19 13 0054 00 0000 tg1 closing report for march 2013

Download Report

Transcript 19 13 0054 00 0000 tg1 closing report for march 2013

March 2013
doc.: IEEE 802.19-13/0054r0
TG1 Closing Report for March 2013
Date: 2013-03-21
Authors:
Name
Company Address
Mika Kasslin
Nokia
Phone
Otaniementie 19,
+358-50-4836294
02150 Espoo, Finland
email
[email protected]
Notice: This document has been prepared to assist IEEE 802.19. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in
this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein.
Submission
Slide 1
Mika Kasslin, Nokia
March 2013
doc.: IEEE 802.19-13/0054r0
Abstract
This is TG1 closing report from March 2013 plenary
meeting in Orlando, FL, USA
Submission
Slide 2
Mika Kasslin, Nokia
March 2013
doc.: IEEE 802.19-13/0054r0
Agenda and Results
• The TG focused on comment resolutions with 59
technical and 9 general comments open
• The TG heard several contributions related to the
comments and many of them were accepted as
comment resolutions
– All the comments were addressed
• This gives the TG an opportunity to ask the WG chair
to submit an updated draft into WG re-circulation LB
• Draft meeting minutes available in 19-13/0037r3
• Approved comment resolutions available in 1912/0204r9
Submission
Slide 3
Mika Kasslin, Nokia
March 2013
doc.: IEEE 802.19-13/0054r0
What’s Next?
1. The TG requested the TG editor to prepare by April
4th, 2013, a new 802.19.1 draft for WG re-circulation
LB
2. The TG kindly asks the 802.19 WG chair to start a 25day WG Re-circulation Letter Ballot on a new
802.19.1 draft no later than April 8th, 2013
Submission
Slide 4
Mika Kasslin, Nokia
March 2013
doc.: IEEE 802.19-13/0054r0
Tentative Schedule
•
•
•
•
•
•
•
•
wk-Mar25
wk-Apr01: New draft released by the TG editor
wk-Apr08: WG re-circulation ballot opens
wk-Apr15
wk-Apr22
wk-Apr29: WG re-circulation ballot closes
wk-May06
wk-May13: May 2013 interim meeting
Submission
Slide 5
Mika Kasslin, Nokia
March 2013
doc.: IEEE 802.19-13/0054r0
Teleconferences
• The TG will have no teleconferences before the May
2013 interim
Submission
Slide 6
Mika Kasslin, Nokia
March 2013
doc.: IEEE 802.19-13/0054r0
May 2013 Interim Objectives
• Continue comment resolutions and resolve all the
remaining comments
– After this meeting we have still 63 technical and general comments
open
• Have the draft prepared for a recirculation WG LB
after the March 2013 meeting so that the ballot closes
before the May 2013 interim
• Decide on whether the 802.19.1 draft is ready to be
made available for IETF PAWS
Submission
Slide 7
Mika Kasslin, Nokia
March 2013
doc.: IEEE 802.19-13/0054r0
Targeted TG1 Timeline
•
•
•
•
•
•
•
•
Second Working Group Letter Ballot: October 2012
Recirculation Letter Ballot: March 2013
Recirculation Letter Ballot: July 2013
Form Sponsor Ballot Pool: July 2013
Initial Sponsor Ballot: November 2013
Recirculation Sponsor Ballot: March 2014
Final WG/EC Approval: July 2014
RevCom/Standards Board Approval: September 2014
Submission
Slide 8
Mika Kasslin, Nokia