Transcript Slide 1

Caltrain Modernization
CMAA
September 18, 2014
Caltrain Today
2
Key Facts
• Diesel commuter rail system
• SF to SJ area
• 77 mile corridor, 32 stations
• 92 trains / weekday
• Ridership: ~ 55,000+ weekday
3
Caltrain Ridership
Note: Bike Ridership 11 % increase (FY14)
4
2014 Top Ridership Trains
Note: February 2014 counts (lower ridership season)
5
Caltrain Modernization
6
Advanced
Signal System (2015)
7
Project Description
• Communications Based Overlay Signal
System (CBOSS) Positive Train Control (PTC)
• Fiber Optic Network
• Project Requirements
‒ Includes federal mandate (PTC)
‒ Improves Caltrain performance
• Project Partners
‒ FRA, UP, CHSRA, JPB
8
Project Total Cost and Milestones
Cost
(in millions)
Milestones
Project Planning and
Procurement
$5
2010 - 2011
Phase 1 - Critical Design
$25
2012 – 2013
Phase 2 - Final Design, Data
Communications Subsystem &
Fiber Backbone Installation
$51
2013 – 2014
Description
Phase 3/4 - Installation, Testing,
Commissioning
Total
2014 – 2016
$150
(Revenue service
Oct. 2015)
$231
9
Peninsula Corridor
Electrification Project (2019)
10
PCEP Project Description*
Area
51+ miles
Project
Service
Electrification:
Up to 79 mph
•
Service Increase
Overhead Contact
System (OCS)
San Francisco
to San Jose
• Traction Power
(Tamien Station)
Facilities
Electric Multiple
Units (EMUs)
•
6 trains / hour / direction
•
More station stops / reduced travel
time
•
Restore Atherton & Broadway
service
Mixed-fleet service (interim period)
Cont. tenant service
*Proposed project not yet approved, pending environmental clearance
8
Key Milestones*
Activity
2013 2014 2015 2016 2017 2018 2019
Stakeholder Outreach
Establish Owner’s Team
Environmental Clearance
Procure/Select Contractor Team
Design/Manufacture/Build
*Schedule subject to change
12
Funding Plan
Funding Source
Electrification
EMUs
JPB Members
31
94
JPB (prior funding)
11
State Prop 1B
5
Prop 1A HSR
600
FTA (prior funding)
16
FTA (future)
122
315
Bridge Tolls
11
BAAQMD Carl Moyer
20
Total Funding
$785M
$440M
Note: 2009 cost estimate
13
Key Regional Benefits
14
High-Speed Rail
Partnership
15
Blended System Vision
Community-driven Approach
2-track System (Primarily)
Up to 110 mph
Partially Grade Separated
6 Caltrains / peak hour per direction
Up to 4 HSR trains / peak hour per direction*
*Based on LTK computer model simulation (March 2012)
16
Incremental Investments
State of Good Repair &
Reliability/Capacity Improvements
CalMod Program
CBOSS PTC 2015
Corridor Electrification 2019
Downtown Extension
(led by TJPA)
Additional HSR
Improvements
Additional Caltrain
Improvements
HSR Stations
Passing Tracks
Maintenance Facility
System Upgrades (110mph)
Longer Trains/ Platforms
Level Boarding
Note: Orange has no funding plan; Green has funding plan
17
Q/A
18