Transcript Slide 1
San Francisco Mayor’s 2030 Transportation Task Force Current & Near Term Transportation Plans April 30, 2013 Presentation Outline • • • • • • Joint Powers Agreement Historical Revenues and Ridership State of Good Repair Capital Funding Source San Francisco Projects Caltrain Modernization 2 Joint Powers Agreement • • • • • 3 Member Agencies: City and County of San Francisco (CCSF), SamTrans, and VTA Operating based on boarding formula Capital split 3 ways FY2014 Operating budget balanced FY2014 Capital budget under discussion 3 Caltrain Service Caltrain service is in demand more than ever before • Historic ridership • More than half take Caltrain to avoid traffic • Historic-level revenues • Farebox recovery ratios: • FY2013 YTD (Jun – Mar) = 61.60% • FY2014 Projection = 54.84% • Capacity problems/Over crowded 4 Revenues & Ridership $66.07 30 $64.78 $58.89 $60 25 Millions Millions $70 $49.03 $50 $43.27 20 $42.73 $40.13 $40 $34.84 $30.38 15.25 15.25 15 14.13 $30 $23.04 $19.26 $20 9.45 10.15 10.98 11.96 12.69 11.97 12.67 10 8.09 5 $10 $0 0 FY2004 FY2005 FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013 FY2014 Projected Ridership Preliminary Revenue 5 Caltrain State of Good Repair • Ongoing station, track, structures, signal and rolling stock needs • Limited Federal Transit Administration (FTA) and local funds to cover maintenance of the existing system • Deferred maintenance due to limited funding for prior years 6 5 year State of Good Repair Needs ($ millions) Signal & Systems, $27.0 Rolling Stock, $75.1 2 Bridges Rehab, $54.3 Track & Stations, $67.5 Total SOGR needs1: $223.9 million → $71.8 million in FTA funds 1 2 represents projected needs 2014 to 2018, from Countywide Transportation Plan Nov. 2012 local share of Rolling Stock needs is approximately $70 million 7 Capital Funding by Source 250 200 millions 150 100 50 0 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013 Members 5.00 9.50 12.25 16.60 13.70 8.20 11.63 Other 58.80 31.65 28.10 86.30 1.00 3.45 1.37 State 5.30 4.00 67.20 58.00 7.30 8.29 6.79 Federal 38.80 17.50 28.30 45.00 17.30 41.54 19.30 8 Caltrain Modernization (Electrification) • Distance: 51 miles (4th & King to Tamien) • Speed: Up to 79mph • Service: 6 trains per peak hour per direction • Infrastructure/Vehicles – Poles and Wires (OCS) – Traction Power Facilities (TPF) – Electric Powered Vehicle/Electric Multiple Units (EMU) 9 Caltrain Modernization • Blended System • Concept – Electrify / Upgrade railroad as an early investment in High Speed Rail – Maximize use of existing tracks – Caltrain and HSR on shared tracks – Support freight and other passenger services • Key Benefits – Minimize community impact – Lower project cost – Advance project delivery 10 Early Investment Program Sources of Funds (in millions): • • • • Local - JPB (1) State - Prop 1 A & 1B Federal - FTA Regional - BAQMD, Tolls Total $ 195 730 500 31 $1,456 CBOSS/Positive Train Control Electrification 96 EMU (railcars) Total $ 231 785 440 $1,456 Uses of Funds • • • Note: (1) Member Agency Contributions consist of: $60M from San Mateo and Santa Clara, $20M from San Francisco ($40M TBD) ($180M Total), $11M from currently available balance, and $4M from Caltrain PTC. 11 EMUs (Electric Multiple Units) Trainset Characteristics • • • • • • Typically 6-cars per trainset Operating speed up to 79 mph 100 seats per EMU 96 EMUs 16 Train Sets 9,600 seats 12 QUESTIONS 13