H5 Wet Weather Pump Station - North Hudson Sewerage Authority

Download Report

Transcript H5 Wet Weather Pump Station - North Hudson Sewerage Authority

Presentation to Maxwell Place Homeowners
Association
1
Agenda
 Project Needs/Benefits
 Site Plan
 Construction Process
 Access at the Site
 Noise Reduction
 Effect on Businesses
 Communications with Residents
 Restoration of the Site
 On-going Maintenance
 Schedule
 Questions
2
Project Needs/Benefits
 Reduce and Protect Against
Flooding


Pump Station Minimizes /Eliminates
Street Flooding in Northern Hoboken
Integral Part of Overall Plan (“Rebuild by
Design”) to Guard Against Rising Sea
Levels/Superstorm Sandy Event
3
Project Needs/Benefits
 Provides Maxwell Place Infrastructure
with Greater Resiliency



Pump Station Reduces Potential for Backups
in Long-Term for Maxwell Place Private
System
New Emergency Generator for Backup Power
at 11th Street Pump Station
Protects the PSE&G Substation that provides
power to Maxwell Place
4
Project Site Plan
5
Construction Process: Noise Reduction
 Noise Reduction
 Hours of Construction Limited to Reduce Community
Disruption:



Monday through Friday Only
Between Hours of 8 am to 5 pm
No Weekend or Off-Hour Construction Activity
 No Pile Driving East of Hudson Street
 Substantially Less Noise without Need for Piles
 Limited Truck Traffic
 Concentrated During Excavation and Concrete Placement
 No Need for Constant Trucks In and Out of Site
6
Construction Process: Access
 Access at the Site
 Sidewalks
 South Sidewalk: Open at All Times
 South Sidewalk: Maintain Drop-Offs for School
 North Sidewalk: Brief Intervals of Closure Between Sinatra
Drive North and Hudson Street
 Traffic
 Uninterrupted Access to Parking Garage
 East-Bound Traffic Lanes (Between Sinatra Drive North and
Hudson Street): Open at All Times
 West-Bound Traffic Lanes: Temporary Closures
 Parking
 No Street Parking During Construction Hours
 Parking During Non-Construction Hours & on Weekends
7
Construction Process: Businesses
 Effect on Local Businesses



Sidewalk Access Permits Unimpeded Foot Traffic to Local
Businesses
Traffic Controls at Site Should Not Impact Businesses
 Drop-off Point Will Be Maintained During Construction
Parking Access May Have Limited Effect
 Parking Garage Access Remains In Place
 Restrictions on Street Parking May Have Limited Impact
8
Construction Process: Communications
 Keeping Residents Informed
 Monthly Progress Report Posted on North Hudson
Sewerage Authority Website
http://www.nhudsonsa.com/
 Onsite Construction Field Office
 Executive Director and Authority Engineer Available for
Update Meetings
 24/7 Community Outreach Hotline
9
Restoration of Site
 Street
Complete repaving of 11th Street
 Both Sides Between Sinatra Drive North &
Hudson Street

 Restoration of Island Landscaping
 Blend Covers into Landscape Plan
10
H5 Wet Weather Pump Station
Control Vault View
H5 Wet Weather Pump Station View
th
11 Street from Sinatra Drive North
On-Going Maintenance
 Pump Station
 2 Hours Monthly Maintenance Visits
 Safety Checks
 Equipment Inspection & Preventative
Maintenance
 Control Vault
 2 Hours Weekly Maintenance Visits
 Controls Check
 Preventative Maintenance
13
Schedule
 November/December 2014 – Public Advertisement
 January/February 2015 – Contract Award
 April 2015 – Commence Construction
 February 2016 – Construction Completed
 March 2016- Ribbon Cutting
14
Questions?
North Hudson Sewerage Authority
1600 Adams Street
Hoboken, NJ 07030
Phone: (201)-963-4685
http://www.nhudsonsa.com/
15