Xcel Energy
Projects From
2008 Reliability Assessment
Douglas Co 2nd Transformer:
• Low voltages in the region for the loss of Douglas Co
transformer.
• Install a 2nd Douglas Co 115/ 69 kV transformer.
• Planned inservice date is ~ 2011
Monticello Transformer Upgrade:
• Loss of Sherco – Benton 345 kV line overloads
Monticello 345/230 kV transformer.
• Upgrade the existing transformer to 550 MVA.
• Inservice date ~ 2011.
Sioux Falls Area Upgrades
• Add second 112
MVA transformer at
Lawrence
• ISD – 12/1/2012
• Split dbl ckt 115 kV
line from Split RockCherry Creek/West
Sioux Falls
• ISD – 6/1/2011
• Solves low voltages
and transformer
overloads
South Minneapolis Electric Reliability Project (SMERP)
To Lexington
New HWY 280
345/ 115kV sub
2013
2-672 MVA @
Parkers Lake
2015
115 kV line
2013
Open Elliot
Park-Hiawatha
line 2013-2020
345 kV line
2013-2020
New Hiawatha
sub 2010 and
Midtown sub
2010
New Crosstown
sub 2014
Dbl ckt 115 kV
line 2014
2-672 MVA @
Eden Prairie
2014
2-672 MVA @
Red Rock
2013
Cannon Falls Area Upgrades
• Loss of either Cannon
Falls transformer
overloads the other
transformer.
• Add a 115/69kV
112MVA transformer at
Colville substation.
• Reroute Cannon FallsByllesby 69kV line to
Colville-Byllesby.
• Replace bus tie breaker
with a breaker ring bus at
Cannon Falls.
• ISD – 6/1/2012