Transcript Document
Freight Operations Information System COM/CCM’s Conference 31.07.2004 1 Overview • FOIS consists of – Rake Management System (RMS) • 233 locations; completed in March 2001 – Terminal Management System (TMS) • 530 locations; 169 commissioned so far • Target December 2004 2 Overview • The scope of the work enlarged to have additional terminals • The likely date of completion of current phase is 31.3.2005 • FOIS Sub-module under sanction – Crew Management System – Control Charting 3 Project Progress • Financial progress • Physical progress 70.4 per cent 81.0 per cent (Rs.crores) • • • • Sanctioned Estimate Expenditure up to March 04 Budget Estimate 2004-05 Expenditure April – June 04 426 298 40 2 4 FOIS Implementation • Phase 1 – Goods train movement in terms of rakes (RMS) • Phase 2 – Train operation information in terms of wagons (WMS) • Phase 3 – TMS capturing all commercial information relating to goods traffic from booking to delivery • Successful implementation of WMS is a prerequisite for TMS 5 TMS Implementation Strategy • Transitional Phase – Computerisation of 530 goods sheds/sidings – Target December 2004 – Likely to be completed by March 2005 • Fully computerised phase – Capturing information of all the goods sheds on IR – Target March 2006 6 Procurement of Equipment • Terminal Sub-system – Remaining supply will be completed within two months • Datacom Equipment – Routers and modems are being procured by CRIS – supply to commence from 15th Aug 2004 • VSATs are being procured by Railtel – Installation will begin from October 2004 at a rate of 50 VSATs per month 7 Electronic Mode of Payment • Pilot project between coal loading points on ER & ECR and Badarpur Thermal Power Plant(BTPP). • TMS already commissioned at 5 locations on ECR & ER catering to 19 sidings. BTPP under commissioning. • JPO under issue from Railway Board. • Interface between TMS and Bank software under development. 8 Assistance from Railways • Site preparation should be completed latest by October 2004 – Special precautions at the VSAT locations • Monitoring of telecom network • A proper account of PCs, UPSs and other equipment is important – Non-functioning of UPSs at many locations is a cause of concern 9 Enforcement of Data Entry Discipline • Wagons – Machine generated wagon consists should be accurate – Procedure for reporting wagon consists from non-device location • Locomotives – Allocate correct domain and service – Ensure updating of status at midnight 10 Review of TMS Locations • Review of TMS terminals should be finalised based on current and future traffic trends • Early response will help in finalising the requirement of equipment and arranging the same • Review completed by some Railways 11 Engagement of Local Implementers • Local teams for speedy implementation • Contractual short term agreement for the transitional phase • Will be trained in CRIS and deployed in the field • Identify retired senior supervisors and forward applications to CRIS/CAO (FOIS) 12 Assistance from Board • Sanction for the revised estimate for Rs. 431 crores is pending • Includes the estimate for Control Charting and Crew Management • Saving in establishment expenditure envisaged (up to Rs 20 crores) if the submodules are developed simultaneously 13 JPO for TMS Implementation • Modify commercial rules for new procedures • Major modifications – Issue of computerised RR & its electronic transmission – Rules for diversion and liquidating traffic suspense – Verification of data bases provided and system of updating the same – Procedure for handling traffic from non-device locations (Nodal station concept) 14 Statistical Statements • FOIS is capable of – Generating commodity head wise statistical statements (7A, 7B, 7C) – Apportionment of goods earnings – Origin Destination Analysis, and – Other statistical statements relating to goods traffic 15 Extension of Network • Rates Directorate of Railway Board – For owning and maintaining the data bases • Rates branches of zonal HQs – For maintaining the data bases at the Railway level • Claims offices • Traffic Accounts offices,Cash offices and EDP centers 16 Tasks Ahead • Need for Integration with COIS • Future Sub-modules of FOIS – – – – Locomotive Management System Revenue Accountal System Wagon Repair Management System Fuel Management System 17 Thank You 18