Efficiency of Sem II vs Library buildings

Download Report

Transcript Efficiency of Sem II vs Library buildings

Comparing Efficiency
Comparing Sem II and the Library
Building energy consumption
By
Brennon Murphy
Derik Archibald
If TESC were to use Seminar II building to its
full capacity for classroom use, instead of the
Library would TESC save energy and money
Hypothesis:
1.
2.
3.
Yes, if TESC were to transfer classroom use from the Library to the
modern Sem II building it will save a substantial amount of energy
and money.
No, if classrooms were to transfer from the Library to the Sem II
building barriers created by the features of Sem II may prevent full
use of the building and may actually make it less efficient than the
Library. Thus Sem II may become overloaded making it very
inefficient.
Null Hypothesis, it is impossible to compute classroom usage only
in both Sem II and Library because the barriers with the energy use
breakdown.
Accepted Hypothesis
•
•
•
•
•
Null Hypothesis
No meters for Sem II
Rough Analysis
TESC Total energy before and after Sem II
Total Energy after – Total energy before=
rough estimate of Sem II energy use.
Promote Energy Efficiency
•
•
•
•
Promote energy efficiency to its full capacity
Energy Efficiency at TESC
Learn to measure and compare energy usage
Provide an understanding inefficiency and
solutions
• Provide TESC with knowledge of energy usage
and ways of conserving energy and money.
LEED
• U.S. Green Building Council (USGBC) and Leadership in
energy and Environmental Design
• Consensus-based national standards for sustainable
buildings, adaptable to new processes and technology.
• Site Sustainability, water and energy efficiency, materials
and resources, indoor environmental quality, innovative
technology
Seminar II
•
•
•
•
160,000 square feet
Five cluster building
Finished spring 2004
$44 million dollar
project
http://www.evergreen.edu/facilities/buildings/018_SEMINARII/projec
ts/01_03/01001.htm
Seminar II Efficiency
• Maximum sunlight and easy ventilation
• Minimum volatile compound
• Recycled hardwood, cork floors, natural
ventilation, radiating heat, indirect and natural
lighting.
• Green Roofs, natural reservoir.
• Concrete floor
• 21st century wiring
Library Renovation
• Renovation of B and C
wings
• $21.5 million budget
• To be completed in two
phases
• Begin construction
March 1, 2005
• End construction June
15, 2006
http://www.evergreen.edu/facilities/buildings/001_LIBRARY%20BUILDI
NG_%5BDANIEL%20J.%20EVANS)/projects/04_05/Libraryreno.
htm
Library Description
•
•
•
•
Named Daniel J. Evans Library
Constructed in 1971
346,969 square feet
Multipurpose building
Renovation Time Line
• March 1, 2005: Construction begins on
Phase 1-C Wing
• October 21, 2005: Construction begins on
Phase II
• June 15, 2006: Construction complete
• Phase I & Phase II Tasks
Factors of Inaccuracy
• Student population
increase
• Temperature variation
• Buildings always
being heated or cooled
• Library computer lab
and size
• TESC entire energy
consumption data
(every building)
• Construction of Sem II
• Modular housing,
dorms
• Swimming pool
Electricity Use of TESC
Electricity in MWHR
Electricity Consumption for TESC
1450
1400
1350
1300
1250
1200
1150
1100
1050
1000
2003
2004
ri l
p
A
M
ay
ne
u
J
ly
u
J
st
er
er ber
er
u
b
b
b
g
o
m
em em
ct
Au e te
v
O
o
ec
p
N
D
S
Month
Energy Consumption Change
500
300
200
2002-2003
2003-2004
100
Ju
ly
Ju
ne
Au
gu
Se
st
pt
em
be
r
O
cto
be
No
r
ve
m
be
De
r
ce
m
be
r
-200
M
-100
ay
0
Ap
ri l
Difference in MWHR
400
-300
Months
Library & Seminar II
Electricity Consumption
4000
3500
3000
Electricity in Mwh
• Library computer labs
• Library larger
• Theoretical
comparison
• Library uses more
electricity than Sem II
2500
Library
Sem II
2000
1500
1000
500
0
April- December 2004
Gas Consumption vs. Temperature
Natural Gas Consumption for TESC
Temperature of Olympia
2003
2004
Natural Gas in BTUs
140000
70
65
60
Temp. in 55
Fahrenheit 50
45
40
35
30
120000
100000
2003
2004
80000
60000
40000
20000
Ap
ri l
M
ay
Ju
ne
Ju
l
Au y
g
Se
us
pt
em t
b
Oc er
to
No be r
ve
mb
De
ce er
mb
er
0
Month
A
il
pr
M
ay
ne
Ju
ly
Ju
r
t
r
r
r
us
be be
be be
g
m
m
m
to
u
A pte Oc
ve ce
o
e
e
N
D
S
Month
Energy Costs
Money Spent
$700,000
$600,000
$ Dollars
$500,000
$400,000
$300,000
$200,000
$100,000
$0
2003 electricity
2003 Gas
2004 electricity
April-December
2004 gas
Student Population
Number of Students
TESC Student Population
4450
4400
4350
4300
4250
4200
4150
4100
4050
4000
2003
2004
1
Time
Conclusion
•
•
•
•
•
Sem II is more efficient than the library
Natural Gas consumption hardly effected
Sem II uses less electricity than the Library
Sem II = 2.1 kwh/square foot
Library = 10.8 kwh/square foot
Resources and Credit
•
•
•
•
•
•
•
•
•
•
Nancy Johns assistant project manager
Richard Davis campus engineer
Patty Vandewalker building services
Rob Knapp faculty
Lara Boyd student
Professor E.J. Zita
Josh Skov from Good Company
www.evergreen.edu
www.wunderground.com
www.usgbc.org/