Transcript Slide 1

GUJARAT:
HOUSING FOR ALL
GUJARAT
INITIATIVES
1
KEY INITIATIVES
CAMPAIGN FOR HOMESTEADS
EARTHQUAKE RESISTANT HOUSING DESIGN
INTEGRATED PLANNING OF CENTRAL &
STATE SCHEMES TO ENSURE COVERAGE
CAMPAIGN FOR DRI LOANS
HOUSE ALLOTMENT IN NAME OF WOMEN,
ENSURING NAME IN RECORD OF RIGHTS
2
CAMPAIGN FOR HOMESTEADS
SURVEY OF RURAL HOUSEHOLDS 2002
INDICATED 8.08 LAKH FAMILIES REQUIRED
HOUSING
PERMANENT WAITLIST BASED ON SURVEY
COMPRISED 2.94 LAKH HOUSELESS & 5.15
LAKH HAVING KUTCHA HOUSES
HOMESTEAD PLOTS WERE ALLOCATED
PROGRESSIVELY
2010 STATE GOLDEN JUBILEE YEAR
RESOLUTION THAT NO BPL FAMILY SHOULD
REMAIN SHELTERLESS BY DECEMBER 2010
3
CAMPAIGN FOR
HOMESTEADS: ISSUES
OUT OF 2.94 LAKH HOUSELESS FAMILIES 2.03 LAKH
DID NOT HAVE HOUSE PLOTS
FAMILIES WERE SCATTERED IN OVER 3500 VILLAGES
MULTIPLICITY OF AGENCIES
PROPOSALS FOR VILLAGE SITE EXTENSIONS BY
PANCHAYATS
ASSIGNATION OF GOVT LAND FOR VILLAGE SITES
BY REVENUE DEPT.
SANCTION OF INDIVIDUAL HOUSE SITES BY
PANCHAYAT LAND COMMITTEE
4
CAMPAIGN FOR HOMESTEADS
JOINT LAUNCH BY MINISTERS RDD & REVENUE
TIME BOUND ACTION PLAN TO COLLECTORS & DDO’S
WEEKLY STATE LEVEL REVIEW BY PS REVENUE,
PANCHAYAT
DISTRICT LEVEL DAILY MONITORING BY COLLR & DDO
 PROPOSALS SUBMITTED
 PROPOSALS SANCTIONED
 LAND MEASUREMENT AND TRANSFER TO PRIS
 PRIVATE SURVEYORS AND ENGINEERS FOR
MEASUREMENT AND LAYOUT
5
CAMPAIGN FOR HOMESTEADS
TALUKA LEVEL ACTION PLAN
VERIFICATION OF BENEFICIARIES VILLAGE WISE
IDENTIFICATION OF SUITABLE GOVT LAND IN VILLAGES
MIDDLE LEVEL TALUKA EMPLOYEE TO SUPPORT GP
SECRETARY
EACH TALUKA PLACED UNDER OVERALL CHARGE OF
CLASS- I OFFICER
6
CAMPAIGN FOR HOMESTEADS
YEAR
No. of plots allotted
2006-07
2007-08
2008-09
23923
51573
58561
2009-10
61400
2010- 11
3480
Total
198937
7
CAMPAIGN FOR HOMESTEADS
ENSURING HOUSES ON ALL HOMESTEADS
AUGUST 2009, LAUNCH OF HOMESTEAD SCHEME BY
GOI
NOVEMBER 2009 PROPOSAL FOR 33154 INCENTIVE
AWAS SUBMITTED BY GOG AGAINST HOMESTEADS
ALLOTTED AFTER AUGUST 2009
SANCTION RECEIVED MARCH 2010
JUNE 2010 PROPOSAL FOR 18342 INCENTIVE AWAS
AGAINST HOMESTEADS ALLOTTED UPTO MARCH 2010
TOTAL 51496 AWAS WITH TOTAL ALLOCATION OF
RS.231.73 CRORES RECEIVED AS INCENTIVE
8
EARTHQUAKE RESISTANT AWAS
Seismic Zoning Map of Gujarat
LARGE AREAS OF GUJARAT ARE
IN SEISMIC ZONE 4 AND 5
9
EARTHQUAKE RESISTANT AWAS
POST EARTHQUAKE, 2001 NATIONAL BUILDING
CODES FOR THE COUNTRY REVISED
GUJARAT STATE DISASTER MANAGEMENT
AUTHORITY & DEPTT. OF R & B PREPARED
EARTHQUAKE RESISTANT DESIGN AND GUIDELINES
FOR BPL HOUSING SCHEMES
MASS TRAINING FOR EARTHQUAKE RESISTANT
CONSTRUCTION TO MASONS, ENGINEERS &
BUILDERS ACROSS THE STATE
10
EARTHQUAKE RESISTANT DESIGN
10 cm RCC COPPING BAND AT
PLINTH & LINTEL LEVEL
COVERING ALL WALLS
FOUNDATION DEPTH MINIMUM 90 cm.
THE MS BAR IS REQU AFTER EVERY 4 LAYERS OF
BRICK MASONRY
 75 cm WIDE BRICKBAT CONCRETE AT BOTTOM OF FOUNDATION
 THICKNESS OF WALL AT THE BOTTOM OF FOUNDATION 45 cm &
REDUCED IN TWO STEPS TO 23 cm
11
EARTHQUAKE RESISTANT DESIGN
'U' shaped
reinforce
ment
Min. 8mm
ø
90
cm
90
cm
Masonry
Long Bar
WINDOWS AND DOORS NOT PLACED AT
CORNERS. MINIMUM DISTANCE FROM
ANY JUNCTION 30 – 60 C.M.
Steel bars
1:3
Cement
Concrete
Mortar
'T' section details of
Reinforcement at sill level in
wall
Window
Mortar = Mixture of
Cement
& Sand
THE MS
BAR IS REQU AFTER EVERY 4 LAYERS OF
BRICK MASONRY
AT WALL JUNCTIONS PLACED VERTICALLY FROM COPPING BAND AT PLINTH
LEVEL UP TO SLAB LEVEL

IN BETWEEN LAYERS OF BRICK MASONRY AT INTERVAL OF 4 LAYERS
 AT THE BOTTOM OF WINDOWS 90 C.M. LONG U SHAPED STEEL BARS
12
DETAILS OF EARTHQUAKE RESISTANT DESIGN
AND COSTING FOR ALL 3 SEISMIC ZONES
Seismic Zone
Cost of Construction
Rs
Zone - 3
82107
Zone - 4
84760
Zone - 5
85884
13
EARTHQUAKE RESISTANT AWAS
RECOMMENDATION
 DEVELOPMENT OF LOW COST, REGION SPECIFIC
DESIGNS FOR NATURAL CALAMITY RESISTANT HOUSES
BY CENTRAL AGENCIES
DIFFERENTIAL FUNDING OF IAY HOUSING IN
EARTHQUAKE PRONE AREA COMMENSURATE WITH
NATIONAL BUILDING CODE
MANDATING NATIONALISED BANKS TO PROVIDE DRI
ASSISTANCE EQUIVALENT TO FUNDING GAP TO ALL
BPL HOUSING BENEFICIARIES
14
INTEGRATED PLANNING OF
CENTRAL & STATE SCHEMES
UPTIL 2009-10 GoG HAD TOTAL OF 11 HOUSING
SCHEMES FOR POOR UNDER IMPLEMENTATION
SEPARATE ELIGIBILITY CRITIERIA AND DIVERGENT
FUNDING PATTERNS
IN 2009-10 ALL HOUSING SCHEMES CLUBBED
UNDER COMMON GR
ALL SCHEMES ALIGNED WITH IAY FUNDING ASSISTANCE
ELIGIBLITY BASED ON BPL LIST
COMMON HOUSING DESIGN
 INFRASTRUCTURE SUPPORT FOR ALL CLUSTERS OF 10
AND MORE HOUSES
15
Houses Constructed under IAY
200,000
177,586
166,760
180,000
160,000
140,000
120,000
106,413
96,258
100,000
80,000
65,602 65,195
60,000
40,000
20,000
0
27,053
31,199 33,654
Year
Houses
Constructed
2002-03
27,053
2003-04
31,199
2004-05
33,654
2005-06
65,602
2006-07
65,195
2007-08
96,258
2008-09
1,06,413
2009-10
1,66,760
2010-11
1,77,586
Total
7,69,720
16
TOTAL HOUSES BUILT DURING 2006-07 TO 2010-11
SR.
No
1
SCHEME
HOUSES BUILT
DURING 200607 TO 2009-10
TARGET
IN 2010-11
TOTAL AWAS
434626
177586
612212
INDIRA AWAS YOJANA
STATE SCHEMES
2
SARDAR AWAS YOJANA
104286
28855
133141
3
PANDIT DINDAYAL UPADHDHYAY AWAS YOJANA
84312
16000
100312
4
Dr. AMBEDKAR AWAS YOJANA (S.C.)
38548
NA
38548
5
INDIVIDUAL AWAS YOJANA FOR S.T.
9813
4065
13878
6
AWAS FOR PRIMITIVE TRIBES
1987
178
2165
7
HALPATI GRIH NIRMAN YOJANA
544
128
672
TOTAL……
17
674116
226812
900928
CAMPAIGN FOR DRI LOAN
TILL 2009-10, NEGLIGIBLE ACHIEVEMENT (511)
ISSUE FLAGGED AT SLBC TO ACHIEVE GOAL SET BY RBI AND GOI
SLBC APPROVED SIMPLE COMMON APPLICATION FORM FOR ALL
BANKS
IAY SANCTION ORDER ISSUED WITH DRI LOAN APPLICATION
FORM AND EARTHQUAKE RESISTANT DESIGNS TO ALL BENEFICIARIES
ASSISTANCE OF DRDA STAFF TO FILL UP DRI FORMS
BRANCH WISE REVIEW IN TLCC / BLBC & BANK WISE REVIEW IN
DLCC / SLBC
AIM TO SPONSOR & SANCTION 1 LAKH APPLICATIONS IN 2010-11
18
CAMPAIGN FOR DRI LOAN
RECOMMENDATION:
DRI SCHEME EXTENDED ONLY TO IAY BENEFICIARIES
STATE GOVERNMENTS HAVE HOUSING SCHEMES FOR
RURAL POOR.ALL SUCH SCHEMES MUST HAVE ACCESS
TO DRI LOANS
QUANTUM OF IAY ASSISTANCE PLUS LOAN OF RS
20000 INADEQUATE FOR CONSTRUCTION AS PER NBC
GOI GUIDELINES TO BANKS ON DRI SHOULD BE
MANDATORY NOT ADVISORY
19
ALLOTMENT TO WOMEN
GoG MANDATES ALLOTMENT OF HOUSES UNDER
ALL GOVERNMENT HOUSING SCHEMES IN NAME OF
WOMEN
UNDER IAY - SANCTION & PAYMENTS IN THE NAME
OF WOMEN.ACHIEVEMENT DURING 2009-10
(Women 82.57 %) (Joint 15.48%), ( Men 1.95%)
ENSURED NAME OF WOMAN ALSO ENTERED IN
LAND TITLE RECORDS AND PANCHAYAT RECORDS
20
Formulating Action Plan for
2011-12 to 2016-17
21
DISTRICT WISE ESTIMATE OF UNMET DEMAND
Sr.
No.
Name of District
No. of kutcha house
without plot
On verification kutcha
house
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
AHMEDABAD
AMRELI
ANAND
BANAS KANTHA
BHARUCH
BHAVNAGAR
DANG
DAHOD
GANDHINAGAR
JAMNAGAR
JUNAGADH
KHEDA
KUTCHCHH
MEHSANA
NARMADA
NAVSARI
PANCH MAHALS
PATAN
PORBANDAR
RAJKOT
SABAR KANTHA
SURAT
SURENDRANAGAR
VADODARA
VALSAD
42050
14503
43135
44041
36863
12468
7182
15015
6238
9061
11678
28954
12947
22915
23679
7097
19746
15275
2532
16384
20829
26141
33903
38711
20673
2582
403
28353
22306
9552
76
TOTAL
532020
142675
0
0
0
0
1161
0
43833
4784
25918
3707
22
FORMULATING ACTION PLAN
2011-12 TO 2016-17
NEW HOUSEHOLD SURVEY DUE 2011,
LIKELY AVAILABILITY 2012
 CENSUS 2011 HOUSEHOLD SURVEY ALREADY AVAILABLE
THROUGHOUT COUNTRY - SHOULD FORM BASIS FOR
ACTION PLAN
 CENSUS DATA TO BE OBTAINED BY NOVEMBER 2010
 REQUIREMENT FOR HOUSING IN STATES ESTIMATED BY
DECEMBER 2010
 DECEMBER & JANUARY PREPARATION OF WAITLIST FOR
HOUSING ASSISTANCE
ACTION PLAN FOR YEARWISE ALLOCATION OF IAY HOUSES BY
JANUARY 2011
23
ISSUES TO BE CONSIDERED
 IAY MUST BE DE-COUPLED FROM BPL LIST
 ELIGIBILITY CRITERIA AND QUANTUM OF ASSISTANCE BY
GOI REQUIRES TO BE REVIEWED. PRESENT QUANTUM OF
ASSISTANCE FOR UNIT SIZE OF 20 SQ. MTS. VERY LOW.
 SIZE OF DWELLING UNIT NEEDS TO BE ENHANCED TO 30
SQ. MTS. FOR BETTER HEALTH, HYGIENE & DIFFERENTIAL
CULTURAL TRADITIONS
PROVIDING DRI LOAN MUST BECOME MANDATORY FOR
BANKS.
AS THE SCOPE OF HOUSING IS BEING ENLARGED,
ASSISTANCE TO STATES FOR ADMINISTRATIVE SET UP
24
REQUIRES TO BE ADDRESSED
Thank You
25