Transcript Response
RFA 19 – Robustness of Operations Software • • Specific Request – Specify plans and requirements to ensure that software, particularly that “inherited” from I&T, will be of sufficient robustness for operations use. Response – Using ITOS for LAT health and safety operations – Plan to use existing automated notification software tools (such as FASAT or SOF RXTE) to help assure reliable 24/7 operation of ISOC – Other software tools • ISOC will use existing software where possible • ISOC will follow a complete verification and validation process, as described in LAT-SS02513-1 LAT ISOC Verification and Validation Plan • The ISOC Test Plan document (to be released in April 2005) will provide the mapping of all Level III requirements (in LAT-SS-0021-8) to software components • Test procedures will be documented to cover each requirement (either in the Test Plan or in a separate Test Procedures document) – See attached SW development schedule for an outline of ISOC testing • The test procedures will be followed before each release to verify that each requirement is met (including regression tests of previously released features) • A fully functional ISOC system will be available for control of LAT upon its arrival at SpectrumAstro • Schedule includes many months of operational use of software before launch (e.g. during I&T and Mission Simulations) ISOC Software Development Schedule Phase / Milestone A u g 0 4 S e p 0 4 O c t 0 4 N o v 0 4 D e c 0 4 J a n 0 5 F e b 0 5 M a r 0 5 A p r 0 5 M a y 0 5 J u n 0 5 J u l 0 5 A u g 0 5 S e p 0 5 O c t 0 5 N o v 0 5 D e c 0 5 J a n 0 6 F e b 0 6 M a r 0 6 A p r 0 6 M a y 0 6 J u n 0 6 J u l 0 6 A u g 0 6 S e p 0 6 O c t 0 6 N o v 0 6 D e c 0 6 J a n 0 7 F e b 0 7 ISOC CDR ITOS setup/configuration ISOC Verif. with Test Bed Diagnostic Tool Dev Mission Planning Dev DB/Web/E-logbook Dev Plotting/Trending Dev SW enhancements ISOC Demos ISOC Simulation Testing ISOC SW Releases 1 2 4 3 Ground Readiness Tests 2 3 4 5 7 6 End-to-End Tests 1 Environmental tests at NRL ISOC testing at NRL ISOC ready to take over LAT operation ISOC used to I/F with LAT (front-door only) Mission Simulations Launch SW Dev Slack Times 2 3 4 5 6 M a r 0 7