Transcript Document

CURRENT SITUATION AND
UPGRADING PLAN FOR MYANMAR POWER SYSTEM
MR MAUNG MAUNG ( Chief
Engineer)
Myanma Electric Power Enterprise
Ministry of Electric Power
2
Contents
 Geography of Myanmar
 Existing Power Industry of Myanmar
 Upgrading options for the Grid
(Short Term Reinforcement Plan of
Transmission Lines & Substations)
 Conclusion
3
4
Brief Introduction to The Republic of Union of Myanmar
Area of Country
261, 229.73 sq-mile(677,000 km2)
Population
around 59.78 million(as of 2011)
Kachin
Sagaing
The country consists of
States
Regions
(1) Kachin
(1) Sagaing
Shan
Chin
Mandalay
Rakhaing
Magway
Kayar
(2) Kayah
(2) Tanintharyi
Bago
(3) Kayin
(3) Bago
Yangon
(4) Chin
(4) Magway
(5) Mon
(5) Mandalay
(6) Rakhaing
(6) Yangon
(7) Shan
(7) Ayeyarwaddy
Ayeyarwaddy
Kayin
Mon
Tanintharyi
5
GEOGRAPHY OF MYANMAR
(Location)
China – 2185km
India- 1462 km
Bangladesh-72km
Coast-2308km
Total Perimeter
with International
Borders 5756 km
Lao – 238km
Thailand- 1799km
Geography of Myanmar
Kachin
Mountains
Yakhine
Mauntains
Ayeyarwaddy
Delta
6
(Topography)
Shan
Plateaus
7
Geography of Myanmar
(Major Rivers)
Chindwin
1,151 km
Ayeyarwaddy
2,063 km
India
China
Bangla
desh
Thanlwin
1,660 km
Bay of
Benga
l
Thail
and
Sittaung
310 km
8
Population Distribution of Myanmar
POPULATION ESTIMATES OF MYANMAR
(AS OF OCTOBER 1 - 2010)
Population
(Million)
S.N.
Year
Annual
Growth Rate
Total
Male
Female
(Percentage)
1
1990 - 1991
40.78
20.21
20.57
1.88
2
1995 - 1996
44.74
22.22
22.52
1.87
3
2000 - 2001
50.13
24.91
25.22
2.02
4
2003 - 2004
53.22
26.47
26.75
2.02
5
2004 - 2005
54.30
27.00
27.30
2.02
6
2005 - 2006
55.40
27.54
27.86
2.02
7
2006 - 2007
56.52
28.10
28.42
2.02
8
2007 - 2008
57.50
28.58
28.92
1.75
9
2008 - 2009
58.38
29.03
29.35
1.52
10
2009 - 2010
59.13
29.40
29.73
1.29
Main facts abstract from Geography of Myanmar
Mandalay
1} According to the land form and climate of Myanmar, there
are rich hydro power resources in Northern and Eastern
Regions of Myanmar. There are more than 15 Hydro Power
Resources which were the capacity >1000MW in that
regions.
2) Myanmar have the border with the China, India and
Thailand. Therefore the power trade to these country can be
achieved.
Naypyitaw
Yangon
3) Yangon is the most populated region and it has about 7
millions peoples. Yangon has the main sea port and Industry
Zones. Therefore, Yangon is the biggest load center of
Myanmar. Mandalay, Naypyitaw and Ayeyarwaddy regions are
also have the high population density and the power demand
is increasing rapidly.
9
10
11
12
Background History
•
•
•
•
•
The voltage levels of the Myanmar electrical power system are
– 230 kV
– 132 kV
– 66 kV
– 33 kV
– 11 kV.
The national grid has no direct connections to other grids of neighboring
countries.
The network comprises
42 overhead lines at 230 kV with a total length of 3015 km
35 overhead lines at 132 kV with a total length of 2058 km
16 overhead lines at 66 kV with a total length of 587 km
11 overhead lines at 33 kV having a total length of 27 km.
The 230 kV and 132 kV overhead lines are interconnecting approximately
50 substations.
The above details are valid for the transmission system only and do not
include the distribution network.
Power Stations in Myanmar (as of Dec’ 2012)
13
Existing Power Station (Hydro, Gas-fired and Coal-fired Thermal)
Hydropower
Output (MW)
Gas-fired
Output (MW)
1
Baluchaung -1
28
1
Kyungchaung
54.3
2
Baluchaung -2
168
2
Mann
36.9
3
Yeywa
790
3
Shwedaung
55.35
4
Kinda
56
4
Mawlamyaing
5
Sedawgyi
25
5
Myanaung
34.7
6
Zawgyi -1
18
6
Hlawga
154.2
7
Zawgyi -2
12
7
Ywama
70.3
8
Thapanzeik
30
8
Ahlone
154.2
9
Mone
75
9
Thaketa
92
10
Paunglaung
280
10
Thaton
50.95
11
Kabaung
30
Subtotal
714.9
12
Yenwe
25
13
Zaungtu
20
14
Shweli -1
600(300)
15
Keng taung
54
16
Shwegyin
75
17
Kun
60
18
Kyeeon Kyeewa
74
19
Dapein-1
240(60)
Subtotal
2660(2180)
Coal-fired
1
Tigyit
12
Output (MW)
120
Existing Power System Total = 3,490.9(2950.9)MW
Note: Output in parentheses is power supply to Myanmar from JV Projects.
Location of Existing Power Stations (as of Dec’ 2012)
India
China
16
Bangladesh
14
Myanmar
8
3
Mandalay
15
6
2 5
A
13
9
19 BNay Pyi Taw4 1
10
C
Bay of
Bengal
Ayeyawaddy
River
E
12
18
17
11
J
7
F
G
HI
D
Yangon
Sittaung
River
Existing Power Station
1
Baluchaung -2
2
Kinda
3
Sedawgyi
4
Baluchaung – 1
5
Zawgyi -1
6
Zawgyi -2
7
Zaungtu
8
Thapanzeik
9
Mone
Hydro
10
Paunglaung
11
Yenwe
12
Kabaung
13
Kengtawng
14
Shweli -1
15
Yeywa
16
Dapein-1
17
Shwegyin
18
Kun
19
Kyeeon Kyeewa
A
Kyungchaung
B
Mann
C
Shwedaung
D
Mawlamyaing
E
Myanaung
Gas-fired
F
Hlawga
G
Ywama
H
Ahlone
I
Thaketa
J
Thaton
Coal-fired α
Tigyit
ラオス
α
Thanlwing
River
Thailand
14
Output (MW)
168
56
25
28
18
12
20
30
75
280
25
30
54
600 (300)
790
240 (60)
75
60
74
54.3
36.9
55.35
12
34.7
154.2
70.3
154.2
92
50.95
120
ベトナム
COD
1960/1974
1985
1989
1992
1995
1998
2000
2002
2004
2005
2007
2008
2009
2009
2010
2011
2011
2012
2012
1974
1980
1984
1980
1975/1984
1996/1999
1980/2004
1995/1999
1990/1997
1985/2001
2004
シャム湾
Note: Output in parentheses is power supply to Myanmar from JV Projects.
15
Power Supply Status of Myanmar in 2012(Dry and
Rainy Season)
Dry season: May 18, 2012 1,298 MW (10:00)
Rainy season: October 18, 2012 1796 MW (20:00)
(Maximum power supply as of December 31, 2012)
16
Power Plants Under Construction and Planning
(up to 2016)
Hydropower
1
2
Upper Paunglaung
Nancho
Output (MW)
COD
140
2014
40
Gas-fired
1
2014
Output (MW)
COD
52
2013
Hlawga
(Gas Engine)
Hlawga (3 Units)
3
Phyu
40
2014
9
Chipwenge
99
2012
10
Baluchaung-3
52
2013
11
Thaukyegat
120
2013
12
Upper Baluchaung
29
2015
Subtotal
520
Total Install Capacity = 2060.6 MW
543
2
Thaketa
(Gas Engines)
123
2014
246
2015
174
2016
2013
53.6
Thaketa (3Units)
500
166
2014
166
2015
168
2016
3
Ahlone
100
2014
4
Ywa Ma
292
2013
Subtotal
1540.6
Location of Power Stations under Construction and Planning (as of December’ 2012)
l
India
China
Power Station
under construction and planning
a
Upper Paunglaung
16
Bangladesh
14
h
Myanmar
p
8
15
6
2 5
A
k
g
3
Mandalay
o
α
9
Nay Pyi Taw4
i 19 B
d a
1
10b
m
e
Bay of
Bengal
Ayeyawaddy
River
C
E
12
Thanlwing
River
j
18
17
11
J
7
F
G
HI
D
COD
140
2014
Nancho
40
2014
c
Phyu
40
2014
d
Middle Paunglaung
100
2018
e
Tha-htay
111
2018
f
Upper Keng Tawng
51
2018
g
Upper Yeywa
280
2019
h
Shweli -3
ベトナム
Ann
ベトナム
Bawgata
1050
2020
10
-
168
-
k
Upper Bu
150
-
l
Chipwinge
m
Baluchaung-3
n
Thaukyegat
120
2013
o
Upper Baluchaung
29
2015
p
Manipur
380
-
シャム湾
99
2012
シャム湾
52
2013
Thailand
Sittaung
River
Ⅰ Ⅱ Ⅲ IV
Hydropower (existing)(Yangon Region)
52
123
246
174
52
166
166
168
2013
2014
2015
2016
2013
2014
2015
2016
Ⅰ
Hlawga
543
Ⅱ
Taketa
500
Ⅲ
Ahlone
100
2013
IV
Ywama
292
2013
Yangon
Power Station
GasFired
Gas-fired (existing)
Coal-fired (existing)
Output (MW)
b
ラオスi
ラオスj
f 13
n
c
Hydropower
17
18
19
Monthly Generation in GWh (2009 to 2012)
Month
Janurary
Februrary
March
Apri
May
Jun
July
August
Setember
October
November
December
Total
2009
509
471
528
508
516
522
607
672
651
672
601
573
6830
2010
520
485
568
562
538
568
723
767
767
774
773
765
7810
2011
771
722
819
795
824
829
888
892
860
892
869
873
10034
2012
856
840
910
824
792
843
945
950
950
981
974
939
10804
Jun
July
August
2009
2010
2011
2012
December
November
October
573
601
672
651
773
765
910
974
873
939
869
981
950
892
860
892
950
888
945
829
843
774
767
767
723
795
824
819
840
824
792
722
672
607
568
522
538
516
562
508
700
Setember
May
568
528
485
856
1000
Apri
March
500
471
800
771
900
Februrary
520
509
600
Janurary
20
Monthly Generation in GWh (2009 to 2012)
400
300
200
100
0
Monthly Power Generation(by Power Producer) (2007 to 2012)
21
Monthly Power Generation (2007.01 - 2012.08)
1,000
800
MOEP1
HPGE
MEPE
Others
Total
700
600
500
400
300
200
100
Jul-12
Apr-12
Jan-12
Oct-11
Jul-11
Apr-11
Jan-11
Oct-10
Jul-10
Apr-10
Jan-10
Oct-09
Jul-09
Apr-09
Jan-09
Oct-08
Jul-08
Apr-08
Jan-08
Oct-07
Jul-07
Apr-07
0
Jan-07
Power Generation (GWh/month)
900
Month
Yenwe (25MW)
COD: Feb. 2007
Kabaung (30MW)
COD: Mar. 2008
Shweli -1(600MW)
COD: May. 2009
Kengtawng (54MW)
COD: Mar. 2009
Yeywa (790MW)
COD: Dec. 2010
Shwegyin (75 MW)
COD: Oct. 2011
Kun (60MW)
COD: Jul. 2012
Kyeeon Kyeewa (74 MW)
COD: Aug. 2012
Monthly Net System Energy Demand(by Supplier) (2007 to 2012)
22
Monthly Energy Consumption (2007.01 - 2012.08)
1,000
Total
YESB
ESE
800
700
600
500
400
300
200
100
Jul-12
Apr-12
Jan-12
Oct-11
Jul-11
Apr-11
Jan-11
Oct-10
Jul-10
Apr-10
Jan-10
Oct-09
Jul-09
Apr-09
Jan-09
Oct-08
Jul-08
Apr-08
Jan-08
Oct-07
Jul-07
Apr-07
0
Jan-07
Energy Consumption (GWh/month)
900
Month
Yenwe (25MW)
COD: Feb. 2007
Kabaung (30MW)
COD: Mar. 2008
Shweli -1(600MW)
COD: May. 2009
Kengtawng (54MW)
COD: Mar. 2009
Yeywa (790MW)
COD: Dec. 2010
Shwegyin (75 MW)
COD: Oct. 2011
Kun (60MW)
COD: Jul. 2012
Kyeeon Kyeewa (74 MW)
COD: Aug. 2012
Power Consumption (1990 to 2009)
23
Power Consumption(by Use)
一般、家庭用
Household
一般、家庭用
工業用
Industrial
工業用
Power Consumption(by Use)
(FY 2009)
商業用
Commercial
Others (lighting)
商業用その他(外灯等)
その他(外灯等)
6,000
000
4,000
3,000
一般、家庭
Household
用,
2,015GWh,
41%
1,000
000
1990
1995
2000
2003
000
2004
2005
2006
2007
2008
Industrial
工業用,
1,850GWh,
37%
2009
Fisical year
Power Consumption per Consumer
2,500,000
2,500,000
- 2,500,000
2,500,000
2003
2004
2005
2006
2007
4,000
Fisical year
1,500,000
1,500,000
1,500,000
1,500,000
3,000
1,000,000
1,000,000
1,000,000
1,000,000
2,000
500,000
500,000
500,000
500,000
1,000
2008
4,000
2009
4,000
4,000
3,000
3,000
3,000
2,000
2,000
2,000
1,000
1,000
1,000
0
0
0
0
1990- 1995 2000 2003 2004 2005 2006 2007 2008 2009
1990
1995
2000
2004
2005
2006
1990 1995
2000
20032003
2004 2005
2006
2007
2008 2007
2009 2008 2009
1990 1995 2000
2003 year
2004 2005 2006 2007 2008 2009
Fisical
year
FisicalFisical
year
Fisical year
Consumers
Consumption per consumers (KWh/consumer)
Consumers
Consumption
per consumers
(KWh/consumer)
Consumers
Consumption
per consumers
(KWh/consumer)
Consumers
Consumption per consumers (KWh/consumer)
--
-
5,000
5,000
5,000
5,000
Comsumed Energy per Consumer
(kwh/Consumer)
Number of Consumers (No.)
Number of Consumers (No.)
1990
1995 2000
2,000,000
2,000,000
2,000,000
2,000,000
Number of Consumers (No.)
その他(外灯
Others
(lighting),
等),
57GWh,
57
GWh,
1%
1%
2,000
(kwh/Consumer)
000
Commercial
商業用,
1,071GWh,
21%
5,000
Comsumed Energy per Consumer
(kwh/Consumer)
Comsumed Energy per Consumer
Comsumed
Energy per Consumer
(kwh/Consumer)
000
Power Generation (GMh)
000
Since 2006, the number of consumer
has increased, however, power
consumption per consumer has
decreased.
→ Restriction of power consumption
(ex. planned outage) is thought to be
one of the reasons of the reduction
above.
24
Energy Mix (MWh)
(by Power Producer)2009
Energy Mix (MWh)
(by Power Producer)2010
217,406
3%
1,578,856
23%
351,515
5%
1,802,754
23%
5,656,509
72%
5,033,601
74%
Hydro Station
(MWh)
Gas-Fired
Station (MWh)
Coal-Fired
Thermal
Station (MWh)
Energy Mix (MWh)
(by Power Producer)2011
Gas-Fired
Station (MWh)
266,223
3%
2,845,575
26%
7,177,899
71%
Hydro Station
(MWh)
Gas-Fired
Station (MWh)
Coal-Fired
Thermal
Station (MWh)
Coal-Fired
Thermal
Station (MWh)
Energy Mix (MWh)
(by Power Producer)2012
379,328
4%
2,476,327
25%
Hydro Station
(MWh)
7,722,780
71%
Hydro Station
(MWh)
Gas-Fired
Station (MWh)
Coal-Fired
Thermal
Station (MWh)
Current Installed Generation Capacity and Maximum Demand
3194MW
90
109
Power flow
240
76
265
125
35
63
(*)Summation of maximum load of each
230 and 132kV substation
63
Demand of Yangon
Region occupies 50% of
Myanmar’s demand.
1913MW
Total Demand (*)
504
508
Total Installed Generation Capacity
60
1151
Some large hydropower
plants in northern area
25
892
50
(Demand data in Kachin, Chin, Rakhaing, Kaya
Kayin and Tanintharyi is not obtained.)
Legend
471
Installed Capacity
Maximum Demand
⇒Generation gap between supply and
demand (approx 400MW) is supplied
through 230kV bulk TL
Unit[MW]
26
Electrification Ratio
No
Description
1
Population
2
Numbers of Household
3
Electrified Household
4
Percentage
Quantity
59.78 million
8.92 million
2.575 million
28.86 %
1 % increment in electrified household covers 89,200 households and is
expected to be consumed 18187 MWh/yr.
27
(MW)
20000
19215
18000
16978
16000
15008
14000
13274
12000
11746
10400
10000
9213
8167
8000
7243
6416
6000
5686
5024
4442
4000
2000
0
1806
2155 2426
2732
3078
3477
3929
(YEAR)
29
30
Transmission Lines Under Construction
Estimated target period of completion - 2013
No
From
To
kV
Length
(km)
Region/
State
Objective
To Supply Mon State
& strengthen
National Grid
To supply Yangon
Grid
1
ThaHton
Maw la Myaing
230
80.50
Mon
2
Thar ke ta
East – Dagon
230
16.09
Yangon
3
Balu chaung-2
Shwe myo
230
193.12
Kayar
4
Upper Yeywa
Shwe sar yan
230
128.75 Mandalay
5
Balu chaung-3
Balu chaung-2
132
5.79
Kayar
To connect Balu
chaung-3 HPP
6
Wah-Shaung
Winemaw
132
17.3
Kachin
To connect Chi-bwenge HPP
To strengthen
National Grid
To connect upper
Yeywa HPP
31
KACHIN STATE
Sr.
Project Name
2012-2013 Project Plan
1.
CHIBWENGE
(99 MW/2012)
Winemaw-Myintkyina 66kV Transmission Line (1)(2)(3)
MYITKYINA(1,2,3)
(30)mile
WASHAUNG
HPAKAN
WAINGMAW
(MYITKYINA)
2.
Mogaung- Myitkyina 66kV Transmission Line (42)miles
MOGAUNG
2013-2014 Project Plan
1.
66/11kV, 10MVA Myintkyina (1) (2)(3)Substation
2.
Bhamo-Nabar-Ngapyawdaing-Ohntaw 230kV
MOHNYIN
​TAPEIN
(240 MW)
NABAR
Transmission Line (285) miles & Substations
3.
Bhamo-Myothit-Dawponyan 66kV Transmission Line
DAWPONYAN
KYAUKPAHTO
(34)miles & Substations
THAPHANSEIK
(30 MW)
2014-2015 Project Plan
1.
MUSE
NAMKHAN
SHWEKU
TAGAUNG
Mogaung-Hpakan 66kV Transmission
Line (55)miles &
ဘဘဘဘဘ
Substations
​SHWELI
(600 MW)
BHAMO
ဘဘဘဘ
ဘဘဘဘဘ
KALEWA
MOGOK
NGAPYADAING
LETPANHLA
ဘဘဘဘ
ဘဘဘဘဘ
ဘ
​SEDAWGYI
(25 MW)
THEINNI
MANSAN
YADANARPON
NANSAN
LASHIO
MONYWA
GANGAW
MYITTHA
40 MW
KYAW
(Ka.Pa.Sa)
NYAUNGBINGYI
MYAUKPYIN
AUNGPINLE
HSIBAW
PYINOOLWIN
CHAUNGKU
PAKHANGE
INDUSTRIAL
ZONE
OHNTAW
SHWESARYAN
3
AUNGPANG
AUNGTHAPYE
THAPYAYWA
(MEIKHTILA)
KENGTAUNG
54 MW
PINPET
THAZI
KALAW
MOENAL
YEPAUNGSON
SHWEMYO
SONSAE
KAYAR STATE
TIKYIT
NAYPYITAW(2)
LINKHAE
MAGWAY
ဘဘ
Sr.
PINLAUNG
Project Name
2012-2013 Project Plan
NAYPYITAW
SHARTAW
TAUNGDWINGYI
1.
BALUCHAUNG(1)
(28 MW)
PYINMANA
LOIKAW
Baluchaung(2)-ShweMyo 230kV Line (120)miles &
Substation
THEPHYU
BALUCHAUNG(2)
(168 MW)
KYAUKSWEKYO
Baluchaung(3)- Baluchaung(2)132kV Transmission Line
(4) miles & Substations
2.
KALAMA
2014-2015 Project Plan
KHAPAUNG
(30 MW)
ဘ
ဘဘ
NAMSAN
YINMARBIN
ဘ
ဘဘ
ဘ
LOILEM
TAUNGOO
BALUCHAUNG(3)
( 52 MW/2013)
PHARSONG
1.
Loikaw-ShreTaw 66 kV Transmission Line (45)Miles &
Substations
PAUK KAUNG
PHYU
(40 MW/2013)0
KUN
​SHEWDAUNG
(3 x 18.45 MW) (60 MW)
2.
Substations
​SHWEKYIN
(75 MW)
YENWE(25 MW)
​ZAUNGTU
(20 MW)
MYANAUNG
(1X 16.25 MW)
(1X 18.45 MW)
Loikaw- Bawlakhe 66 kV Transmission Line (60)Miles &
3.
THARYARGONE
KAMARNAT
Bawlakhe - PharSong 66 kV Transmission Line (40)Miles
& Substations
4.
Baluchaung(2)- Loikaw 132kV Transmission Line (12)
miles & Substation
MYAUNG TAGAR
KAYIN STATE
Sr.
33
Project Name
2012-2013 Project Plan
THATON
(2 x 16.25 MW)
(1 x 18.45 MW)
HLANINGBWE
1.
PaAn-Industrial Zone 66 kV Transmission Line (17) miles & Substation
2013-2014 Project Plan
PAAN
INDUSTRIAL
ZONE
1.
PaAn-Phayangone(Zartapyin) 66/11kV, 5MVA Substation
2014-2015 Project Plan
ဘဘဘ
MYAWADDY
MYAINGGALAY
PHAYARGONE
1.
Mawlamyine-Kawkareik-Myawaddy 230kV Transmission Line (80)
miles & Substations
2.
KAWKAREIK
​MAWLAMYINE
(12 MW)
CHAUNGSONE
YE
DAWEI
PaAn - Hlaningbwe 66kV Transmission Line (27)miles & Substations
CHIN STATE
34
NABAR
ဘဘဘ
Sr.
Project Name
KYAUKPAHTO
ဘဘ
2012-2013 Project Plan
1.
THAPHANSEIK
(30 MW)
Kyaw-Gangaw-Haka 66kV Transmission Line (89) miles &
TAGAUNG
THINEGIN
Substation
KALEWA
ဘ
2013-2014 Project Plan
1.
SHWEKU
Hakha-Falam-Thinegin 66kV Transmission Line (50)
NGAPYADAING
KALE
FALAM
HAKHA
LETPANHLA
​SEDAWGYI
(25 MW)
miles& Substation
MONYWA
2.
Pauk-Mindat 66kV Transmission Line (35) miles &
AUNGPINLE
GANGAW
Substation
MYITTHA
40 MW
NYAUNGBINGYI
KYAW
MYAUKPYIN
INDUSTRIA
ZONE
PAKHANGE
CHAUNGKU
OHNTAW
BELIN
PAKKHOKKU
PAUK
MINDAT
MYINGYAN
KYUNGCHAUNG
(3 x 18.1 MW)
SAW
(KA.PA.SA)
Project(N)
MYINGYAN
(INDUSTRY)
Project(L)
KYAUKTAW
MRAUK-U
PONNAGYUN
MINBYA
ဘဘဘဘ
TANYAUNG
Project(P)
SAYTOTETAYAR
MONE
75 MW
KYEEON KYEEWA
70 MW
THAZI
CHAUK
YEPAUNGSON
MANN(MINBU)
2 X 18.45 MW
SHWEMYO
NAYPYITAW(2)
MAGWAY
SITTWE
ANN
YINMARBIN
THAPYAYWA
(MEIKHTILA)
NGAPHE
SONSAE
PINLAUNG
ဘဘဘ (၅၅ဘဘဘဘဘဘဘဘ)
MON STATE
Sr.
Project Name
2012-2013 Project Plan
​SHWEKYIN
ဘဘဘဘဘဘဘ
ဘ(75 MW)
1.
Thaton-Mawlamying 230kV Transmission Line (50) miles &
Substation
2013-2014 Project Plan
1.
66/11kV, 20MVA & 66/33kV, 20MVA Mawlamyine Substation
ဘဘ
2014-2015 Project Plan
THATON
(2 x 16.25 MW)
(1 x 18.45 MW)
HLANINGBWE
ဘ
PHAAN
1.
INDUSTRIAL
ZONE
Substations
2.
ဘဘဘဘ
MYAWADDY
MYAINGGALAY
Mawlamyine-Chaungsone 66kV Transmission Line (18) miles &
Mawlamyine- Thanbyuzayat 66kV Transmission Line (35) miles &
Substations
PHAYARGONE
KAWKAREIK
​MAWLAMYINE
(12 MW)
CHAUNGSONE
THANBYUZAYAT
YE
35
Project(N)
SAW
RAKHINE STATE
36
Project(L)
Project(P)
Sr.
Project Name
KYAUKTAW
TANYAUNG
SAYTOTETAYAR
BUTHIDAUNG
2012-2013 Project Plan
PONNAGYUN
1.
Ann-Ponnagyun 230 kV Transmission Line (120) miles & Substations
2.
Oakshitpin-Taungup-Maei-Ann 230 kV Line (139) miles & Substations
(ဘ
CHAUK
MYAUK-U MONE (75 MW)
KYEEON KYEEWA
70 MW
MINBYA
MANN
ဘဘဘ
MAGWAY
3.
Mann-Ann 230 kV Transmission Line (80) miles & Substations
SITTWE
2013-2014 Project Plan
1.
Maei-Kyaukphyu 230 kV Transmission Line (65) miles
2.
Kyaukphyu 230 kV Substation-Kyaukphyu 66 kV Line (5) miles &
KYAUKPHYU
TAUNGTWINGYI
SINPAUNGWE
MAEI
Project(C)
AUNGLAN
Ponnagyun-Sittwe 66 kV Line (22) miles & Substations
RAMREE
PYAE
ဘဘဘ
SANTE
4.
Ponnagyun-MyukOo 66 kV Line (35) miles & Substations
5.
Ponnagyun-Kyauktaw 66 kV Transmission Line (40) miles & Substations
6.
Kyaukphyu-Ramree 6 6 kV Transmission Line (41) miles & Substations
7.
TAUNGUP
OAKSHITPIN
THAHTAY
111 MW
THANTWE
MANTHONE
Taungup-Thandwe 66 kV Transmission Line (30) miles & Substations
2014-2015 Project Plan
1.
Kyauktaw-Buthidaung 66 kV Transmission Line (35) miles & Substations
2.
Maruk U-Minbya 66 kV Transmission Line (20) miles & Substations
3.
Thandwe-Kyeintali-Gwa 66 kV Line (84) miles & Substations
4.
Athoke-Gwa 66 kV Transmission Line (62) miles & Substations
ဘ
KYAWSYA
Substations
3.
ဘ
ဘဘ
ANN NGEPHAE
ဘဘ
(၅၅ဘ
KYANKIN
MYANAUNG
KYEINTALI
GWA
HINTHADA
ဘ
YEKYI
THABAUNG
ATHOKE
ဘဘ
TAPEIN
DAWPHONEYAN
NABAR
SHAN STATE
37
MUSE
SHWELI-1
Sr.
NANKHAN
SHWEKU
Project Name
BAMAW
2012-2013 Project Plan
105 MILE
TAGAUNG
TAUNG
LAUKKAING
1
Kalaw-Pindaya 66 kV Transmission Line (22) miles & Substations
2
Kholan-Konhein 66 kV Line (33) miles & Substations
3
Lashio-Mineyal-Tantyan 66 kV Line (87) miles & Substations
4
Theinni-Tarmonye-Laukkaing 66 kV Line (75) miles & Substations
5
Aungthapye-Naungka 66kV Line (17) miles & Substations
MOGOK
ဘ LATPANHLA
TARMONYE
THEINNI
SEDAWGYI
60 MW
KUTKAI
MANSAN
YADANARBON NANSAN
LASHIO
TANTYAN
AUNGPINLE
HSIBAW
MYAUKPYIN
PYINOOLWIN
ဘဘဘ
KYETHI
INDUSTRIAL
ZONE
MINEYAL
2013-2014 Project Plan
MONGHSU
SHWESARYAN
MONG-NAUNG
BELIN
YEYWA
ZAWGYI (2)
12 MW
WANSIN
ZAWGYI (1)
18 MW
MONGKUNG
1
132/66 kV, 100 MVA Taungyi Substation
2
66/11 kV, 5 MVA Laihka Substation
3
Mong Naung-Mongshu 66 kV Line (33) miles & Substations
4
Upper Baluchaung-Kalaw 66 kV Transmission Line (20) miles
KONHEIN
LAIHKA
PINDAYA
LOILEN
NANSAN
AUNGTHAPY
E
YINMARBIN
TAUNGYI
PINPAT
YEPAUNGSON KALA
W
SHWEMYO
TIKYIT
ဘဘ(၅)
MOENAL
HIS-HSENG
UPPER
LINKHAE
BALUCHAUNG
KHOLA
N
2014-2015 Project Plan
1
Mansan-Theinni 230 kV Line (60) miles & Substations
2
Theinni-Kutkai-105 mile(Muse) 66kV Transmission Line (60) miles &
KENGTAUNG
Substations
3
Taungyi-Hsihseng 66kV Line (44) miles & Substations
4
Mong Naung-Kyethi 66 kV Line (30) miles & Substations
PAUNG LAUNG
ဘဘဘဘ
PYINMANA
MOGAUNG
SAGAING DIVISION
Sr.
MOHNYIN
38
Project Name
2013-2014 Project Plan
NABAR
THAPHANSEIK
30 MW
2
Gangaw-Kale 230 kV Transmission Line (80) miles & Substation
3
132/66kV, 100MVA၅Extension at Kyaukpahto Substation
ဘဘဘဘဘ
၅ ဘဘဘဘဘ
၅၅၅
ဘဘဘ
MOGOK
ဘဘဘဘဘဘဘဘ
KALAYWA
NGEPYAWDAING LATPANHLA
SEDAWGYI
25 MW
MONYWA
(AUNGCHANTHAR)
NYAUNGBINGYI
132/33 kV, 2 x 50 MVA Monywa Substation
2014-2015ဘဘဘ
Project Plan
KALE
KYAW
1
ဘဘဘဘဘဘ(၅)
KYAUKPAHTO
THINEGIN
ဘဘဘဘဘဘ
AUNGPINLE
MYAUKPYIN
ဘဘ
၅
ဘဘဘဘဘဘဘဘဘဘ
၅
၅
၅
1
Thinegin-Kale-Kalewa
66 kV Transmission
၅ ဘဘဘဘဘ
ဘဘဘ
၅
ဘဘဘဘဘဘ
၅
ဘဘဘဘဘ
၅
ဘဘဘဘဘဘဘဘ
ဘဘဘဘဘဘဘ
ဘဘဘဘဘ
ဘဘဘဘဘဘဘဘဘဘ
၅
၅
၅
၅
ဘဘဘဘဘဘဘဘ
ဘဘဘဘဘဘဘဘဘ
ဘဘဘဘဘ
ဘဘဘဘဘ
INDUSTRIAL
ဘဘဘဘဘ
ဘဘ
ဘဘဘဘဘဘဘဘ
၅
၅
PAKHANGE
၅
CHAUNGKU
၅
ဘဘဘဘဘ
BELIN
PAKHOKKU
ဘဘဘဘဘဘဘ(၅)(၅၅ဘဘဘဘဘဘဘဘဘဘ
PAUK
ဘဘဘ)
ဘ
MYINGYAN
ဘဘဘဘဘဘဘ(၅)(၅၅ဘဘဘဘဘ
ဘဘဘ
ဘဘဘ)
ဘဘဘဘဘဘ ဘဘဘ
KYUNGCHAUNG
ဘဘဘ
ဘ
MYINGYAN
ဘဘဘ
Project(N)
၅
SAW
(STEEL MILL)
ဘဘဘ
၅
(L)
ဘဘဘဘဘဘဘဘဘ
ဘဘဘ
ဘဘဘဘဘဘ ဘဘဘ
ဘဘဘဘ
Project(P)
ဘဘဘဘ
ဘဘဘဘ
YINMARBIN
TANYAUNG
ဘဘဘဘ
SAETOTETAYAR
ဘ
THAPYIWA
ဘ
ဘဘဘဘဘဘဘဘဘဘဘဘဘ
ဘဘဘဘဘဘဘ
THAZI
၅
CHAUK
၅
ဘဘဘဘဘဘ
၅
YEPAUNGSON
MONE (75 MW)
၅
GANGAW
OHNTAW
Line (30) miles
MONYWA
NYAUNGBINGYI
MYAUKPYIN
ဘဘဘဘဘဘဘဘဘဘဘ
MANDALAY DIVITION
HSIBAW
PYINOOLWIN
TAGuNTAING
UPPER YEYWA
INDUSTRIAL ZONE
OHNTAW
PAKHANGYI
Sr.
SHWESATYAN
ဘဘဘဘဘဘဘ
Project Name
2012-2013 Project Plan
PAKOKEKU
NGAZON
BELIN
INGONE
YEYWA
ZAWGYI(1)
12 MW
MYINGYAN
ဘဘဘဘ
ZAWGYI(2)
18 MW
LAIHKA
TAUNG_T KWN
MYINGYAN
(STEEL MILL)
KINDA
1.
Upper Yeywa- Shwesaryan 230kV Line (80) miles
2.
230/33 kV,100MVA Naypyitaw(2) Substation
3.
Meikhtila-Taungoo 500 kV Transmission Line (146) miles
4.
Myogyi-Taungtawkwn 33kV Transmission Line (10) miles
MYOGYI
LOILEN
AUNGPAN
ဘဘဘဘဘဘ
ဘဘဘဘဘဘ
2013-2014 Project Plan
AUNGTHAPYAE
YINMARBIN
THAPYAWA
1.
PINPET
THAZI
CHAUK
KALAW
YEPONSONE
SHWEMYO
LINKHAE
3.
132/66 kV, 60 MVA Letpanhla Substation
4.
66/33 kV, 30 MVA Mogok Substation
2014-2015 Project Plan
PAUNGLAUNG
SONSE
BALUCHAUNG(1)
28 MW
PYINMANA
TAUNGTWINGYI
SINPAUNGWE
THEPHYU
AUNGLAN
KYAWSWA
BALUCHAUNG(2)
160 MW
KALAMA
KYAUKSWEKYO
SINTE
132/33 kV, 100 MVA Industrial Zone Substation
NAYPYITAW
MANN
PYAE
2.
TIKYIT
NAYPYITAW(2)
MAGWAY
132/33 kV, 100 MVA Taguntaing Substation
ဘဘဘဘဘဘဘဘဘဘဘဘဘ
1.
132/33 kV, 2 x 50 MVA Thazi Substation
2.
Chauk-Nyaungoo 66 kV Line (28) miles & Substation
3.
MyinChan-NgaZon 66kV Line (10)Miles & Substations
4.
ThapyaWa 500/230kV Substation
5.
AungPinlae 132/33kV, (20)MVA Substation
BALUCHAUNG(3)
52 MW
KAPAUNG
30 MW
TAUNGOO
2015-2016 Project Plan
1
230 /33kV, 100 MVA Thapyaywa(Meikhtila) Substation
39
ဘဘဘဘဘဘဘဘဘဘ
KYAW
(KA.PA.SA)
GANGAW
NYAUNGBINGYI
PAKHAGYI
MYITTHA
40 MW
၅၅
INDUSTRIAL
ZONE
OHNTAW
CHAUNGKU
MAGWAY DIVISION
ဘဘဘဘဘဘဘဘဘ
ဘဘဘဘဘဘဘဘ
Sr
40
ဘဘဘဘဘဘဘ
Project s Name
PAKKHOKKU
2012-2013 Project Plan
ဘဘဘဘဘ
ဘဘဘဘဘ ဘဘဘဘဘဘဘ(၅)(၅၅ဘဘဘဘဘ
ဘ
ဘဘဘ)
INGONE
PAUK
MINDAT
MYINGYAN
1
KYUNGCHAUNG
SAW
(KA.PA.SA)
1
KINDA
56 MW
YINMARBIN
THAPYAYWA
(MEIKHTILA)
SAYTOTETAYAR
3
THAZI
CHAUK
MONE
75 MW
230/66
kV, 100 MVA Chaungku & 66/35 kV, 60 MVA Pauk
ဘဘဘဘဘဘဘ
ဘဘဘဘဘဘဘဘဘဘဘဘဘ
Subsations.
ဘဘဘဘ
YEPAUNGSON
ဘဘဘဘဘဘ
2014-2015 Project Plan
ဘဘဘဘဘဘ
SHWEMYO
KYEEON
KYEEWA
70 MW
Mann-Taungdwingyi 230 kV Line (85) miles & Substations.
ဘဘဘဘဘဘဘဘဘ ဘဘဘဘဘဘဘဘဘ
ဘဘဘဘဘဘ
2ဘဘဘဘဘဘဘဘဘ
Tanyaung-Saw 66
kV Transmission Line (45) miles & Substations.
PROJECT-P TANYAUNG
NAYPYITAW(2)
MAGWAY
NGAPHE
230 /66 kV, 100 MVA Taungdwingyi Substation.
ဘဘဘဘဘဘဘ(၅)(၅၅ဘဘဘဘဘ
ဘဘဘဘဘဘ
ဘဘဘဘဘဘ
2013-2014 ဘဘဘ)
Project
Plan
MYINGYAN
(NGAZON)
PROJECT-N
ECT-L
ဘ
ဘဘဘဘဘဘဘဘဘဘဘ
MYAUKPYIN
1
ဘဘဘဘဘဘဘ230 kV Line (60) miles & Substations.
Gangaw-Chaungku
2
Myittha-Gangaw 66 kV Transmission Line (25) miles
3
Thapyaywa-Chauk-Minbu 230 kV Line (145) miles & Substations.
NAYPYITAW
MANN(MINBU)
2 X 18.45 MW
SONSAE
ဘဘဘဘဘဘဘဘဘဘဘဘ
ဘဘဘဘဘဘဘဘဘဘဘဘ(၅)
4 (၅၅ဘဘဘဘဘဘဘဘ)
Kyungchaung-Mann 230 kV Line (90) miles & Substations.
PYINMANA
TAUNGDWINGYI
SINPAUNGWE
PROJECT-C
AUNGLAN
THAYET
KANMA
5
THEPHYU
ဘဘဘဘဘဘဘဘဘဘဘဘ(၅)
6
Aunglan-Thayet 66 kV Line (10) miles & Substations.
(၅၅၅ဘဘဘဘဘဘဘဘ)
KALAMA
KYAUKSWEKYO
KYAWSWA
PYAY
KHAPAUNG
(30 MW)
7
Oakshitpin-Kanma 66 kV Line (30) miles & Substations.
ဘဘဘဘဘဘဘဘဘဘဘဘ(၅)
(၅၅ဘဘဘဘဘဘဘဘ)
2015-2016 Project Plans
SINDE
Taungoo
PAUK KAUNG
PHYU
(40 MW/2013)
OAKSHITPIN
Taungdwingyi-Aunglan 132 kV Line (66) miles & Subsations.
SHEWDAUNG
KUN
1
132/66 kV, 60 MVA Pakkhokku(Budhakone) Substation
AUNGPANG
LOILEM
AUNGTHAPYE
NAMSAN
BAGO DIVISION
THAZI
THAPYAYWA
(MEIKHTILA)
YINMARBIN
PINPET
ဘ
Sr
Project Name
PINPET
YEPAUNGSON
2012-2013 Project Plan
SHWEMYO
TIKYIT
1
Shwedaung-Myaungtagar 230kV Transmission Line (130) miles
2
230/33 kV, 100 MVA Kamarnat Substation
3
230/33 kV, 100 MVA Minhla Substation
4
230/33 kV, 100 MVA Sittaung Substation
NAYPYITAW(2
)
MAGWAY
PAUNGLAUNG
NAYPYITAW
SONSAE
BALUCHAUNG(1)
(28 MW)
PYINMANA
TAUNGDWINGYI
GWE
2013-2014 Project Plan
1
Taungoo-Kamarnat 500 kV Transmission Line (117) miles
2
Karmanat-Myaungtagar 500 kV Transmission Line (50) miles
3
Thaukyekhat(2)-Taungoo 230 kV Transmission Line (13) miles
4
Taungdwingyi-Shwedaung 230kV Transmission Line (100) miles &
THEPHYU
KALAMA
LAN
BALUCHAUNG(2)
(168 MW)
KYAUKSWEKYO
BALUCHAUNG(3)
( 52 MW)
KHAPAUNG
(30 MW)
PYAY
THAUK-YE-KHAT
(120 MW /2013)
PAUK KAUNG
PHYU
TAUNGOO
2014-2015 Project Plan
KUN
SHEWDAUNG (60 MW)
YENWE
MINHLA (25 MW)
​ZAUNGTU
(20 MW)
Substations
1
Taungoo-Shwedaung 230 kV Line (110) miles & Substations
2
Baluchaung(2)-Taungoo 230kV Line (96) miles & Substations
3
500/230 kV, 500 MVA Kamarnat Substation
4
500/230 kV, 500 MVA Taungoo Substation
SHWEKYIN
THARYARGONE
SITTAUNG
MYANAUNG
KAMARNAT
2015-2016 Project Plan
MYAUNG TAGAR
HINTHADA
EAST DAGON
1
Minhla-Hinthada 230 kV Line (60) miles & Substations
41
AYEYARWADDY DIVISION
SHEWDAUNG
OAKSHITPIN
NYAUNGCHE
DAUUK
Sr
Project Name
42
ဘ
ဘ
ဘဘဘဘ
MINHLA
MATHONE
ဘ
(၅၅
2012-2013 Project Plan
KYANKIN
1
MYANAUNG
Athoke-Pathein 230kV Line (40) miles & Substations.
2013-2014 Project Plan
MYAUNG TAGAR
1
Pathein-Chaungthar 66kV Line (35) miles & Substations.
2
Pathein-Ngwesaung 66kV Line (30) miles & Substations.
3
Pathein-Kanni 66kV Line (7) miles & Substations.
4
Hlaingtharyar-Kyaiklat 230kV Line (30) miles & Substations.
HINTHADA
YEGYI
DANUBYU
YWAMA
2014-2015 Project Plan
ဘဘဘဘဘ
ATHOKE
THARBAUNG
1
HLAWG
LAYMYATNAR
BAYINTNAUN
Hinthada-Athoke 230 kV Line (80) miles
CHAUNGTHAR
2
HLAINGTHARYAR
Oakshitpin-Hinthada 230kV Line (95) miles & Substations.
PATHEIN
AHLON
KANGYIDAUNT
3
Hlaingthayar-Kyaiklat 66kV Line (30) miles & Substations.
MYAUNGMYA
NGWESAUNG
4
Kyaiklat-Pyapon 66 kV Line (15) miles & Substations.
5
Kyaiklat-Bokalay 66kV Line (35) miles & Substations.
6
Hinthada - Laymyatnar 66kV Line (15) miles & Substations.
7
Hinthada - Danubyu 66kV Line (35) miles & Substations.
8
66/11kV, 2 x 10 MVA Hinthada Substaion
KYAIKLA
T
KANNI
LAPUTTA
BOKALAY
PYAPON
Sr.
PHYU
YANGON DIVISION
Project Name
2012-2013 Project Plan
OAKSHITPIN
KUN
(60 MW)
SHEWDAUNG
MATHONE
THARYARGON
E
​ZAUNGT
U
(25 MW)
KYANKIN
Thaketa- East Dagon 230kV Line (10) miles & Substations.
2
230/33 kV, 100 MVA Myaungtagar Substation
3
230/33 kV, 2 x 100 MVA Hlawga Substation
4
230/33 kV, 100 MVA Hlaingtharyar Substation
SHWEKYIN
YENWE
(25 MW)
NYAUNGCHE
DAUUK
1
MYANAUNG
2013-2014 Project Plan
KAMARNAT
HINTHADA
1
Ywama-Hlaingtharyae 230kV Line (7)miles & Substations
MYAUNG TAGAR
2014-2015 Project Plan
EAST DAGON
HLAWGA
YEGYI
SEINPANMYAING
1
Shwelinpan (In/Out )Line (6) miles & Substations.
2
230/66kV, 100MVA Ywama Substation
3
ဘဘဘဘ
Myaungdagar-Hlaingtaryar
230kV Transmission
ဘဘဘဘဘဘဘဘLine (28) miles
4
Thaketa- Ahlone 230kV Line (11) miles & Substation
YWAMA
SHWELINPAN
ATHOKE
ဘဘဘဘဘ
THAKETA
KYAIKASAN
THILAWA
2015-2016 Project Plan
ဘဘဘဘဘဘဘဘဘဘ
BAYINTNAUNG
THANLYIN
HLAINGTHARYAR
1
THIDA
2
KANGYIDAUNT
Hlawga-Ywrma 230kV line(10)miles & Substations ဘဘဘဘဘ
AHLON
3
KamarNut-EastDagon 230kV Line,(40)miles & Substations
ဘဘဘဘဘဘဘ
ဘဘဘဘ
ThanLynn-Thilawa 230kV Line (15)miles & Substations
4
Hlawga-Thakata 230kV Line (5)miles
& Substations
ဘဘဘဘဘဘဘဘဘ
5
Ahlone-Dala ဘဘဘဘဘဘဘဘဘဘဘ
230kV Line (8)miles & Substations
6
Thida GIS 230/66/11kV, 2x200 MVA Substations
MYAUNGMYA
43
44
TANINTHARYI DIVISION
Sr
Project Name
2013-2014 Project Plan
THATON
1
PHAAN
INDUSTRIAL
ZONE
ဘဘဘ
MYAINGGALAY
PHAYARGONE MYAWADDY
KAWKAREIK
MAWLAMYINE
CHAUNGSONE
YE
DAWEI
Mawlamyine-Ye-Dawei 230 kV Tranmsission Line (132) miles &
Substations.
45
Current Status of Implementation of Projects (Transmission Lines & Substations),
On-going and will be Completed During Financial Years of (2012-2013) To (2015-2016)
Estimated Project Cost
Sr.
Project Name
Material Cost
Mil: Kyats(Mil:USD)
Construction Cost
Mil: Kyats(Mil:USD)
Remarks
Kachin State
1.
Waingmaw-Myitkyina(1)(2)(3) 66 kV
Transmisson Line (30) mile
4,261(4.734)
664.5(.738)
Completed
2.
Myitkyina-Mogaung66 kV Transmisson Line
(42) mile
1,754(1.949)
930.5(1.034)
Completed
3.
Myitkyina(1),Myitkyina(2) & Myitkyina(3) 66
kV Substation
16,160(17.956)
1,314(1.460)
Completed
4.
Bhamo-Nabar, Ngapawdine-Ohntaw 230 kV
Transmisson Lines (285) mile & Substations
89,786(99.762)
42,602(47.336)
2013-2014 Financial year
5.
Bhamo-Myotit-Dawponyan 66 kV Transmisson
Line (34) mile & Substations
2,800(3.111)
2,657(2.952)
2013-2014 Financial year
6.
Waingmaw-Mogaung 132 kV Transmisson Line
(60) mile & Substations
11,880(13.200)
2,642(2.936)
2014-2015 Financial year
7.
Mogaung- Hpakant 66 kV Transmisson Line
(55) mile & Substations
4,225(4.694)
2,350(2.611)
2014-2015 Financial year
130,866(145.407)
53,160(59.067)
Sub Total
Exchange Rate :
1 USD = 900 Ks.
46
Status of Implementation of Projects (Transmission Lines & Substations),
On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Estimated Project Cost
Sr.
Project Name
Material Cost
Mil: Kyats(Mil:USD)
Construction Cost
Mil: Kyats(Mil:USD)
Note
Kayar State (Contd;)
1.
Baluchaung(2)-Shwemyo 230 kV Transmisson
Line (120) mile & Substations
2.
Baluchaung(2)-Baluchaung(3) 132 kV
Transmisson Line (4) mile & Substation
Extension
3.
Baluchaung(2)-Loikaw 132 kV Transmisson
Line (12) mile & Substations
4.
2012-2013 Financial year
19,500(21.667)
7,699(8.554)
2012-2013 Financial year
14,709(16.343)
3,222(3.580)
2014-2015 Financial year
Loikaw-Shadaw 66 kV Transmisson Line (45)
mile & Substations
2,375(2.639)
1,979(2.199)
2014-2015 Financial year
5.
Loikaw-Bawlakhe 66 kV Transmisson Line (60)
mile & Substations
4,200(4.667)
2,491(2.768)
2014-2015 Financial year
6.
Bawlakhe-Hpasawng 66 kV Transmisson Line
(40) mile & Substations
5,400(6.000)
1,807(2.008)
2014-2015 Financial year
46,184(51.316)
17,198(19.109)
Total for Kachin State
47
Status of Implementation of Projects (Transmission Lines & Substations),
On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Estimated Project Cost
Sr.
Project Name
Material Cost
Note
Mil: Kyats(Mil:USD)
Construction Cost
Mil: Kyats(Mil:USD)
-
1,020(1.133)
On-Going
Kayin State
1.
Hpa-an-Industrial Zone 66 kV Transmisson Line
(17) mile & Substations
2.
Hpa-an-Phayarkone(Zartabyin) 66 /11kV, 5
MVA Substation
2,250(2.500)
879(0.977)
2013-2014 Financial year
3.
Mawlamyine-Kawkareit-Myawadi 230 kV
Transmission Line (80) mile & Substations
27,900(31.000)
8,675(9.639)
2014-2015 Financial year
4.
Hpa-an-Hlinebwe 66 kV Transmisson Line (27)
mile & Substations
2,860(3.178)
1,392(1.547)
2014-2015 Financial year
33,010(36.678)
11,966(13.296)
Total for Kayar State
Status of Implementation of Projects (Transmission Lines & Substations),
48
On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Estimated Project Cost
Sr.
Project Name
Material Cost
Construction Cost
Mil: Kyats(Mil:USD)
Mil: Kyats(Mil:USD)
Note
Chin State
1.
Kyaw-Gangaw-Harkhar 66 kV Transmisson Line
(89) mile & Substations
11,531(12.812)
2,010(2.233)
On-Going
2.
Harkhar-Phalam-Taingin 66 kV Transmisson Line
(50) mile & Substations
5,600(6.222)
3,820(4.244)
2013-2014 Financial year
3.
Pauk-Minthet 66 kV Transmisson Line (35) mile &
Substations
2,880(3.200)
2,295(2.550)
2013-2014 Financial year
22,011(22.234)
8,125(9.028)
11,106(12.340)
6,990(7.767)
On-Going
Total for Chin State
Mon State
1.
Thaton-Mawlamyine 230 kV Transmisson Line
(50) mile & Substations
2.
Mawlamyine-Chaungzon 66 kV Transmisson Line
(18) mile & Substations
3,618(4.020)
5,084(5.649)
2013-2014 Financial year
3.
Mawlamyine-Thanbuzayat 66 kV Transmisson
Line (35) mile & Substations
3,600(4.000)
1,665(1.850)
2013-2014 Financial year
4.
66/11 kV, 20 MVA & 66/33 kV, 20 MVA
Mawlamyine Substation
4,050(4.500)
438(0.487)
2014-2015 Financial year
5.
Thaton-Bilin 66 kV Transmission Line (38) mile &
Substations
3,368(3.742)
1,768(1.964)
2015-2016 Financial year
25,742(28.602)
15,945(17.717)
Total for Mon State
Status of Implementation of Projects (Transmission Lines & Substations),
49
On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Estimated Project Cost
Sr.
Project Name
Material Cost
Construction Cost
Mil:Kyats(Mil:USD)
Mil: Kyats(Mil:USD)
Note
Rakhine State
1.
Mann-Ann-Ponnagyun 230 kV Transmission Line
(200) mile & Substations
2.
Oakshitbyin-Toungup-Ma-ei 230 kV Transmission
Line (139) mile & Substations
3.
On-Going
68,741(76.379)
21,699(24.110)
Ma-ei-Kyaukphyu 230 kV Transmisson Line (65)
mile
14,040(15.600)
2,224(2.471)
2013-2014 Financial year
4.
Kyaukphyu 230 kV Substation-Kyaukphyu 66 kV
Transmission Line (5) mile & Substations
2,025(2.250)
569(0.632)
2013-2014 Financial year
5.
Mrauk-u-Ponnagyun-Sittwe 66 kV Transmission
Line (57) mile & Substations
6,660(7.400)
2,856(3.173)
2013-2014 Financial year
6.
Ponnagyun-Kyauktaw 66 kV Transmission Line
(40) mile & Substations
2,520(2.800)
1,807(2.008)
2013-2014 Financial year
7.
Kyaukphyu-Ramree 66 kV Transmission Line (41)
mile & Substations
3,645(4.050)
1,870(2.078)
2013-2014 Financial year
Sub Total
On-Going
50
Status of Implementation of Projects (Transmission Lines & Substations),
On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Estimated Project Cost
Sr.
Project Name
Material Cost
Mil: Kyats(Mil:USD)
Construction Cost
Mil: Kyats(Mil:USD)
Note
Yakhine State (cont;)
8.
Toungup-Thandwe 66 kV Transmission Line
(30) mile & Substations
4,000(4.444)
1,465(1.628)
2013-2014 Financial year
9.
Kyauktaw-Buthitaung 66 kV Transmission
Line (35) mile & Substations
3,183(3.537)
1,665(1.850)
2014-2015 Financial year
Mrauk-u-Minbya 66 kV Transmission Line (20)
mile & Substations
2,250(2.500)
1,152(1.280)
2014-2015 Financial year
11.
Thandwe-Kyeintali 66 kV Transmission Line
(84) mile & Substations
6,480(7.200)
3,342(3.713)
2014-2015 Financial year
12.
Athoke- Gwa 66 kV Transmission Line (62)
mile & Substations
4,320(4.800)
2,589(2.877)
2014-2015 Financial year
117,864(130.960)
41,238 ( 45.820)
10
Total for Yakhine State
51
Status of Implementation of Projects (Transmission Lines & Substations),
On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Estimated Project Cost
Sr.
Project Name
Material Cost
Construction Cost
Mil:Kyats(Mil:USD)
Mil:Kyats(Mil:USD)
Note
Shan State
1.
Kalaw-Pindaya 66 kV Transmission Line (22) mile
& Substations
1,889(2.099)
800(0.889)
Completion
2.
Aungthapyay-Naungkar 66 kV Transmission Line
(17) mile & Substations
1,389(1.543)
1,050(1.167)
Completion
3.
Khainglon-Konhein 66 kV Transmission Line (33)
mile & Substations
3,272(3.636)
2,499(2.777)
On-Going
4.
Lashio-Mineyal- Tantyan 66 kV Transmission Line
(87) mile & Substations
3,931(4.368)
3,882(4.313)
On-Going
5.
Teinni-Tarmoenye-Launktai 66 kV Transmission
Line (75) mile & Substations
7,171(7.968)
3,471(3.857)
On-Going
6.
Taunggyi 132/66 kV, 100 MVA Substation
5,400(6.000)
450(0.500)
2013-2014 Financial
year
7.
Lecha 66/11 kV, 5 MVA Substation
2,000(2.222)
438(0.487)
2013-2014 Financial
year
8.
Minenaung- Mineshoe 66 kV Transmission Line
(33) mile & Substations
3,200(3.556)
2,297(2.552)
2013-2014 Financial
year
Sub Total
52
Status of Implementation of Projects (Transmission Lines & Substations),
On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Estimated Project Cost
Sr.
Project Name
Material Cost
Construction Cost
Mil: Kyats(Mil:USD)
Mil: Kyats(Mil:USD)
Note
Shan State ( Contd)
9.
Upper Baluchaung- Kalaw 66 kV Transmission Line
(20) mile & Substations
-
684(0.760)
2013-2014 Financial
year
10.
Mansan-Teinni 230 kV Transmission Line (60) mile
& Substations
24,390(27.100)
6,163(6.848)
2014-2015 Financial
year
11.
Teinni- Kutkhaing-105 mile (Musal) 66 kV
Transmission Line (60) mile & Substations
5,940(6.600)
2,550(2.833)
2014-2015 Financial
year
12.
Taunggyi- Sesai 66 kV Transmission Line (44) mile
& Substations
3,150(3.500)
1,535(1.706)
2014-2015 Financial
year
13.
Minenaung- Gyithe 66 kV Transmission Line (30)
mile & Substations
3,150(3.500)
1,494(1.660)
2014-2015 Financial
year
14.
Mansan- Lashio 66 kV Transmission Line (26) mile
& Substations
3,622(4.024)
2,207(2.452)
2014-2015 Financial
year
68,504(76.116)
29,520(32.800)
Total for Shan State
53
Status of Implementation of Projects (Transmission Lines & Substations),
On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Estimated Project Cost
Sr.
Project Name
Note
Material Cost
Mil: Kyats(Mil:USD)
Construction Cost
Mil: Kyats (Mil:USD)
-
2,270(2.522)
2013-2014 Financial
year
28,512(31.680)
7,249(8.054)
2013-2014 Financial
year
Sagaing Region
1.
Nyaungbingyi- Latpandaung 230 kV
Transmission Line (3.5) mile & Substations
2.
Gangaw- Kalay 230 kV Transmission Line (80)
mile & Substations
3.
Kyaukpahtoe 132/66 kV, 100MVA Substation
Extension
6,300(7.000)
450(0.500)
2013-2014 Financial
year
4.
Monywa 132/33 kV, 2x50 MVA Substation
Extension
8,380(9.311)
1,890(2.100)
2014-2015 Financial
year
5.
Taingin- Kalay-Kalaywa 66 kV Transmission
Line (30) mile & Substations
4,5005.000)
1,902(2.113)
2014-2015 Financial
year
47,692(52.991)
13,761(15.290)
Mawlamyine- Ye-Dawei 230 kV Transmission
Line (132) mile & Substations
50,373(55.970)
22,023(24.470)
Total for Tanintharyi Region
50,373(55.970)
22,023(24.470)
Total for Sagaing Region
Tanintharyi Region
1.
2013-2014 Financial
year
54
Status of Implementation of Projects (Transmission Lines & Substations),
On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Estimated Project Cost
Sr.
Project Name
Material Cost
Mil: Kyats(Mil:USD)
Construction Cost
Mil: Kyats(Mil:USD)
Note
Bago Region
1.
Sittaung 230/33 kV, 100MVA Substation
3,413(3.792)
1,910(2.122)
Completion
2.
Kamarnat 230/33 kV, 100MVA Substation
Extension
3,758(4.176)
250(0.278)
On-Going
3.
Minhla 230/33 kV, 100MVA Substation
3,753(4.170)
1,910(2.122)
On-Going
4.
Shwetaung- Myaungtagar 230 kV Transmission
Line (130) mile & Substations
11,628(12.920)
10,273(11.414)
On-Going
5.
Thautyekhat(2)- Taungoo 230 kV Transmission
Line (13) mile & Substations
-
826(0.918)
On-Going
6.
Chaungkuu 230 /66 kV, 100 MVA Substation
Extension
78,975(87.750)
17,316(19.240)
2013-2014 Financial
year
7.
Taungdwingyi- Shwetaung 230 kV Transmission
Line (100) mile & Substations
18,100(20.111)
7,944(8.827)
2013-2014 Financial
year
8.
Kamarnat-Myauntagar 500 kV Transmission
Line (50) mile
37,800(42.000)
7,400(8.222)
2014-2015 Financial
year
9.
Taungoo- Shwetaung 230 kV Transmission Line
(100) mile
26,640(29.600)
8,720(9.689)
2014-2015 Financial
year
55
Status of Implementation of Projects (Transmission Lines & Substations),
On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Estimated Project Cost
Sr.
Project Name
Material Cost
Mil: Kyats(Mil:USD)
Construction Cost
Mil: Kyats(Mil:USD)
Note
Bago Region
10.
Baluchaung(2)- Taungoo 230 kV Transmission
Line (96) mile
16,992(18.880)
5,864(6.516)
2014-2015 Financial
year
11.
Kamarnat 500/230 kV, 500 MVA
23,400(26.000)
1,000(1.111)
2014-2015 Financial
year
12.
Taungoo 500/230 kV, 500 MVA
23,400(26.000)
1,000(1.111)
2014-2015 Financial
year
13.
Minhla- Hinthada 230 kV Transmission Line (60)
mile & Substations
12,510(13.900)
4,838(5.376)
2015-2016 Financial
year
260,369(289.299)
69,251(76.946)
56
Status of Implementation of Projects (Transmission Lines & Substations),
On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Estimated Project Cost
Sr.
Project Name
Note
Material Cost
Mil: Kyats(Mil:USD)
Construction Cost
Mil: Kyats(Mil:USD)
22,324(24.804)
13,028(14.476)
2013-2014 Financial
year
3,600(4.000)
1,494(1.660)
2013-2014 Financial
year
Magway Region
1.
Mann- Taungdwingyi 230 kV Transmission Line
(85) mile & Substations
2.
Oakshitpin- Kanma 66 kV Transmission Line (30)
mile & Substations
3.
Thapyaewa-Chauk-Minbu 230 kV Transmission
Line (145) mile & Substations
33,852(37.613)
10,765(11.961)
2014-2015 Financial
year
4.
Kyunchaung-Mann 230 kV Transmission Line
(90) mile & Substations
21,780(24.200)
7,367(8.186)
2014-2015 Financial
year
Chaungkuu 230 /66 kV, 100 MVA Substation
Extension
11,072(12.302)
400(0.444)
5.
2014-2015 Financial
year
6.
Taungdwingyi- Aunglan 132 kV Transmission
Line (66) mile & Substations
13,487(14.986)
2,792(3.102)
2014-2015 Financial
year
7.
Taungdwingyi 132/66 kV, 100 MVA Substation
Extension
4,161(4.623)
350(0.389)
2014-2015 Financial
year
57
Status of Implementation of Projects (Transmission Lines & Substations),
On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Estimated Project Cost
Sr.
Project Name
Material Cost
Mil: Kyats(Mil:USD)
Construction Cost
Mil: Kyats(Mil:USD)
Note
Magway Region
8.
Gangaw-Chaungkuu 230 kV Transmission Line
(60) mile, Myittar- Gangaw 66 kV Transmission
Line (25) mile & Substations
22,500(25.000)
6,418(7.131)
2014-2015 Financial
year
9.
Aunglan- Thayet 66 kV Transmission Line (10)
mile & Substations
2,307(2.563)
492(0.547)
2014-2015 Financial
year
10.
11.
Tanyaung- Saw 66 kV Transmission Line (45)
mile & Substations
8,640(9.600)
2,008(2.231)
Pakokku(Buddha Kone) 132/66 kV, 60 MVA
Substation Extension
5,535(6.150)
1,492(1.658)
149,258(165.842)
46,606(51.784)
2014-2015 Financial
year
2015-2016 Financial
year
58
Status of Implementation of Projects (Transmission Lines & Substations),
On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Estimated Project Cost
Sr.
Project Name
Material Cost
Mil: Kyats(Mil:USD)
Construction Cost
Mil: Kyats(Mil:USD)
Note
4,446(4.940)
1,910(2.122)
On-Going
100,529(111.699)
21,608(24.009)
2012-2013 Financial
year
Mandalay Region
1.
Naypyitaw 230 /33 kV, 100 MVA Substation
2.
Meikhtila-Taungoo 500 kV Transmission Line (146)
mile
3.
Upper Yeywar-Shwesaryan 230 kV Transmission Line
(80) mile & Substation Extension
15,498(17.220)
4,857(5.397)
2012-2013 Financial
year
4.
Myogyi-Taungtawkwin 33 kV Transmission Line (10)
mile & Substation Extension
1,594(1.771)
612(0.680)
2012-2013 Financial
year
5.
Tagontaing 132/33 kV, 100 MVA Substation
Extension
6,300(7.000)
250(0.278)
2013-2014 Financial
year
6.
7.
8.
2013-2014 Financial
year
Latpanhla 132/66 kV, 60 MVA Substation Extension
8,978(9.976)
300(0.333)
23,400(26.000)
1,000(1.111)
Moegote 66/33 kV, 30 MVA Substation Extension
Thapyaewa(Meikhtila) 500/230 kV, 500 MVA
Substation
2013-2014 Financial
year
2014-2015 Financial
year
59
Status of Implementation of Projects (Transmission Lines & Substations),
On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Estimated Project Cost
Sr.
Project Name
Material Cost
Mil: Kyats(Mil:USD)
Construction Cost
Mil: Kyats(Mil:USD)
Note
10,773(11.970)
438(0.487)
2014-2015 Financial
year
6,300(7.000)
450(0.500)
2014-2015 Financial
year
Mandalay Region
9.
10.
Industrial Zone 132/33 kV, 100 MVA Substation
Tharzi 132/33 kV, 2x50 MVA Substation Extension
11.
Aungpinlal 132/33 kV, 2x50 MVA Substation
Extension
4,500(5.000)
258(0.287)
2014-2015 Financial
year
12.
Chauk- Nyaung Oo 66 kV Transmission Line (28)
mile & Substations
2,722(3.024)
1,396(1.551)
2014-2015 Financial
year
13.
Myingyan- Ngazon 66 kV Transmission Line (10)
mile & Substations
2,250(2.500)
780(0.867)
2014-2015 Financial
year
14.
Bellin 230/33 kV, 100 MVA Substation Extension
7,380(8.200)
350(0.389)
2015-2016 Financial
year
15.
Thapyaewa(Meikhtila) 230/33kV, 100 MVA Substation
Extension
7,380(8.200)
350(0.389)
2015-2016 Financial
year
202,050(224.500)
34,559(38.399)
Total Mandalay Region
60
Status of Implementation of Projects (Transmission Lines & Substations),
On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Estimated Project Cost
Project Name
Material Cost
Mil: Kyats(Mil:USD)
Construction Cost
Mil: Kyats(Mil:USD)
Note
1.
Athoke-Pathein 230 kV Transmission Line (40) mile
& Substations
18,000(20.000)
4,360(4.844)
2012-2013 Financial
year
2.
Hlaingtharyar-Kyeiklat 230 kV Transmission Line
(30) mile & Substations
13,547(15.052)
4,329(4.810)
2013-2014 Financial
year
3.
Pathein-Chaungthar 66 kV Transmission Line (35)
mile & Substations
2,925(3.250)
1,665(1.850)
2013-2014 Financial
year
4.
Pathein-Ngwesaung 66 kV Transmission Line (30)
mile & Substations
2,700(3.00)
1,495(1.661)
2013-2014 Financial
year
5.
Pathein-Pathein(Kyotadar) 66 kV Transmission
Line (7) mile & Substations
3,857(4.286)
708(0.787)
2013-2014 Financial
year
6.
Hinthada-Athoke 230 kV Transmission Line (80)
mile & Substation Extension
20,160(22.400)
6,391(7.101)
2014-2015 Financial
year
7.
Oakshitpin-Hinthada 230 kV Transmission Line (95)
mile & Substations
23,310(25.900)
9,375(10.417)
2014-2015 Financial
year
8.
Hlaintharyar-Kyeiklat 66 kV Transmission Line (30)
mile & Substation Extension
3,600(4.000)
1814(2.016)
2014-2015 Financial
year
Sr.
Ayeyarwaddy Region
61
Status of Implementation of Projects (Transmission Lines & Substations),
On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Estimated Project Cost
Sr.
Project Name
Material Cost
Mil: Kyats(Mil:USD)
Construction Cost
Mil: Kyats(Mil:USD)
Note
Ayeyarwaddy Region (Contd;)
9.
Kyeiklat –Phyarpone 66 kV Transmission Line (15)
mile & Substations
2,307(2.563)
951(1.057)
2014-2015 Financial
year
10.
Kyeiklat –Bokalay 66 kV Transmission Line (35)
mile & Substations
3,229(3.588)
1,635(1.817)
2014-2015 Financial
year
Hinthada 66/11 kV, 2x10 MVA Substation Extension
3,690(4.100)
4,38(0.487)
2014-2015 Financial
year
12.
Hinthada-Laymyatnar 66 kV Transmission Line
(15) mile & Substation Extension
1,845(2.050)
951(1.057)
2014-2015 Financial
year
13.
Hinthada-Danuphyu 66 kV Transmission Line
(35) mile & Substation Extension
2,768(3.076)
1,635(1.817)
2014-2015 Financial
year
101,938(113.264)
35,747(39.719)
11.
Total (Ayeyarwaddy Region )
62
Status of Implementation of Projects (Transmission Lines & Substations),
On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Estimated Project Cost
ဘဘ
ဘ
Project Name
Material Cost
Mil: Kyats(Mil:USD)
Construction Cost
Mil: Kyats(Mil:USD)
Note
Yangon Region (Contd;)
1.
Myaungtagar 230/33 kV, 100 MVA Substation
Extension
3,301(3.668)
250(0.278)
On-Going
2.
Hlawgar 230/33 kV, 2x100 MVA Substation Extension
7,050(7.833)
350(0.389)
On-Going
3.
Hlaintharyar 230/33 kV, 100 MVA Substation Extension
3,557(3.952)
250(0.278)
On-Going
4.
Thaketa-East Dagon 230 kV Transmission Line (10)
mile & Substations
17,370(19.300)
2,778(3.087)
2012-2013 Financial
year
5.
Ywarma-Hlaimgtharyar 230 kV Double Circuit
Transmission Line (7) mile & Substations
4,212(4.680)
5,719(6.354)
2013-2014 Financial
year
7,200(8.000)
450(0.500)
2014-2015 Financial
year
6.
Ywarma230/66 kV, 100 MVA Substation Extension
7.
Shwelinpanm In/Out 230 kV Transmission Line (6)
mile & Substations
9,612(10.680)
2,376(2.640)
2014-2015 Financial
year
8.
Myaungtagar-Hlaingtharyar 230 kV Transmission Line
(28) mile & Substations
9,696(10.773)
1,774(1.971)
2014-2015 Financial
year
Sub Total
63
Status of Implementation of Projects (Transmission Lines & Substations),
On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)
Estimated Project Cost
ဘဘ
ဘ
Project Name
Material Cost
Mil: Kyats(Mil:USD)
Construction Cost
Mil: Kyats(Mil:USD)
Note
9.
Thaketa-Ahlone 230 kV Transmission Line (11) mile &
Substations
2,700(3.000)
752(0.836)
2014-2015
Financial year
10.
North Oakkala-(Hlawgar-Thaketa) 230 kV Double
Circuit Transmission Line (5) mile & Substations
14,580(16.200)
2,789(3.099)
2015-2016
Financial year
11.
Hlawgar-Ywarma 230 kV Double Circuit Transmission
Line (10) mile & Substations
4,860(5.400)
956(1.062)
2015-2016
Financial year
25,200(28.000)
2,800(3.111)
2015-2016
Financial year
Yangon Region (Contd;)
12.
Thida GIS 230/66/11 kV, 2x200 MVA Substations
13.
Kamarnat-East Dagon 230 kV Double Circuit
Transmission Line (40) mile & Substations
11,340(12.600)
3,285(3.650)
2015-2016
Financial year
14.
Thanlyin-Thilawa 230 kV Double Circuit
Transmission Line (15) mile & Substations
9,990(11.100)
5,255(5.839)
2015-2016
Financial year
15.
Ahlone-Dala 230 kV Transmission Line (8) mile &
Substations
8,100(9.000)
2,481(2.757)
2015-2016
Financial year
138,768(154.187)
32,265(35.850)
1,392,629(1,547.366)
431,364(479.293)
Total for Yangon Region
FOR ALL STATE & REGION TOTAL
1,823,993 ( 2,026.659)
64
500 KV Power Transmission Plan In Myanmar
 500kV ShweLi(3)- ThaPyaWa
Double Circuit Line (250)miles
(Proposal Stage)
 500kV ThaPyaWa – Taungoo
Double Circuit Line (153.3)miles
(Contracted Stage)
 500kV MongTon-Taungoo
Double Circuit Line (230)miles
(Proposal Stage)
 500kV Taungoo-KamarNat
Double Circuit Line (117 )miles
(Proposal Stage)
 500kV KamarNat-MyaungTagar
Double Circuit Line (50)miles
(Proposal Stage)
ShweLi(3)
1050MW
ThaPyaWa
MongTon
7000MW
Taungoo
KarmarNut
MyaungTagar
65
List of Project To be Implemented by Myanma Electric Power Enterprise,
Ministry of Electric Power Under (5) Years Plan
(2012-2013) To (2015-2016)
Transmission Lines
Substations
No of Line
Line
Length
(km)
Voltage
(kV)
No of
Substation
Installed
Capacity
(MVA)
500
3
521
500
3
1500
230
37
4280
230
38
4486
132
4
237
132
17
1370
66
51
3047
66
66
857.5
33
1
17
33
-
-
Total
96
8102
Total
124
8213.5
Voltage
(kV)
66
The Existing High Voltage Transmission Lines with OPGW
Cable
Sr.
Name of Lines
Length of Lines(km)
1
Myaukpyin- Shwesaryan
26
2
Yaeywar-Thapaywa
112
3
Yaeywar-Belin
39
4
Belin-Thapaywa
88
5
Hlaingthayar - Ahlone
23
Total
288
High Voltage Transmission Lines
which were planned to replaced the existing Galvanized Steel Earth Wire with
OPGW (Upper Ring)
Sr.
Name of Lines
Length of Lines
(km)
1
Thapaywa - Thazi
27
2
Thazi - Shwemyo
121
3
Shwemyo - Pyinmana
40
4
Pyinmana - Naypyitaw
26
5
Belin - Shwesaryan
32
6
Taungdwingyi - Magwe
76
7
Magwe - Chauk
8
Chauk - Kyunchaung
9
Kyunchaung - Naungpingyi
117
45
163
10
Naungpingyi - Ohmtaw
92
11
Naungpingyi - Chaungu
108
12
Ohntaw - Belin
Toatal
64
911
67
High Voltage Transmission Lines
which were planned to replaced the existing Galvanized Steel Earth Wire
with OPGW (Lower Ring)
Sr.
Name of Lines
Length of Lines
(km)
1
NCC - Naypyitaw(1)
41
2
Naypyitaw(1) - Taungdwingyi
75
3
Taungdwingyi - Shwetaung
4
Myaungtagar - Hlaingtharyar
36
5
Myaungtagar - Hlawga
31
6
Tharyargone - Hlawga
151
143
7
Pyinmana - Thephyu
36
8
Thephyu - Taungoo
65
9
Taungoo - Tharyargone
97
10
Tharyargone - Khamarnet
93
11
Khamarnet - Thanlyin
98
12
Thanlyin - Tharketa
12
Toatal
878
68
69
OPGW NETWORK OF MYANMAR POWER SYSTEM
THANK YOU FOR YOUR KIND ATTENTION
Q&A
U Aung Kyaw Oo
Deputy Chief Engineer
Power Transmission Project
Department (PTP)
Myanmar Electric Power Enterprise
(MEPE)
Ministry of Electric Power(MOEP)
70