gr_5_kemper_arena_presentation[1].pptx
Download
Report
Transcript gr_5_kemper_arena_presentation[1].pptx
Group 5
History
Structure
Failure Scenario
Reasons of Failure
Engineering Mistakes
Built in 1973 in Kansas City
Multipurpose Stadium
Ice shows, conferences, basketball, soccer games...
Capacity of 17,000
Contemporary Design
Received an award in 1976 from AIA
Cost $23.3 million to build
Steel trusses supported RC roof
Steel trusses hung
from three portals
95m
100m
25m
4th June 1979
One in ten year storm
○ 120 km/h winds
○ 10 cm of rain per hour
Roof collapsed
Rapid air pressure increase blew out walls
Portals remained undamaged
0 victim
Roof used as temporary reservoir during
storms
Accumulation of water due to
inadequate drainage
Ponding of the roof
Roof began to sag and more water accumulated
Increase of load supported by the roof
Bolts subjected to high
rate of oscillations
since erection of Arena
Fatigue of Bolts
Bolts failed in one
hanger due to load
increase on the roof
Domino effect caused
others hangers to fail
Drainage system :
○ Use of 8 drains of diameter 12cm
○ 55 were required according to local codes
What should have be done :
○ Respect of Building Standards
Bolts :
○ Use of A490 bolts
(can only maintain tensile strength for static
conditions)
○ Failed at 1/3 of Design Capacity
due to fatigue
What should have be done :
○ Design of bolts under dynamic conditions
Domino effect :
○ Lack of redundancy in the hangers
What should have be done :
○ Better load distribution
Thank
You!
Group 5
Michael Harte
Emma-Jane Heneghan
Matthieu Huot
Kiara Ryan
Angharad Sweeney