chapter 13 - mailab.snu.ac.kr

Download Report

Transcript chapter 13 - mailab.snu.ac.kr

제 11 주차 강의
 11 주차~ 이후(Time Study)
 교과서 13장: Predetermined Time (Standard) System
 교과서 14장: Work Sampling
 교과서 15-18장: Indirect Labor Standard, Follow-up,
Wage Payment, Training and other Management Practice
 1-9주차









산업공학, 산업 발전 역사, IE 인재의 모습
교과서 1-2장: Methods, Problem Solving Tools
제조 프로세스
교과서 3~6장: Operation, Manual, Equip., Tool, Workplace 개선
교과서 7~8장: Cognitive work, Safety(개괄적으로)
교과서 9장: Implementation
중간고사 및 리뷰
Job Evaluation, Time Study(rating, allowance),
Standard Data(Machining, Welding, etc.)
1
Time Study
 They define a “fair day’s work”
 They provide a means to convert workload into
staffing and equipment needs
 They allow alternative methods to be compared
objectively
 They provide a basis for wage incentives and
evaluation of worker performance
 They provide time data for:
 Production planning and scheduling
 Cost estimating
 Material requirements planning
2
산업공학의 경영혁신 기법: IE, VE, TQM, TPM
. IE (Industrial Engineering)
공학적인 문제 해결 절차
작업 방법 설계 보다 나은 작업
방법의 설계
a. 작업 방법
b. 재료
c. 공구 및 장비
d. 작업 조건
불필요작업제거
작업혼합
작업순서변경
작업단순화
작업, 공정 분석
차트와 도표
동작 연구
미세 동작 연구
작업의 표준화 및 문서화
작업지시서
차트와 도표
영화 필름 및
비데오 테잎
3/53
작업량 측정
- 표준시간의 결정
작업자의 훈련
성과급 제도
초시계 연구
표준 자료 법
현장 훈련
PTS법
워크 샘플링
직업훈련원
동기부여
4/53
PowerPoint to accompany
Methods, Standards, and Work Design
12th Edition
Niebel/Freivalds
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
13장의 구성
 3.1. MTM(Method Time Measurement)
 3.2. MOST(Maynard Operation Sequence
Technique)
 3.3. PTS Application
6
MTM(Method Time Measurement)의 종류
 MTM-1(교과서 Table 13.1)
 MTM-2 (교과서 Table 13.3)
 왜?: details of MTM-1 is uneconomical
 MTM-3: 더 간략화
 Handle, Transport, Step/Foot, Bend/Arise




MTM-V: metal cutting
MTM-C: clerical
MTM-M: microscope
MTM-TE, -MEK, -UAS, 등 특화된 작업에..
8
MTM-1
9
MTM-1
10
MTM-2
11
MOST
21
MOST
22