CNS/ATM Project of CAA Taiwan
Presented by
Frank LIN, ATM Program Manager
07/29/2009
CNS/ATM Project
Schedule
Item
2003
2004
2005
2006
2007
2008
2009
2010
2011
1. ATS Services Network (ASN)
2. ATS Message Handling System (AMHS)
Relocation
Communication
3. Voice/Data Link VOLMET and ATIS
4. Data Link Service Provider Partnership
1. SBAS
Navigation
Relocation
D/ATIS & VOLMET/DSP
ATM/DSP
Planning
2. GBAS
Planning
3. APEC GNSS Test bed Project
Surveillance
1. ADS-B
1. ATC Organization Consolidation and
Airspace Re-structure
2. Construction of North & South ATS
Centers
3. Air Traffic Management System (ATMS)
4. Digital Voice Communication Switching
System (DVCSS)
5. Aeronautical Information Service System
(AISS)
6. ATS Facilities Relocation
7. Independent Back ATC System (IBAS)
Planning
Trail Sys
Modify
Transition
Completed by Mid 2007
Planning
Procurement
Implementation (39 months)
Transition
Planning
Procurement
Implementation (39 months)
Transition
Planning
Procurement
Implementation (39 months)
Transition
Relocation
Relocation
CNS/ATM Project
Air Traffic
Management
Preplan
2
Communication





ASN (ATS Services Network)
AMHS (ATS Message Handling System)
Voice/Datalink VOLMET and ATIS
Air-Ground Datalink
AIDC (ATS Inter-facility Data
Communications)
CNS/ATM Project
3
ATS Services Network
 Commission: 2009.04
ASN2 WAN架構
豐年
FERCE
花蓮
助航台
FERCE
清泉崗
助航台
FERCE
大屯山
助航台
FERCE
翔安
北竿塔台
(圖7)
南竿塔台
(圖6)
松山
諮詢臺
台北
諮詢臺
松山塔台/
業務室
(圖5)
台北塔台
(圖4)
微波
綠島塔台
(圖15)
2*512k
蘭嶼塔台
(圖14)
2*512k
馬公
助航台
FERCE
(圖10)
512k
恆春
助航台
FERCE
(圖12)
512k
嘉義
助航台
FERCE
(圖16)
512k
豐年塔台
(圖13)
2*512k
恆春塔台
(圖11)
2*512k
馬公塔台
(圖9)
2*512k
金門塔台
(圖8)
2*512k
2*512k
2*E1
2*512k
2*E1
2*E1
HiLink
ATM Network
2*T3
2*T3
南管園區
(圖3)
2*NGSDH(4M)
2*NGSDH(4M)
CNS/ATM Project
高雄塔台
北管園區
(圖2)
高雄
諮詢臺
15JUN2008
ASN WAN
圖1
IMC
4
AMHS
 System Acceptance: 2005.10
CNS/ATM Project
5
VOLMET & ATIS
 System Acceptance: 2005.12
CNS/ATM Project
6
Navigation





SBAS
GBAS
APEC GNSS Test Bed Project
RPS (RAIM Prediction System)
RTRS (Real Time RAIM System)
CNS/ATM Project
7
APEC GNSS Test Bed
 Starting 2005.10
 Taipei TRS successfully integrated in 2006
CNS/ATM Project
8
CAA TRS Subsystem Architecture
Computer
(Linux)
10BaseT
Ethernet
GPS L1/L2
Signals
Connection
To TMS Site
L1/L2
GPS
Receiver
GPS L1
Signals
RS-232
Serial
Serial /
Ethernet
Switch
10BaseT
Ethernet
Router
GPS L1/L2
Antenna
Remote Login
Connection
10 MHz
Reference
GPS L1
Antenna
NTP
Server
10BaseT
Ethernet
CNS/ATM Project
DCB
Oscillator
9
MSAS Coverage
CNS/ATM Project
10
RPS (RAIM Prediction System)
 NCKU funded by CAA
 Offline processing
CNS/ATM Project
11
RTRS (Real Time RAIM System)
 NCKU funded by CAA
 Real-time processing
CNS/ATM Project
12
Surveillance
 Radars
 Multi-lateration
 ADS-B
CNS/ATM Project
13
Radar Installation
 10 civilian
radars (1 with
Mode-S
capability)
 Replacement of
2 radars
CNS/ATM Project
14
ADS-B System
 6 ground stations
 Contract: 2009.04
 System acceptance: 2009.12
CNS/ATM Project
15
ADS-B Coverage
CNS/ATM Project
16
ATM Program




ATS organization consolidation
Airspace restructure
Construction of North and South ATS Parks
Implementation of ATMS, AISS and
DVCSS
 ATS facilities relocation
CNS/ATM Project
17
ATS Facilities
Current
Year 2011
CNS/ATM Project
18
Consolidation of ATC Facilities
 Concurrently with ATC OP transition
TACC
Taipei TCC
North
ATS Park
Hualien TCC
Taichung TCC
Taitung TCC
South
ATS Park
CNS/ATM Project
Kaoshiung TCC
19
Airspace - Enroute
 Managed by
TACC in North
ATS Park
CNS/ATM Project
20
Airspace - Terminal
North
ATS Park
Taipei
TMA
Hualien
TMA
Matsu
TMA
Kaoshiung Taitung
TMA
TMA
Kinmen
TMA
CNS/ATM Project
South
ATS Park
21
North ATS Park
CNS/ATM Project
22
ATC OPS Room in North Park
CNS/ATM Project
23
South ATS Park
CNS/ATM Project
24
ATC OPS Room in South Park
CNS/ATM Project
25
Existing ATC Systems
 ATCAS
 Commission: 1994
 NAS - TACC
 ARTS - Taipei, Taichung, Kaohsiung TCC
 Eurocat-1000
 Commission: 2000
 Hualien, Taitung TCC
 Micro-ARTS
 IBAS
 Commission: 2007
CNS/ATM Project
 Commission: 1990
26
ATMAS Implementation
 Major components
 ATMS (Eurocat-X by Thales ATM)
 AISS (ANAIS by Thales IS)
 DVCSS (VCS-3020X by Frequentis)
 Contract: 2006.10.16
 System Acceptance: 2010.02.19
 Commission: 2011.02.20
CNS/ATM Project
27
System Architecture
CNS/ATM Project
28
ATMS Functionalities
MSTS (Multi-Sensor Tracking System)
FDP (Flight Data Processing)
HMI for stripless operation
ATC Tools
Conflict Detection
ATFM (Air Traffic Flow Management)
A-G & G-G Datalink communications
Synchronous replay of data and voice
Simulation and training
CNS/ATM Project









29
AISS
ASN LAN
ASN LAN
ASN LAN&WAN
FIC
ATMS
Development system
FIS
ATSMO
DB
AMHS
AISS clients
IMC
DB
WAN
ATSD
AISS main server
TAMC FTP server
(AOAWS+WAFS)
ATMS CWP clients
Time Server
ASN LAN
ASN WAN
CAA eAIP
Demarcation
point
Demarcation
point
Self/Home Briefing
Airlines / MIL
CNS/ATM Project
WWW
Application & Web servers
30
Aeronautical Information Distribution
AIS DISTRIBUTION
FP
L/
g
Fl i
INTERNET
FPL/DPL/PIB/NOTAM/MET/Flight RPTs
ht
D
FPL/RPL/DPL/Flight
a ta
FIDS
FPL/DPL/PIB/
NOTAM/MET/
Flight RPTs/
AIP/Flight Data
fo
FP L
r vali
datio
n(
r)
pape
FP
L
FPL for validation
RCAA OPMET
RCAA NOTAM
NOTAM
RCAA FPL Validated by AISS
RCAA FPL filed in ATMS
ATSD eAIP
AISS
Boundary of ANWS’s Systems
RC
AA
L
FP
FP
V
a
alid
Lt
o
te d
by
A
S IT
A IS
a
dd
S
AMHS
G
RI
Ch
B/
AMHS UA
ar
ts
RCAA
OPMET
/O
PM
ET
/G
TS
ASN
n
ti o
lida
d
ad
o
ITA
Lf
FP
oS
t
L
FP
a
rv
AISS WEB Server
(AES)
FPL/RPL/DPL/
Flight RPTs
RPTs
FP
SITA Network
SITA
FPL/DEP,ARR MSG
RCAA DEP,ARR MSG
RCAA NOTAM
NOTAM
RCAA FPL Validated by AISS
RCAA FPL filed in ATMS
R C FP
AA L/D
FP E P
L ,A
R C Va l R R
AA i d a t MS
R
R
C
N ed G
R C C A A A A OT b y
A A D E OP A M A IS
S
FP P , A M E
L f RR T
ile
d i MS
nA G
TM
S
Other
FIRs
Boundary of ANWS’s Systems
TAMC
GRIB/RPL/DPL/AIP Static Data
Flight Data to FIDS
ATMS
96.09.19
頁數:1
AISS流程
工程隊
CNS/ATM Project
MET FTP
on
a ti
dd
alid
Aa
S IT
o
Lt
v
fo r
Airlines
31
Thank you for your attention!