Transcript Slide 1
GUJARAT: HOUSING FOR ALL GUJARAT INITIATIVES 1 KEY INITIATIVES CAMPAIGN FOR HOMESTEADS EARTHQUAKE RESISTANT HOUSING DESIGN INTEGRATED PLANNING OF CENTRAL & STATE SCHEMES TO ENSURE COVERAGE CAMPAIGN FOR DRI LOANS HOUSE ALLOTMENT IN NAME OF WOMEN, ENSURING NAME IN RECORD OF RIGHTS 2 CAMPAIGN FOR HOMESTEADS SURVEY OF RURAL HOUSEHOLDS 2002 INDICATED 8.08 LAKH FAMILIES REQUIRED HOUSING PERMANENT WAITLIST BASED ON SURVEY COMPRISED 2.94 LAKH HOUSELESS & 5.15 LAKH HAVING KUTCHA HOUSES HOMESTEAD PLOTS WERE ALLOCATED PROGRESSIVELY 2010 STATE GOLDEN JUBILEE YEAR RESOLUTION THAT NO BPL FAMILY SHOULD REMAIN SHELTERLESS BY DECEMBER 2010 3 CAMPAIGN FOR HOMESTEADS: ISSUES OUT OF 2.94 LAKH HOUSELESS FAMILIES 2.03 LAKH DID NOT HAVE HOUSE PLOTS FAMILIES WERE SCATTERED IN OVER 3500 VILLAGES MULTIPLICITY OF AGENCIES PROPOSALS FOR VILLAGE SITE EXTENSIONS BY PANCHAYATS ASSIGNATION OF GOVT LAND FOR VILLAGE SITES BY REVENUE DEPT. SANCTION OF INDIVIDUAL HOUSE SITES BY PANCHAYAT LAND COMMITTEE 4 CAMPAIGN FOR HOMESTEADS JOINT LAUNCH BY MINISTERS RDD & REVENUE TIME BOUND ACTION PLAN TO COLLECTORS & DDO’S WEEKLY STATE LEVEL REVIEW BY PS REVENUE, PANCHAYAT DISTRICT LEVEL DAILY MONITORING BY COLLR & DDO PROPOSALS SUBMITTED PROPOSALS SANCTIONED LAND MEASUREMENT AND TRANSFER TO PRIS PRIVATE SURVEYORS AND ENGINEERS FOR MEASUREMENT AND LAYOUT 5 CAMPAIGN FOR HOMESTEADS TALUKA LEVEL ACTION PLAN VERIFICATION OF BENEFICIARIES VILLAGE WISE IDENTIFICATION OF SUITABLE GOVT LAND IN VILLAGES MIDDLE LEVEL TALUKA EMPLOYEE TO SUPPORT GP SECRETARY EACH TALUKA PLACED UNDER OVERALL CHARGE OF CLASS- I OFFICER 6 CAMPAIGN FOR HOMESTEADS YEAR No. of plots allotted 2006-07 2007-08 2008-09 23923 51573 58561 2009-10 61400 2010- 11 3480 Total 198937 7 CAMPAIGN FOR HOMESTEADS ENSURING HOUSES ON ALL HOMESTEADS AUGUST 2009, LAUNCH OF HOMESTEAD SCHEME BY GOI NOVEMBER 2009 PROPOSAL FOR 33154 INCENTIVE AWAS SUBMITTED BY GOG AGAINST HOMESTEADS ALLOTTED AFTER AUGUST 2009 SANCTION RECEIVED MARCH 2010 JUNE 2010 PROPOSAL FOR 18342 INCENTIVE AWAS AGAINST HOMESTEADS ALLOTTED UPTO MARCH 2010 TOTAL 51496 AWAS WITH TOTAL ALLOCATION OF RS.231.73 CRORES RECEIVED AS INCENTIVE 8 EARTHQUAKE RESISTANT AWAS Seismic Zoning Map of Gujarat LARGE AREAS OF GUJARAT ARE IN SEISMIC ZONE 4 AND 5 9 EARTHQUAKE RESISTANT AWAS POST EARTHQUAKE, 2001 NATIONAL BUILDING CODES FOR THE COUNTRY REVISED GUJARAT STATE DISASTER MANAGEMENT AUTHORITY & DEPTT. OF R & B PREPARED EARTHQUAKE RESISTANT DESIGN AND GUIDELINES FOR BPL HOUSING SCHEMES MASS TRAINING FOR EARTHQUAKE RESISTANT CONSTRUCTION TO MASONS, ENGINEERS & BUILDERS ACROSS THE STATE 10 EARTHQUAKE RESISTANT DESIGN 10 cm RCC COPPING BAND AT PLINTH & LINTEL LEVEL COVERING ALL WALLS FOUNDATION DEPTH MINIMUM 90 cm. THE MS BAR IS REQU AFTER EVERY 4 LAYERS OF BRICK MASONRY 75 cm WIDE BRICKBAT CONCRETE AT BOTTOM OF FOUNDATION THICKNESS OF WALL AT THE BOTTOM OF FOUNDATION 45 cm & REDUCED IN TWO STEPS TO 23 cm 11 EARTHQUAKE RESISTANT DESIGN 'U' shaped reinforce ment Min. 8mm ø 90 cm 90 cm Masonry Long Bar WINDOWS AND DOORS NOT PLACED AT CORNERS. MINIMUM DISTANCE FROM ANY JUNCTION 30 – 60 C.M. Steel bars 1:3 Cement Concrete Mortar 'T' section details of Reinforcement at sill level in wall Window Mortar = Mixture of Cement & Sand THE MS BAR IS REQU AFTER EVERY 4 LAYERS OF BRICK MASONRY AT WALL JUNCTIONS PLACED VERTICALLY FROM COPPING BAND AT PLINTH LEVEL UP TO SLAB LEVEL IN BETWEEN LAYERS OF BRICK MASONRY AT INTERVAL OF 4 LAYERS AT THE BOTTOM OF WINDOWS 90 C.M. LONG U SHAPED STEEL BARS 12 DETAILS OF EARTHQUAKE RESISTANT DESIGN AND COSTING FOR ALL 3 SEISMIC ZONES Seismic Zone Cost of Construction Rs Zone - 3 82107 Zone - 4 84760 Zone - 5 85884 13 EARTHQUAKE RESISTANT AWAS RECOMMENDATION DEVELOPMENT OF LOW COST, REGION SPECIFIC DESIGNS FOR NATURAL CALAMITY RESISTANT HOUSES BY CENTRAL AGENCIES DIFFERENTIAL FUNDING OF IAY HOUSING IN EARTHQUAKE PRONE AREA COMMENSURATE WITH NATIONAL BUILDING CODE MANDATING NATIONALISED BANKS TO PROVIDE DRI ASSISTANCE EQUIVALENT TO FUNDING GAP TO ALL BPL HOUSING BENEFICIARIES 14 INTEGRATED PLANNING OF CENTRAL & STATE SCHEMES UPTIL 2009-10 GoG HAD TOTAL OF 11 HOUSING SCHEMES FOR POOR UNDER IMPLEMENTATION SEPARATE ELIGIBILITY CRITIERIA AND DIVERGENT FUNDING PATTERNS IN 2009-10 ALL HOUSING SCHEMES CLUBBED UNDER COMMON GR ALL SCHEMES ALIGNED WITH IAY FUNDING ASSISTANCE ELIGIBLITY BASED ON BPL LIST COMMON HOUSING DESIGN INFRASTRUCTURE SUPPORT FOR ALL CLUSTERS OF 10 AND MORE HOUSES 15 Houses Constructed under IAY 200,000 177,586 166,760 180,000 160,000 140,000 120,000 106,413 96,258 100,000 80,000 65,602 65,195 60,000 40,000 20,000 0 27,053 31,199 33,654 Year Houses Constructed 2002-03 27,053 2003-04 31,199 2004-05 33,654 2005-06 65,602 2006-07 65,195 2007-08 96,258 2008-09 1,06,413 2009-10 1,66,760 2010-11 1,77,586 Total 7,69,720 16 TOTAL HOUSES BUILT DURING 2006-07 TO 2010-11 SR. No 1 SCHEME HOUSES BUILT DURING 200607 TO 2009-10 TARGET IN 2010-11 TOTAL AWAS 434626 177586 612212 INDIRA AWAS YOJANA STATE SCHEMES 2 SARDAR AWAS YOJANA 104286 28855 133141 3 PANDIT DINDAYAL UPADHDHYAY AWAS YOJANA 84312 16000 100312 4 Dr. AMBEDKAR AWAS YOJANA (S.C.) 38548 NA 38548 5 INDIVIDUAL AWAS YOJANA FOR S.T. 9813 4065 13878 6 AWAS FOR PRIMITIVE TRIBES 1987 178 2165 7 HALPATI GRIH NIRMAN YOJANA 544 128 672 TOTAL…… 17 674116 226812 900928 CAMPAIGN FOR DRI LOAN TILL 2009-10, NEGLIGIBLE ACHIEVEMENT (511) ISSUE FLAGGED AT SLBC TO ACHIEVE GOAL SET BY RBI AND GOI SLBC APPROVED SIMPLE COMMON APPLICATION FORM FOR ALL BANKS IAY SANCTION ORDER ISSUED WITH DRI LOAN APPLICATION FORM AND EARTHQUAKE RESISTANT DESIGNS TO ALL BENEFICIARIES ASSISTANCE OF DRDA STAFF TO FILL UP DRI FORMS BRANCH WISE REVIEW IN TLCC / BLBC & BANK WISE REVIEW IN DLCC / SLBC AIM TO SPONSOR & SANCTION 1 LAKH APPLICATIONS IN 2010-11 18 CAMPAIGN FOR DRI LOAN RECOMMENDATION: DRI SCHEME EXTENDED ONLY TO IAY BENEFICIARIES STATE GOVERNMENTS HAVE HOUSING SCHEMES FOR RURAL POOR.ALL SUCH SCHEMES MUST HAVE ACCESS TO DRI LOANS QUANTUM OF IAY ASSISTANCE PLUS LOAN OF RS 20000 INADEQUATE FOR CONSTRUCTION AS PER NBC GOI GUIDELINES TO BANKS ON DRI SHOULD BE MANDATORY NOT ADVISORY 19 ALLOTMENT TO WOMEN GoG MANDATES ALLOTMENT OF HOUSES UNDER ALL GOVERNMENT HOUSING SCHEMES IN NAME OF WOMEN UNDER IAY - SANCTION & PAYMENTS IN THE NAME OF WOMEN.ACHIEVEMENT DURING 2009-10 (Women 82.57 %) (Joint 15.48%), ( Men 1.95%) ENSURED NAME OF WOMAN ALSO ENTERED IN LAND TITLE RECORDS AND PANCHAYAT RECORDS 20 Formulating Action Plan for 2011-12 to 2016-17 21 DISTRICT WISE ESTIMATE OF UNMET DEMAND Sr. No. Name of District No. of kutcha house without plot On verification kutcha house 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 AHMEDABAD AMRELI ANAND BANAS KANTHA BHARUCH BHAVNAGAR DANG DAHOD GANDHINAGAR JAMNAGAR JUNAGADH KHEDA KUTCHCHH MEHSANA NARMADA NAVSARI PANCH MAHALS PATAN PORBANDAR RAJKOT SABAR KANTHA SURAT SURENDRANAGAR VADODARA VALSAD 42050 14503 43135 44041 36863 12468 7182 15015 6238 9061 11678 28954 12947 22915 23679 7097 19746 15275 2532 16384 20829 26141 33903 38711 20673 2582 403 28353 22306 9552 76 TOTAL 532020 142675 0 0 0 0 1161 0 43833 4784 25918 3707 22 FORMULATING ACTION PLAN 2011-12 TO 2016-17 NEW HOUSEHOLD SURVEY DUE 2011, LIKELY AVAILABILITY 2012 CENSUS 2011 HOUSEHOLD SURVEY ALREADY AVAILABLE THROUGHOUT COUNTRY - SHOULD FORM BASIS FOR ACTION PLAN CENSUS DATA TO BE OBTAINED BY NOVEMBER 2010 REQUIREMENT FOR HOUSING IN STATES ESTIMATED BY DECEMBER 2010 DECEMBER & JANUARY PREPARATION OF WAITLIST FOR HOUSING ASSISTANCE ACTION PLAN FOR YEARWISE ALLOCATION OF IAY HOUSES BY JANUARY 2011 23 ISSUES TO BE CONSIDERED IAY MUST BE DE-COUPLED FROM BPL LIST ELIGIBILITY CRITERIA AND QUANTUM OF ASSISTANCE BY GOI REQUIRES TO BE REVIEWED. PRESENT QUANTUM OF ASSISTANCE FOR UNIT SIZE OF 20 SQ. MTS. VERY LOW. SIZE OF DWELLING UNIT NEEDS TO BE ENHANCED TO 30 SQ. MTS. FOR BETTER HEALTH, HYGIENE & DIFFERENTIAL CULTURAL TRADITIONS PROVIDING DRI LOAN MUST BECOME MANDATORY FOR BANKS. AS THE SCOPE OF HOUSING IS BEING ENLARGED, ASSISTANCE TO STATES FOR ADMINISTRATIVE SET UP 24 REQUIRES TO BE ADDRESSED Thank You 25