DRAFT DEVLOPMENT PLAN
BARANAGAR MUNICIPALITY
Presentation to KMPC
1 March 2007
VISION
• Once the seat of high religious customs and testimony to diverse cultural activities,
our century old municipality intends to transform itself into an environment friendly,
clean and attractive urban area not deterred by the past unplanned growth. Need
based and problem driven issues relating to infrastructure improvement plan,
pollution free mandate, organized and homogeneous growth perspective along with
heritage conservation, refurbished slum infrastructure and increased development
focus on poor households will aim to ensure all our citizens lead healthy lives.
• All excluded and marginalized groups who do not benefit from any poverty alleviation
schemes will get an opportunity to address their livelihood issues. Literacy mission
and health for the poor and masses operation are the two main forte to achieve the
above goal. Booming trade and commerce and industries on both sides of its many
main arteries, that characterize this municipality and underline its locational
advantage, have a formal and regulated growth.
• Simple and efficient organizational structure and long term innovative financial
planning will serve the local citizen better and have adequate solvency for the
municipality which has a long historical and renaissance background and ways to go
into the promising future.
CONTEXT
• The town has grown along the banks of the River
Hooghly - horizontal expansion is restricted by the river
on the west, Territory of KMC in the south and eastern
Railway lines in the North and East
• Resulting to phenomenal increase in population density
approximately 35000 persons per sq.Km.--second
highest in KMA
• Relatively western part of B.T. Road that is old Baranagar
is more saturated than eastern side of B.T. Road where
expansion potential has been observed
DEMOGRAPHY
• 41 out of 87 slums have more than 100 families
• SP Banerjee Road at ward 12 with 1223,niranjan Sen
•
•
Nagar at ward 33 with 813 families and Kalimata Colony
at ward 33 with 452 families are the highest in this order
Similarly out of 33 wards, 5 wards namely 8, 12, 25, 26
and 33 having more than 10000 population
Dual reasons may be attributed are over saturation at
older parts and availability of vacant land in the newly
developed locality where service and other lands are
open for encroachment by the squatters
INITIATING THE DDP
• Strategic thinking that went into the DDP preparation:
– Pro-poor project orientation
– Stress on operations and management of the existing infrastructure
– Significant capital investment for need based projects like high value
and prestigious new water treatment plant
– Development and environmental control on future and existing growth
– Livelihoods and local economic development for the urban poor as well
as improved healthcare and primary education service delivery
– Improved and more efficient municipal institutional strengthening with
focus on organizational development and manpower planning
THE PROCESS
• All the workshops 1 and 2 as per the toolkits of each sub
component were organised
• 20 focused group discussions with formal and informal stakeholders
of the municipality with respect to poverty alleviation, local
economic development, health care, education and slum
infrastructure improvement
• Various meetings to formulate plans for organization development,
internal process and system improvement, citizen interface and
financial plan
• Ad-hoc meetings of DPG and DTGs as and when necessary
THE STAKEHOLDERS
• Slum inhabitants, BPL families, marginalized and excluded class
• Ward citizens as a whole and daily commuters availing trans•
•
•
•
municipal services
Mothers and children of BPL families under healthcare and primary
education service
Business groups and trade associations, both formal and informal
including formal and informal service and manufacturing sectors,
trade and workers unions, insurance and financial institutions,
educational institutes and others
Other Municipal tax payers including commercial and domestic
sector
Municipal staff both technical and non technical, skilled and semiskilled
SURVEYS
•
•
•
•
•
•
•
•
•
Reconnaissance survey
Land use and infrastructure survey
GPS survey for collection of geo-database
Socio-economic household survey
Survey of educational institutes
Survey of health service institutes
Survey of existing industry
Survey of municipal markets
Survey and interviews of municipal staff for organizational
restructuring
• Sample survey and interviews of citizens to assess citizen interface
with the municipality
OBSTACLES
• Technical analysis and situation assessment had insufficient data
•
•
•
•
•
support
Assumptions had to be made for demand projection
Super imposition of modern development was impossible on the run
down and over crowded physical and social infrastructure base
Urban planning per capita norms and standards were superseded
by the phenomenal magnitude of the existing and future urban
growth which was beyond the DDP parameters
Unique urban growth has resulted in the explosion of all municipal
service delivery which was hard to bridge in the DDP proposals
Financial solvency of the municipality was another obstacle which
restricted remedial measures
FOCUS OF THIS DDP
Water supply
27%
Slum Development
16%
Road and Drains Construction/Maintenance
16%
Social and livelihood development
20% of
investible surplus
Municipal institutional strengthening
5% of
investible surplus
DEVELOPMENT GOALS
Component 1: Infrastructure, Land use and
Environment Development
1.1 SLUM INFRASTRUCTURE IMPROVEMENT PLAN
•
•
•
•
•
Provide a safe and healthy quality of life to all slum dwellers by ensuring
basic infrastructure services like water supply, sanitation, solid waste
management, local drainage, access roads with adequate street lighting
and access to health, education and recreation facilities.
Slums having worst infrastructure and socio-economic situation will be first
in hierarchy and demand highest priority.
Systematic integration of slum infrastructure with the entire ULB network
to get the best result.
Ensure equitable allocation of public resources across all communities
within the slums irrespective of caste, class and creed.
Motivate slum dwellers in construction, operations and maintenance of
infrastructure and collection of user charges
IDENTIFIED PROJECTS
1.1 Slum Infrastructure Improvement
Plan
• Integrated slum development scheme with overall development:
Sanitation, water supply, construction of roads and drains
Rs. 3.2004 crores
• Development of densely populated and congested areas and
improvement in drainage, sanitation, water supply, roads and other
areas
Rs. 2.40 crores
• Community participation in socio-economic parameters
• TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES =
Rs.5.6004 crores
DEVELOPMENT GOALS
Component 1: Infrastructure, Land use and
Environment Development
1.2 INTRA MUNICIPAL INFRASTRUCTURE IMPROVEMENT PLAN
•
•
•
•
To aim for cost-effective, time-bound incremental rather than
comprehensive plans with visible outputs in all segments of
municipal infrastructure.
Provide household level water connection in every household in
the ULB and ensure adequate water supply through public taps
for those who fall outside.
Adopt scientific and sustainable ways of disposal of municipal
solid waste.
Effort to provide safe, modern and hygienic sanitation facilities
for all and effective area drainage systems to eliminate water
logging in major commercial and residential areas in the ULB.
IDENTIFIED PROJECTS
1.2 Intra Municipal Infrastructure
Improvement Plan
• New WTP at Baroda Basak Street at ward
6
Rs 8 Crores
• Renovation, repair and reconstruction of
drains and roads
Rs 3.5 Crores
• TOTAL ALLOCATION FOR DDP PERIOD
FROM ALL SOURCES =Rs 17.1045 Crores
DEVELOPMENT GOALS
Component 1: Infrastructure, Land use and
Environment Development
1.3 TRANS MUNICIPAL INFRASTRUCTURE IMPROVEMENT PLAN
•
•
•
•
•
Development of parallel arterial roads for better connections with the
regional road networks within the KMA region and reducing traffic load
on existing BT road
Extension and Development of halt stations on both surface and underground railways.
Development and resumption of river transport as an alternative to
surface transport.
Identify innovative and environmentally sound waste management
facilities by providing sustainable ways of disposal of municipal solid
waste for the municipality, such that all dumping sites within the
municipality are cleared and freed for utilization for other purpose.
Capacity augmentation of existing water treatment plants and improved
distribution systems
IDENTIFIED PROPOSALS
1.3 Trans Municipal Infrastructure
Improvement Plan
• Capacity augmentation of existing water
•
treatment plants and increase in minimum
quantity of water supply per capita per day from
90 lpcd to 135 lpcd. Location: BaranagarKamarhati Joint Water Works
Rs 1 Crores
Renovation of ferry ghat and resumption of ferry
service from Kuthighat and Alambazar to
Babughat, Fairliy, Howrah, Bagbazar, Belur and
other places
Rs 35 Lakhs
DEVELOPMENT GOALS
Component 1: Infrastructure, Land use and
Environment Development
1.4 LAND USE DEVELOPMENT PLAN
•
•
•
•
•
Make available adequate land at appropriate locations for municipal
services.
Enhance condition of living in the congested areas of the municipality
through redevelopment of such areas or decentralized and new
schemes.
Effort for cleanliness, beautification, landscaping, horticulture, tree
plantation and greenery and urban forestry drive and regular
maintenance of public squares, parks, garden, river front or recreation
areas.
Provide adequate regulatory measures for unauthorized street
encroachments and buildings which are unfit for human habitation and
control regular lines of street by rearrangement and reconstruction of
streets.
Provide regulatory framework for disaster prone areas.
IDENTIFIED PROJECTS
1.4 Land use Development Plan
• Making land available through land acquisition for the
•
purpose of executing any development plan or scheme
to provide for orderly growth in the municipal area
including Compulsory land acquisition for road widening
near market adjoining GLT Rd at ward 4
Rs 1 Crore
TOTAL ALLOCATION FOR DDP PERIOD FROM ALL
SOURCES = Rs 1.52 Crores
DEVELOPMENT GOALS
Component 1: Infrastructure, Land use and
Environment Development
1.5 ENVIRONMENT MANAGEMENT PLAN
•
•
•
•
•
•
Achieve and maintain zero contamination and pollution free quality of
drinking water in the ULB.
Preserve and help extend green cover and water body in the ULB in
order to have a natural stand by and mitigate environmental risk.
Disseminate environmental awareness campaign specially for the
children and slum dwellers.
Conserve and restore built heritage and emphasize on improving the
cultural environment of the ULB.
Adopt innovative, environmentally sound, alternative method and nonconventional source of municipal services.
Prevent and control pollution of air, water and noise among others by
statutory regulations.
IDENTIFIED PROJECTS
1.5 Environment Management Plan
• Restoration/ renovation/ preservation of lakes, wetlands
•
and water bodies and making it conducive for fisheries
as a gainful economic activity Rs 50 Lakhs
Proposals for eco-friendly development within the ULB
including river front development. Location: Affected
localities of all wards and river side wards
Rs 10 Lakhs
• TOTAL ALLOCATION FOR DDP PERIOD FROM
ALL SOURCES =
Rs 71.10 Lakhs
DEVELOPMENT GOALS
Component 2: Social and
Livelihoods Development
2.1 LIVELIHOOD AND POVERTY ALLEVIATION
– Attempt and achieve institutional strengthening of existing
institutional and community structures in the ULB created by
the various Govt. plans and programs such as SJSRY, PMRY,
Youth Welfare Schemes, Schemes for minority communities,
etc. and increase the network of CDS, SHG, NHC, NHG, etc.
– Identify sustainable micro enterprise opportunities for the
urban poor in the ULB along with economic empowerment of
women, unemployed youths and other target groups through
entrepreneurship development training..
– Improve operational transparency and coverage of all
schemes for poverty alleviation including plan for the
homeless, shelter less squatters and informal settlers who do
not receive benefits from existing govt. schemes/ programs.
IDENTIFIED PROJECTS
2.1 Livelihood and Poverty Alleviation
• Economic empowerment of urban poor/ unemployed
youths by entrepreneurship development through the
listed trainings
Rs 20 Lakhs
• Institutional strengthening of UPE cell while
implementing government plans/ schemes
Lakhs
Rs 11.11
• TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES =
Rs 46.11 Lakhs
DEVELOPMENT GOALS
Component 2: Social and
Livelihoods Development
2.2 LOCAL ECONOMIC DEVELOPMENT
•
•
•
•
Easier regulatory processes and controls to facilitate, promote
and sustain the growth of manufacturing and small scale
industry/enterprise and service sector in the ULB.
Provision of improved infrastructural and basic services to
promote healthy growth of business and industry in the ULB.
Provision of high quality civic amenities for special industrial
zones earmarked for development.
Ensure local tourism, skills, arts and crafts receive adequate
facilitation and promotion beyond the geographical boundaries.
IDENTIFIED PROJECTS
2.2 Local Economic Development
• Relocation and zoning of Swarnakar/ Goldsmith jewelers
in one locality.
•
•
Rs 72.63 Lakhs
Creation of cultural and heritage sites through upkeep
and promotion of local history, culture and heritage
buildings at major places of interest and festivals within
Baranagar
Rs 50 Lakhs
TOTAL ALLOCATION FOR DDP PERIOD FROM ALL
SOURCES =
Rs 138.38 Lakhs
DEVELOPMENT GOALS
Component 2: Social and
Livelihoods Development
2.3 HEALTH CARE SERVICE DELIVERY IMPROVEMENT PLAN
•
Strengthening and development of Health Management Information System,
including introduction of urban health policy and improved system of
information, education and communication.
•
Emphasis on Public private partnerships for better functioning of public health
services.
•
Improved co-ordination with State Govt. Hospitals and dispensaries for
maintaining a better referral system and decentralizing load on the existing
municipal infrastructure.
•
Achieve maximum cost and utilization efficiency of the existing assets and human
resources like ambulance, equipment, building, dispensary, personnel, etc.
•
Community participation, health education and awareness building in promoting
municipal and state run health programs in the ULB to increase coverage of the
BPL people and marginal groups, specially within the Reproductive Health and
Child Care (RCH) domain.
•
Promote hygienic measures, including curb on the sale of all types of cooked and
uncooked food to reduce incidence of related diseases specially for the poorer
section of the community.
IDENTIFIED PROJECTS
2.3 Health Care Service Delivery
Improvement Plan
• Introduction of health service in the ward and creation of
health centers including construction of new health
centers and repair of existing ones, regular area
supervision by the health workers and distribution of
medicines and health check up by qualified doctors free
of cost.
>= Rs 50.56 Lakhs
• Reconstruction and remodeling of “ Prasuti Sadan” at
44/52, BT Rd
RS 20 Lakhs
TOTAL ALLOCATION FOR DDP PERIOD FROM ALL
SOURCES = Rs 3 Crores and 15 Lakhs
DEVELOPMENT GOALS
Component 2: Social and
Livelihoods Development
2.4 Primary Education Improvement Plan
–
–
–
–
Undertake renovation/ improvement of existing
educational infrastructure and related basic
services in the ULB.
Establish new educational infrastructure and
improve administration, standard and
performance of these schools
Improve and Emphasis on non-formal and adult
education.
Promote reward and punishment system for the
students in the primary schools
IDENTIFIED PROJECTS
2.4 Primary Education Improvement
Plan
• Construction of new school buildings and starting new
•
•
schools and delivery of upgraded education system
including introduction of Basic Computer Courses in
primary and pre-primary schools
Rs 60 Lakhs
Inception of non formal and adult education center/ SSK
centers/ Literacy center/ Library/ other centers including
introduction of Basic Computer Courses in non-formal
adult education centers
Rs 50 Lakhs
TOTAL ALLOCATION FOR DDP PERIOD FROM ALL
SOURCES =
Rs 2 Crores and
27 Lakhs
DEVELOPMENT GOALS
Component 3: Municipal
Institutional Strengthening Plan
3.1 ORGANISATION DEVELOPMENT PLAN
•
Ensure decentralized urban governance and service delivery to play a greater role in the overall institutional
development, policy formulation, financial management and control, and liaisoning with external
agenciesdevelopment process.
•
Strengthen the role of the Ward offices through decentralization of powers and authority to the wards for
providing routine services to citizens, by way of establishing and ensuring active participation of the Ward
Committees to be able to carry out their functions in a more meaningful way.
•
Develop functional ownership of the DDP acrossInvolve all levels of political and administrative leadership in
the course of DDP preparation and implementation to develop a sense of functional ownership
•
Make appropriate changes in the organization structure to provide adequate focus to certain key functions
viz. Grievance Management, Poverty cell (UPE Cell). Capacity building of CDS/NHCs, Ward Committee,
Citizens’ Charter, Standing Committees and Municipal Accounts Committee, Human Resources Management,
Human Resource Policy, Management Information System and Management Control System.
•
Work out eEffective staff restructuring for improved efficiency in the backdrop of the changed and
multiplied demand of urban services
IDENTIFIED PROJECTS
3.1 Organisation Development Plan
• Development of cells for organization strengthening
including permanent deployment of Urban Planner, AFC,
IT-coordinator, etc
Rs 66.07 Lakhs
• Technical and non-technical manpower planning for
effective utilization of existing vacancies in the various
departments of the ULB
Rs 33 Lakhs
• TOTAL ALLOCATION FOR DDP PERIOD FROM
ALL SOURCES = Rs 114.07 Lakhs
DEVELOPMENT GOALS
Component 3: Municipal
Institutional Strengthening Plan
3.2 INTERNAL PROCESSES AND SYSTEMS IMPROVEMENT
PLAN
•
•
•
•
Ensuring internal process and systems are geared for
improved governance and management
Ensuring improved delivery of essential urban services
Smooth and timely delivery of services
Ensure effective and strengthened service delivery by
reengineering the process, which may not lead to
reduction in time but would ensure quality of services
IDENTIFIED PROJECTS
3.2 Internal Processes and Systems
Improvement Plan
• Implementation of computerization, local area
network and other IT support in the ULB
Rs 8
•
Lakhs
Introduction of information systems to improve
access to information
Rs 2.5 Lakhs
• TOTAL ALLOCATION FOR DDP PERIOD FROM
ALL SOURCES = Rs 11 Lakhs
DEVELOPMENT GOALS
Component 3: Municipal
Institutional Strengthening Plan
3.3 CITIZENS INTERFACE PLAN
•
Transfer adequate powers to Ward Committees to collect specific user charges/ fees against services
provided by the WCs within the ambit of the existing rules.
•
Create awareness amongst all citizens with regards to the types of services offered by the ULB, eligibility for
benefits under different schemes, procedures that need to be followed to access such service.
•
Commitment to deliver quality services to citizens in line with Citizen’s charter, by defining the standards of
service offered, and the time frame within which such services would be delivered.
•
Improving accountability and maximizing citizen comfort by putting in place, a suitable mechanism where all
public queries/ complaints are acknowledged, registered and responded in a time bound and professional
manner.
•
Solicit co-operation of all stakeholders’ including citizens, local communities, contractors, employees and
elected representatives and make the beneficiaries an integral part of the micro-level planning process.
IDENTIFIED PROJECTS
3.3 Citizens Interface Plan
• TOTAL ALLOCATION FOR DDP PERIOD
FROM ALL SOURCES = Rs 16.25 Lakhs
• Setting up of grievance redressal cells at every
•
ward office.
Rs 5 Lakhs
Periodic review of citizens’ opinion on the
committed time frames as per citizens’ charter
Rs 3 Lakhs
DEVELOPMENT GOALS
Component 3: Municipal
Institutional Strengthening Plan
3.4 FINANCIAL PLAN
•
To address and focus long term financial planning of utmost
importance to make the municipality, self sufficient independent
and solvent
•
Investigation and justification of cause against an expenditure to
reduce wastage
•
Effective use of limited financial resource
•
Identification of profitable area of resource mobilization for JV
and PPP projects
TOTAL FINANCIAL
ALLOCATION
• Component 1 = Rs 26.2859 Crores
• Component 2 = Rs 7.3694 Crores
• Component 3 = Rs 1.4132 Crores
• TOTAL
= Rs 35.0685 Crores
PUBLIC VALIDATION
• The date of public validation was scheduled on 25.01.07 at evening 5:30
•
•
•
•
•
•
P.M. at Rabindra Bhavan auditorium of Baranagar Municipality. The meeting
was chaired by the Municipal Chairman attended by almost all ward
councilors, CIC members, ward committee secretaries/ members, common
citizen, different stakeholders, municipal staff and high officials and others
It was a grand success and well attended by nearly 350 persons
Advertisement and publicity was made in Bengali daily Ganashakti and
Local TV Cable Networks
Public Validation was open for 1 month from 19th January to 19th February
’07
The DDP Report was kept in a public place however only 2 feedbacks were
received
At the end of the public validation, BOC resolution was made to adopt it on
26th February ’07
The Final DDP has been submitted to KMPC on 27th of February 2007
CONCLUSION
• Limitations in the form of gaps in thematic integration of
•
various proposals and linkages between the proposed
development plan and the overall resource availability.
Gaps are likely to exist in various socio-economic and
infrastructure datasets which have not been entirely
addressed through the various surveys conducted, thus
resulting on a greater emphasis on the use of secondary
data, citizens’ feedback, ward level consultations and
participatory planning as much as possible.
CONCLUSION
The important features, in the process of making the first
generation DDP, include
• Participation by and consultation with the widest range
of stakeholders, Ward Committees, NHG, NHC, CDS, etc.
• Pro-poor focus
• Transparent system for prioritization of issues.
• Realistic and affordable financial projections from
predictable funding schemes.
• Short gestation, cost effective projects with large
number of beneficiaries and community participation.
Monitoring Strategies
•
•
•
•
•
•
•
Identification of monitoring team and the requisite qualification and
elgibility of its members.
Finalisation of periodicity of such monitoring or progress review, viz.
annual review, mid-term review after 3 years or any intermediate and
emergency review.
Monitoring functions like Time and Cost overrun, quality of work,
resource mobilization including human resource.
Finding out Critical Path Method or Periodic Evaluation Review Technique
(PERT-CPM) to come to a feasible solution
IT enabled Project monitoring and management service for a more
objective progress review.
Decision by the DPG in association with respective DTGs to revise the
course of action of the plan implementation process.
And continuing interim review process to keep track on the progress or
delay of work.
THANK YOU