Chhattisgarh

Download Report

Transcript Chhattisgarh

Welcome
Chhattisgarh
BGREI
Central Steering Committee (CSC)
Review Meeting
Meeting Dated - 20 Dec., 2013
Department of Agriculture, Chhattisgarh
INDEX
Particular
Page No.
Chhattisgarh an overview
01
Scenario of Rice Cultivation in Chhattisgarh
02
A- Achievement BGREI - 2012-13
Impact of BGREI Interventions
03-05
06
B- Strategy adopted by State
07-09
Photographs
10-13
C - Achievement BGREI 2013-14
14-15
D- Efforts in Increasing procurement and Storage
16
E - Result of Crop cutting Rice Demonstration 2013-14
17
Issues for Consideration
18
Chhattisgarh–An Overview
Agro Climatic Zones
 Sub-divided into three agro climatic zones.
Northern Hills
Zone
 Geog. area
: 138 lakh ha.
 Forest cover
: 63.36 lakh ha. (46%)
Net sown area
: 47.75 lakh ha. (35%)
 Net Irrigated Area : 14.15 lakh ha. (30%)
 57 % soil is medium to light.
Chhattisgarh
Plains Zone

Average rainfall
 Farm families
: 1334 mm.
: 37.46 lakh
(33% ST, 12 % SC)
 76% small & marginal Farmers
Bastar Plateau
Zone
 Cropping intensity : 136 %
1
Scenario of Rice Cultivation in Chhattisgarh

Rice constitutes 75 % of total kharif cropped area.

Around 63 % rice is sown by broadcast biasi method.

71 % area under rainfed condition.
Situation-wise Percent rainfed area :
Rainfed Upland
Rainfed mid land
Rainfed low land
45 %
35 %
20 %
Seed Replacement Rate (SRR) :Year
2010
2011
2012
SRR %
28.41
34.63
36.38
 Early and mid - duration varieties cover 64 % of total Paddy area.
 Coverage of Hybrid Rice - 4.80 % of total Rice area.
 Average productivity of Rice (kg/ha.) :
Year 2012-13
Chhattisgarh
2041
National
2372
2
A-
ACHIVEMENTS BGREI - 2012-13
Components
Unit
Sanction
Rs. in lakhs
Achievement
Phy.
Fin.
Phy.
Fin.
Demonstration of Rice
Ha.
87724
5835.95
86940
5817.95
Hy. Maize Seed
minikit
(0.4 Ha each)
No.
51430
762.85
51430
762.85
Asset Building
2721.20
2721.20
Site Specific Needs
3800.00
3800.00
Addmi. & Other
Conti.
30.00
30.00
Total
13150.00
13132.00
(99.8%)
3
BGREI - 2012-13
S.
N
o.
Components
Sanction
Achievement
Achievement
(During 13-14)
(upto March 13) Target of 12-13
Phy.
Fin.
Phy.
Fin.
(a) Rainfed
Upland Rice
20000
1560.00
20640
(b) Shallow
Low land Rice
30000
2340.00
31724
6000
(c) Irrigated Traditional
1 Variety
(d) Irrigated Hybrid
Dist. of Hy.
Maize Seed
Minikit
51000
TOTAL
138724
Rs. in lakhs
Fin.
Phy.
Fin.
1301.19
0.00
20640
1301.19
29797
1874.93
300.00
29797
2174.93
2340.00
30771
1754.04
214.81
30771
1968.85
358.80
5732
372.98
0.00
5732
372.98
51430
762.85
51430
762.85
138370
6065.99
138370
6580.80
6598.80
Phy
Total
Achievement
0
514.81
4
BGREI - 2012-13
S.
N
o.
Components
Sanction
Achievement
(upto March 13)
Rs. in lakhs
Achievement
(During 13-14)
Target of 12-13
Total
Achievement
Phy.
Fin.
Phy.
Fin.
Phy
Fin.
Phy.
Fin.
2
Borewell Topup
(Rs. 7000 to
15000)
1834
201.70
1601
173.48
233
28.22
1834
201.70
3
Construction of
Check dams
273
2519.50
259
2417.91
14
101.59
273
2519.50
4
Construction of
MIT
103
2300.00
102
2241.11
1
58.89
103
2300.00
5
Subsidy on
Agriculture
Implements as per
MMA norms
1594
1500.00
7814
1287.29
0
212.71
7814
1500.00
6
Contingencies
(Operational /
Monitoring)
30.00
26.13
3.87
30.00
Grand Total
13150.00
12211.90
920.10
13132.00
5
Impact of BGREI Interventions
Increase in productivity of Rice / Maize :Crop
2010
2012
Rice (BGREI Districts)
1894
2162
Rice (State)
1751
2041
Maize (State)
1807
1935
Area Expansion under irrigation In last three years (2010-11 to 2012-13) :Components
Number
Additional area brought under irrigation
New tubewells
5471
8207
Checkdams
651
7487
MIT
235
7050
Increase in cropping intensity :-
Year
2010
2012
%
135
136
Agriculture Mechanization :Year
2010
2012
Farm power availability kw/ha.
0.72
0.86
6
B-
Strategy adopted by State :-
(a) Rainfed situation Rice :
(i)
Thrust on line sowing with weedicide application instead of
broadcasting.
(ii) Promotion of early / mid duration rice varieties to ensure timely sowing
and area expansion under rabi crops
(b) Irrigated condition :
(i) Emphasis on increase in area under transplantation / SRI
(ii) Thrust on use of chemical fertilizer and micro nutrient based on soil
analysis.
(iii) Distribution of green manuring seed to farmers on subsidized rate.
(iv) Area expansion under hybrid rice.
7
Strategies adopted
Block Demonstration :

Time bound programme for selection of farmers and their training.

Ensured timely input supply.

Regular field visit of nominated scientists and field functionaries for technical
support.
Site specific intervention :

Only 30% of net sown area is irrigated through different sources.

Average annual rainfall of the state is fairly high (1334 mm).

Due to inadequate water harvesting structure major portion of rain water go waste.

For the purpose of conserving rain water and its utilization for irrigation
checkdams / minor irrigation tanks are being constructed under site specific
activities.

Suitable sites are selected with consultation of local farmers / Panchayati Raj
Institutions.

Above structures are constructed on Government land.

Constructed structures are handed over to local Gram Panchayat for utilization
and maintenance.
8
Rice - Block Demonstration
9
Direct seeded line sown Rice crop
Var - Bambleshwari
Var- MTU 1010
10
13
Rain water harvesting structure under BGREI
Check
Dam
Raipur
Kondagaon
Gariyaband
11
Minor Irrigation Tank
Ambikapur
Bilaspur
12
C.
BGREI 2013-14
Rs. in lakhs
A-BLOCK DEMONSTRATION
Situations
Unit
Target fixed by
GOI
Sanction by
SLSC
Achievement
Phy.
Fin.
Phy.
Fin.
Phy.
Fin.
(a) Rainfed Upland Rice
25000
1978.00
21400
1693.17
20704
998.50
(b) Shallow Low land Rice
25000
1978.00
29400
2326.13
32107
2015.25
69900
5488.55
39394
2699.28
40390
2185.60
(d) Irrigated - Hybrid
10000
781.70
20900
1633.75
20504
960.65
Total
129900
10226.25
111094
8352.33
113705
6160.00
(c) Irrigated - Traditional
Variety
Ha.
Total area under rice in the state is 36.70 lakh ha out of which 15.38 lakh ha.
(42%) area falls under BGREI districts and rest 58% under NFSM district.
As only 42% rice area is under BGREI districts. State has proposed lesser
target for Block Demonstration.
13
Rs. in lakhs
Contd. .
Components
Unit
Target fixed by
GOI
Sanction by
SLSC
Achievement
Phy.
Fin.
Phy.
Fin.
Phy.
Fin.
B-Assets Building
Pump Sets
Nos.
2900
290.00
0
0.00
0
0
Dug Wells/Borewell
/Borewell Topup
Nos.
12000
3600.00
3000
900.00
0
0
Paddy Transplanters
Nos.
500
200.00
150
60.00
0
0
Distri. of Agri.Imp.As per
MMA Norms
Nos.
700.00
1152
356.00
Total
4090.00
1660.00
356.00
C-State Specific
Construction of MIT
Nos.
Const. of Check dams
Nos.
4090.00
40
1000.00
0
0
325
3000.00
192
0
0
0
D-Marketing Support
2044.752
2044.00
Grand Total (A+B+C+D)
20451.00
16056.33
6516.00
(64%)
14
D.
Efforts in increasing Procurement and Storage
Paddy procurement under support price from 2010-11 to 2012-13 is as below :-
Paddy
Paddy
Amount
procurement Purchased
(Lakh Rs.)
Centre (No.)
(MT)
% increase % increase
against
over
previous
previous
year (MT)
year
S.
No.
Year
1
2010-11
1589
5116083
517432.26
688241
13.45%
2
2011-12
1888
5973067
651527.82
856984
14.35%
3
2012-13
1947
7136863
899574.97
1163796
16.31%
Paddy procurement is gradually increasing
15
E-
RESULT OF CROP CUTTING - BGREI RICE DEMONSTRATION 2013-14
Unit : Kg.per ha.
Average Productivity
S.
No
Situations
Demonstration
Plot
Control
Plot
%
Increase
1
Rainfed Upland Rice
4448
3846
16
2
Shallow Low land Rice
4606
4042
14
3
Irrigated - Traditional
High Yielding Variety
4984
4606
8
4
Irrigated - Hybrid
4863
4358
12
16
Issues for Consideration
Construction of rain water harvesting structure
(Checkdam, MIT) are important site specific activity of the
State and it has significant impact on increasing productivity
and cropping intensity.
These Structures are constructed on Government land
and handed over to Gram Panchayat for utilization &
maintenance.
Since 2010-11, 100% assistance was allowed for this
activity but during 2013-14 GOI suggested only 50%
assistance. Since these structure are being constructed on
Government land and it is community assets hence 100%
assistance may be allowed as earlier years and as per
sanction of SLSC.
17