Transcript Response
GLAST LAT Project ISOC RFA 16 – ISOC req’ts RE I&T, SAS • RFA 16 Specific Request: – The mechanism for ISOC requirements being placed on I&T and SAS is not obvious. How do ISOC requirements get levied on I&T and SAS? Does ISOC sign off on I&T and SAS specs and functional designs? • Response – Potential requirements are discussed at the regular working meetings now held between the staff of these two subsystems. If requirements are found that are not currently covered within the existing documents, a change is jointly proposed and the relevant documents are modified. – Where joint requirements were found, we have agreed to share personnel to execute them. Specific examples include: • We required I&T to fully document their calibration procedures for use during operations and we are now sharing a technical writer who is working with I&T and ISOC to ensure that the resultant documents meet requirements for both subsystems. • The ISOC also required that I&T data be consistent with ISOC needs. The ISOC is providing the database programmer needed by I&T and will thus ensure that the resultant database meets of the ISOC. – ISOC is involved in the development of all LAT Specs and functional designs. The ISOC manager is a signatory on all plans from the I&T and SAS subsystems. 1