Content
• The role of JI in the national CC strategy
• JI framework in Bulgaria
• Overview of JI projects
• Plans concerning JI in Bulgaria
• Planned activities to meet the eligibility
requirements for JI Track I
• Host Country view on JI Track I
• The impact of the Linking directive
The role of JI in the national
strategy
• Meeting the Kyoto Target surplus
• Second National Action Plan on
Climate Change
EU ETS
Joint Implementation
Management of AAUs – Green Investment
Scheme
JI framework in Bulgaria
• Designated focal point for approving
of JI projects – MoEW
• National guidelines and procedures in
place
• 5 MoU signed, 12 projects approved
Approved JI Projects
PROJECT
ERUs
AAUs
1 140 000
-
553 091
203 208
319 294
-
732 133
-
530 688
126 705
6. Co-generation power station Biovet
339 000
200 000
7. Plovdiv South co-generation project
698 941
242 615
1. Vacha Cascade JI Project
2.
Industrial energy efficiency and cogeneration, Nikopol
Reduction of greenhouse gas by
3. gasification of the towns Veliko Turnovo,
Gorna Oryahovitsa and Lyaskovets
Reduction of greenhouse gas by
4.
gasification of the municipality of Sofia
5.
Biomass and Energy Efficiency Project,
Paper Factory – Stambolijski
Approved JI Projects, cont.
PROJECT
ERUs
AAUs
8.
Biomass Utilization in Svilosa AD
586 000
311 293
9.
Rehabilitation of district heating
system in Toplofikatsia Sofia EAD
and Toplofikatsia Pernik ЕAD
911 469
628 247
10.
Agroplychim N2O reduction
2 015 000
1 369 000
11.
Reduction of greenhouse gas by
gasification in Varna municipality
300 000
49 046
12.
Co-generation gas power stations
AKB Fores PLC Financial Industrial
Group
811 000
193 000
Total
10 629 707 3 323 114
Plans concerning JI in Bulgaria
EU ETS is limiting the scope for JI to a great extend
Still!
13 new project ideas are endorsed
What is left?
Mainly projects outside of the Scheme and nonCO2 projects
Besides indirect
renewables
double
counting
Rely on GIS
limits
the
Plans concerning JI in Bulgaria, cont.
A6SC decisions are important
Additionality is crucial
Track 2 – high transaction cost
Rely on JI Track I
Planned activities to meet the eligibility
requirements for JI Track I
Submitted annually a greenhouse gas inventory report
(currently for 2004, missing for 1989 – next year)
Assigned Amount Units will be calculated and submitted in
2006
National system for the evaluation of GHG emissions – 2006
(responsible body – ExEA)
National registry – project initiated (DEPA)
Deadline – end of 2006
Supplementary information on the assigned amount - 2006
Host Country view on JI Track I
JI Track I = GIS hard greening
Standardised baselines - lack of financing
Local validators – accredited by the Bulgarian
accreditation agency, possibly EUETS validators
Additionality – simplified, environmental
additionality
National guidelines to be developed on the basis of
the existing guidelines for Track II
Draft Plan of action for moving the existing
Bulgarian JI projects to Track 1
Declaration by the Bulgarian government
1.
-
the project will generate the amount of ERUs and possible
AAUs as stated in the PDD
-
the project is additional
-
agrees with the methodology used
2.
Contacting the Suppliers – workshop
3.
Control on whether the actions undertaken for
Track 1 are consistent with the (possible)
requirements of the JI Supervisory Committee
4.
Transfer of ERUs upon receipt of verification
reports
Linking the JI projects to EU ETS
• Direct double counting – cancel
allowances from concrete installations
• Indirect double counting – deduct
allowances from electricity sector (for
heating – from concrete installations)
Making JI projects possible
• Set aside
1. Renewables - from electricity sector
2. Others - from electricity sector
3. Early credits – from National registry
MINISTRY OF ENVIRONMENT AND WATER
Ivona Grozeva
Head of JI Sector
Phone: (+359 2) 940 6101
Fax: (+359 2) 981 6610
E-mail: [email protected]
Web site: www.moew.government.bg