Line (62) mile & Substations 4,320(4.800) 2,589(2.877) 2014-2015 Financial year 117,864(130.960) 41,238 ( 45.820) 10 Total for Yakhine State 51 Status of Implementation of Projects (Transmission Lines & Substations), On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016) Estimated Project Cost Sr. Project Name Material Cost Construction Cost Mil:Kyats(Mil:USD) Mil:Kyats(Mil:USD) Note Shan State 1. Kalaw-Pindaya 66 kV Transmission Line (22) mile & Substations 1,889(2.099) 800(0.889) Completion 2. Aungthapyay-Naungkar 66 kV Transmission Line (17) mile & Substations 1,389(1.543) 1,050(1.167) Completion 3. Khainglon-Konhein 66 kV Transmission Line (33) mile & Substations 3,272(3.636) 2,499(2.777) On-Going 4. Lashio-Mineyal- Tantyan 66 kV Transmission Line (87) mile & Substations 3,931(4.368) 3,882(4.313) On-Going 5. Teinni-Tarmoenye-Launktai 66 kV Transmission Line (75) mile & Substations 7,171(7.968) 3,471(3.857) On-Going 6. Taunggyi 132/66 kV, 100 MVA Substation 5,400(6.000) 450(0.500) 2013-2014 Financial year 7. Lecha 66/11 kV, 5 MVA Substation 2,000(2.222) 438(0.487) 2013-2014 Financial year 8. Minenaung- Mineshoe 66 kV Transmission Line (33) mile & Substations 3,200(3.556) 2,297(2.552) 2013-2014 Financial year Sub Total 52 Status of Implementation of Projects (Transmission Lines & Substations), On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016) Estimated Project Cost Sr. Project Name Material Cost Construction Cost Mil: Kyats(Mil:USD) Mil: Kyats(Mil:USD) Note Shan State ( Contd) 9. Upper Baluchaung- Kalaw 66 kV Transmission Line (20) mile & Substations - 684(0.760) 2013-2014 Financial year 10. Mansan-Teinni 230 kV Transmission Line (60) mile & Substations 24,390(27.100) 6,163(6.848) 2014-2015 Financial year 11. Teinni- Kutkhaing-105 mile (Musal) 66 kV Transmission Line (60) mile & Substations 5,940(6.600) 2,550(2.833) 2014-2015 Financial year 12. Taunggyi- Sesai 66 kV Transmission Line (44) mile & Substations 3,150(3.500) 1,535(1.706) 2014-2015 Financial year 13. Minenaung- Gyithe 66 kV Transmission Line (30) mile & Substations 3,150(3.500) 1,494(1.660) 2014-2015 Financial year 14. Mansan- Lashio 66 kV Transmission Line (26) mile & Substations 3,622(4.024) 2,207(2.452) 2014-2015 Financial year 68,504(76.116) 29,520(32.800) Total for Shan State 53 Status of Implementation of Projects (Transmission Lines & Substations), On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016) Estimated Project Cost Sr. Project Name Note Material Cost Mil: Kyats(Mil:USD) Construction Cost Mil: Kyats (Mil:USD) - 2,270(2.522) 2013-2014 Financial year 28,512(31.680) 7,249(8.054) 2013-2014 Financial year Sagaing Region 1. Nyaungbingyi- Latpandaung 230 kV Transmission Line (3.5) mile & Substations 2. Gangaw- Kalay 230 kV Transmission Line (80) mile & Substations 3. Kyaukpahtoe 132/66 kV, 100MVA Substation Extension 6,300(7.000) 450(0.500) 2013-2014 Financial year 4. Monywa 132/33 kV, 2x50 MVA Substation Extension 8,380(9.311) 1,890(2.100) 2014-2015 Financial year 5. Taingin- Kalay-Kalaywa 66 kV Transmission Line (30) mile & Substations 4,5005.000) 1,902(2.113) 2014-2015 Financial year 47,692(52.991) 13,761(15.290) Mawlamyine- Ye-Dawei 230 kV Transmission Line (132) mile & Substations 50,373(55.970) 22,023(24.470) Total for Tanintharyi Region 50,373(55.970) 22,023(24.470) Total for Sagaing Region Tanintharyi Region 1. 2013-2014 Financial year 54 Status of Implementation of Projects (Transmission Lines & Substations), On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016) Estimated Project Cost Sr. Project Name Material Cost Mil: Kyats(Mil:USD) Construction Cost Mil: Kyats(Mil:USD) Note Bago Region 1. Sittaung 230/33 kV, 100MVA Substation 3,413(3.792) 1,910(2.122) Completion 2. Kamarnat 230/33 kV, 100MVA Substation Extension 3,758(4.176) 250(0.278) On-Going 3. Minhla 230/33 kV, 100MVA Substation 3,753(4.170) 1,910(2.122) On-Going 4. Shwetaung- Myaungtagar 230 kV Transmission Line (130) mile & Substations 11,628(12.920) 10,273(11.414) On-Going 5. Thautyekhat(2)- Taungoo 230 kV Transmission Line (13) mile & Substations - 826(0.918) On-Going 6. Chaungkuu 230 /66 kV, 100 MVA Substation Extension 78,975(87.750) 17,316(19.240) 2013-2014 Financial year 7. Taungdwingyi- Shwetaung 230 kV Transmission Line (100) mile & Substations 18,100(20.111) 7,944(8.827) 2013-2014 Financial year 8. Kamarnat-Myauntagar 500 kV Transmission Line (50) mile 37,800(42.000) 7,400(8.222) 2014-2015 Financial year 9. Taungoo- Shwetaung 230 kV Transmission Line (100) mile 26,640(29.600) 8,720(9.689) 2014-2015 Financial year 55 Status of Implementation of Projects (Transmission Lines & Substations), On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016) Estimated Project Cost Sr. Project Name Material Cost Mil: Kyats(Mil:USD) Construction Cost Mil: Kyats(Mil:USD) Note Bago Region 10. Baluchaung(2)- Taungoo 230 kV Transmission Line (96) mile 16,992(18.880) 5,864(6.516) 2014-2015 Financial year 11. Kamarnat 500/230 kV, 500 MVA 23,400(26.000) 1,000(1.111) 2014-2015 Financial year 12. Taungoo 500/230 kV, 500 MVA 23,400(26.000) 1,000(1.111) 2014-2015 Financial year 13. Minhla- Hinthada 230 kV Transmission Line (60) mile & Substations 12,510(13.900) 4,838(5.376) 2015-2016 Financial year 260,369(289.299) 69,251(76.946) 56 Status of Implementation of Projects (Transmission Lines & Substations), On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016) Estimated Project Cost Sr. Project Name Note Material Cost Mil: Kyats(Mil:USD) Construction Cost Mil: Kyats(Mil:USD) 22,324(24.804) 13,028(14.476) 2013-2014 Financial year 3,600(4.000) 1,494(1.660) 2013-2014 Financial year Magway Region 1. Mann- Taungdwingyi 230 kV Transmission Line (85) mile & Substations 2. Oakshitpin- Kanma 66 kV Transmission Line (30) mile & Substations 3. Thapyaewa-Chauk-Minbu 230 kV Transmission Line (145) mile & Substations 33,852(37.613) 10,765(11.961) 2014-2015 Financial year 4. Kyunchaung-Mann 230 kV Transmission Line (90) mile & Substations 21,780(24.200) 7,367(8.186) 2014-2015 Financial year Chaungkuu 230 /66 kV, 100 MVA Substation Extension 11,072(12.302) 400(0.444) 5. 2014-2015 Financial year 6. Taungdwingyi- Aunglan 132 kV Transmission Line (66) mile & Substations 13,487(14.986) 2,792(3.102) 2014-2015 Financial year 7. Taungdwingyi 132/66 kV, 100 MVA Substation Extension 4,161(4.623) 350(0.389) 2014-2015 Financial year 57 Status of Implementation of Projects (Transmission Lines & Substations), On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016) Estimated Project Cost Sr. Project Name Material Cost Mil: Kyats(Mil:USD) Construction Cost Mil: Kyats(Mil:USD) Note Magway Region 8. Gangaw-Chaungkuu 230 kV Transmission Line (60) mile, Myittar- Gangaw 66 kV Transmission Line (25) mile & Substations 22,500(25.000) 6,418(7.131) 2014-2015 Financial year 9. Aunglan- Thayet 66 kV Transmission Line (10) mile & Substations 2,307(2.563) 492(0.547) 2014-2015 Financial year 10. 11. Tanyaung- Saw 66 kV Transmission Line (45) mile & Substations 8,640(9.600) 2,008(2.231) Pakokku(Buddha Kone) 132/66 kV, 60 MVA Substation Extension 5,535(6.150) 1,492(1.658) 149,258(165.842) 46,606(51.784) 2014-2015 Financial year 2015-2016 Financial year 58 Status of Implementation of Projects (Transmission Lines & Substations), On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016) Estimated Project Cost Sr. Project Name Material Cost Mil: Kyats(Mil:USD) Construction Cost Mil: Kyats(Mil:USD) Note 4,446(4.940) 1,910(2.122) On-Going 100,529(111.699) 21,608(24.009) 2012-2013 Financial year Mandalay Region 1. Naypyitaw 230 /33 kV, 100 MVA Substation 2. Meikhtila-Taungoo 500 kV Transmission Line (146) mile 3. Upper Yeywar-Shwesaryan 230 kV Transmission Line (80) mile & Substation Extension 15,498(17.220) 4,857(5.397) 2012-2013 Financial year 4. Myogyi-Taungtawkwin 33 kV Transmission Line (10) mile & Substation Extension 1,594(1.771) 612(0.680) 2012-2013 Financial year 5. Tagontaing 132/33 kV, 100 MVA Substation Extension 6,300(7.000) 250(0.278) 2013-2014 Financial year 6. 7. 8. 2013-2014 Financial year Latpanhla 132/66 kV, 60 MVA Substation Extension 8,978(9.976) 300(0.333) 23,400(26.000) 1,000(1.111) Moegote 66/33 kV, 30 MVA Substation Extension Thapyaewa(Meikhtila) 500/230 kV, 500 MVA Substation 2013-2014 Financial year 2014-2015 Financial year 59 Status of Implementation of Projects (Transmission Lines & Substations), On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016) Estimated Project Cost Sr. Project Name Material Cost Mil: Kyats(Mil:USD) Construction Cost Mil: Kyats(Mil:USD) Note 10,773(11.970) 438(0.487) 2014-2015 Financial year 6,300(7.000) 450(0.500) 2014-2015 Financial year Mandalay Region 9. 10. Industrial Zone 132/33 kV, 100 MVA Substation Tharzi 132/33 kV, 2x50 MVA Substation Extension 11. Aungpinlal 132/33 kV, 2x50 MVA Substation Extension 4,500(5.000) 258(0.287) 2014-2015 Financial year 12. Chauk- Nyaung Oo 66 kV Transmission Line (28) mile & Substations 2,722(3.024) 1,396(1.551) 2014-2015 Financial year 13. Myingyan- Ngazon 66 kV Transmission Line (10) mile & Substations 2,250(2.500) 780(0.867) 2014-2015 Financial year 14. Bellin 230/33 kV, 100 MVA Substation Extension 7,380(8.200) 350(0.389) 2015-2016 Financial year 15. Thapyaewa(Meikhtila) 230/33kV, 100 MVA Substation Extension 7,380(8.200) 350(0.389) 2015-2016 Financial year 202,050(224.500) 34,559(38.399) Total Mandalay Region 60 Status of Implementation of Projects (Transmission Lines & Substations), On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016) Estimated Project Cost Project Name Material Cost Mil: Kyats(Mil:USD) Construction Cost Mil: Kyats(Mil:USD) Note 1. Athoke-Pathein 230 kV Transmission Line (40) mile & Substations 18,000(20.000) 4,360(4.844) 2012-2013 Financial year 2. Hlaingtharyar-Kyeiklat 230 kV Transmission Line (30) mile & Substations 13,547(15.052) 4,329(4.810) 2013-2014 Financial year 3. Pathein-Chaungthar 66 kV Transmission Line (35) mile & Substations 2,925(3.250) 1,665(1.850) 2013-2014 Financial year 4. Pathein-Ngwesaung 66 kV Transmission Line (30) mile & Substations 2,700(3.00) 1,495(1.661) 2013-2014 Financial year 5. Pathein-Pathein(Kyotadar) 66 kV Transmission Line (7) mile & Substations 3,857(4.286) 708(0.787) 2013-2014 Financial year 6. Hinthada-Athoke 230 kV Transmission Line (80) mile & Substation Extension 20,160(22.400) 6,391(7.101) 2014-2015 Financial year 7. Oakshitpin-Hinthada 230 kV Transmission Line (95) mile & Substations 23,310(25.900) 9,375(10.417) 2014-2015 Financial year 8. Hlaintharyar-Kyeiklat 66 kV Transmission Line (30) mile & Substation Extension 3,600(4.000) 1814(2.016) 2014-2015 Financial year Sr. Ayeyarwaddy Region 61 Status of Implementation of Projects (Transmission Lines & Substations), On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016) Estimated Project Cost Sr. Project Name Material Cost Mil: Kyats(Mil:USD) Construction Cost Mil: Kyats(Mil:USD) Note Ayeyarwaddy Region (Contd;) 9. Kyeiklat –Phyarpone 66 kV Transmission Line (15) mile & Substations 2,307(2.563) 951(1.057) 2014-2015 Financial year 10. Kyeiklat –Bokalay 66 kV Transmission Line (35) mile & Substations 3,229(3.588) 1,635(1.817) 2014-2015 Financial year Hinthada 66/11 kV, 2x10 MVA Substation Extension 3,690(4.100) 4,38(0.487) 2014-2015 Financial year 12. Hinthada-Laymyatnar 66 kV Transmission Line (15) mile & Substation Extension 1,845(2.050) 951(1.057) 2014-2015 Financial year 13. Hinthada-Danuphyu 66 kV Transmission Line (35) mile & Substation Extension 2,768(3.076) 1,635(1.817) 2014-2015 Financial year 101,938(113.264) 35,747(39.719) 11. Total (Ayeyarwaddy Region ) 62 Status of Implementation of Projects (Transmission Lines & Substations), On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016) Estimated Project Cost ဘဘ ဘ Project Name Material Cost Mil: Kyats(Mil:USD) Construction Cost Mil: Kyats(Mil:USD) Note Yangon Region (Contd;) 1. Myaungtagar 230/33 kV, 100 MVA Substation Extension 3,301(3.668) 250(0.278) On-Going 2. Hlawgar 230/33 kV, 2x100 MVA Substation Extension 7,050(7.833) 350(0.389) On-Going 3. Hlaintharyar 230/33 kV, 100 MVA Substation Extension 3,557(3.952) 250(0.278) On-Going 4. Thaketa-East Dagon 230 kV Transmission Line (10) mile & Substations 17,370(19.300) 2,778(3.087) 2012-2013 Financial year 5. Ywarma-Hlaimgtharyar 230 kV Double Circuit Transmission Line (7) mile & Substations 4,212(4.680) 5,719(6.354) 2013-2014 Financial year 7,200(8.000) 450(0.500) 2014-2015 Financial year 6. Ywarma230/66 kV, 100 MVA Substation Extension 7. Shwelinpanm In/Out 230 kV Transmission Line (6) mile & Substations 9,612(10.680) 2,376(2.640) 2014-2015 Financial year 8. Myaungtagar-Hlaingtharyar 230 kV Transmission Line (28) mile & Substations 9,696(10.773) 1,774(1.971) 2014-2015 Financial year Sub Total 63 Status of Implementation of Projects (Transmission Lines & Substations), On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016) Estimated Project Cost ဘဘ ဘ Project Name Material Cost Mil: Kyats(Mil:USD) Construction Cost Mil: Kyats(Mil:USD) Note 9. Thaketa-Ahlone 230 kV Transmission Line (11) mile & Substations 2,700(3.000) 752(0.836) 2014-2015 Financial year 10. North Oakkala-(Hlawgar-Thaketa) 230 kV Double Circuit Transmission Line (5) mile & Substations 14,580(16.200) 2,789(3.099) 2015-2016 Financial year 11. Hlawgar-Ywarma 230 kV Double Circuit Transmission Line (10) mile & Substations 4,860(5.400) 956(1.062) 2015-2016 Financial year 25,200(28.000) 2,800(3.111) 2015-2016 Financial year Yangon Region (Contd;) 12. Thida GIS 230/66/11 kV, 2x200 MVA Substations 13. Kamarnat-East Dagon 230 kV Double Circuit Transmission Line (40) mile & Substations 11,340(12.600) 3,285(3.650) 2015-2016 Financial year 14. Thanlyin-Thilawa 230 kV Double Circuit Transmission Line (15) mile & Substations 9,990(11.100) 5,255(5.839) 2015-2016 Financial year 15. Ahlone-Dala 230 kV Transmission Line (8) mile & Substations 8,100(9.000) 2,481(2.757) 2015-2016 Financial year 138,768(154.187) 32,265(35.850) 1,392,629(1,547.366) 431,364(479.293) Total for Yangon Region FOR ALL STATE & REGION TOTAL 1,823,993 ( 2,026.659) 64 500 KV Power Transmission Plan In Myanmar 500kV ShweLi(3)- ThaPyaWa Double Circuit Line (250)miles (Proposal Stage) 500kV ThaPyaWa – Taungoo Double Circuit Line (153.3)miles (Contracted Stage) 500kV MongTon-Taungoo Double Circuit Line (230)miles (Proposal Stage) 500kV Taungoo-KamarNat Double Circuit Line (117 )miles (Proposal Stage) 500kV KamarNat-MyaungTagar Double Circuit Line (50)miles (Proposal Stage) ShweLi(3) 1050MW ThaPyaWa MongTon 7000MW Taungoo KarmarNut MyaungTagar 65 List of Project To be Implemented by Myanma Electric Power Enterprise, Ministry of Electric Power Under (5) Years Plan (2012-2013) To (2015-2016) Transmission Lines Substations No of Line Line Length (km) Voltage (kV) No of Substation Installed Capacity (MVA) 500 3 521 500 3 1500 230 37 4280 230 38 4486 132 4 237 132 17 1370 66 51 3047 66 66 857.5 33 1 17 33 - - Total 96 8102 Total 124 8213.5 Voltage (kV) 66 The Existing High Voltage Transmission Lines with OPGW Cable Sr. Name of Lines Length of Lines(km) 1 Myaukpyin- Shwesaryan 26 2 Yaeywar-Thapaywa 112 3 Yaeywar-Belin 39 4 Belin-Thapaywa 88 5 Hlaingthayar - Ahlone 23 Total 288 High Voltage Transmission Lines which were planned to replaced the existing Galvanized Steel Earth Wire with OPGW (Upper Ring) Sr. Name of Lines Length of Lines (km) 1 Thapaywa - Thazi 27 2 Thazi - Shwemyo 121 3 Shwemyo - Pyinmana 40 4 Pyinmana - Naypyitaw 26 5 Belin - Shwesaryan 32 6 Taungdwingyi - Magwe 76 7 Magwe - Chauk 8 Chauk - Kyunchaung 9 Kyunchaung - Naungpingyi 117 45 163 10 Naungpingyi - Ohmtaw 92 11 Naungpingyi - Chaungu 108 12 Ohntaw - Belin Toatal 64 911 67 High Voltage Transmission Lines which were planned to replaced the existing Galvanized Steel Earth Wire with OPGW (Lower Ring) Sr. Name of Lines Length of Lines (km) 1 NCC - Naypyitaw(1) 41 2 Naypyitaw(1) - Taungdwingyi 75 3 Taungdwingyi - Shwetaung 4 Myaungtagar - Hlaingtharyar 36 5 Myaungtagar - Hlawga 31 6 Tharyargone - Hlawga 151 143 7 Pyinmana - Thephyu 36 8 Thephyu - Taungoo 65 9 Taungoo - Tharyargone 97 10 Tharyargone - Khamarnet 93 11 Khamarnet - Thanlyin 98 12 Thanlyin - Tharketa 12 Toatal 878 68 69 OPGW NETWORK OF MYANMAR POWER SYSTEM THANK YOU FOR YOUR KIND ATTENTION Q&A U Aung Kyaw Oo Deputy Chief Engineer Power Transmission Project Department (PTP) Myanmar Electric Power Enterprise (MEPE) Ministry of Electric Power(MOEP) 70