Transcript Overview
MICE WBS rebuild/extract: • Top level: – http://mice.iit.edu/tb/MICE-Schedule/ – PM: (Long acting) S/w to be included in tasks as Appropriate (c.f, tracker group) S/w infrastructure (fibre to ATLAS centre for expample) in infrastructure • Level 2: – MICE Muon Beam, MICE Hall and infrastructure • MMB, MH&I: Nichols • S/w, cntrls, instrumentation: Apsimon – MICE Instrumentation: • Bross – MICE Cooling Channel • Zisman To be expanded to next levels asap. 2.0 MICE Muon Beam, MICE Hall, infrastructure • MICE Muon Beam, MICE Hall, infrastructure: – Nichols • Software, controls, instrumentation: – Apsimon 2.0.1 MICE Muon Beam: 2.0 MMB, MH&I Long 2.0.2 MICE Hall and infrastructure: Nelson 2.0.3 Christmas 2007 shutdown: Hayler 2.0.1 MICE Muon Beam • Long 2.0.1.1 Target • Booth • • • • Removal of old target: • Discussion with RPA: • Require revised method statement quantifying doses, isotopes etc. • Suggestion using MMPX to evaluate activation • Revision goal: 13Sep07 18: Jacking motor controls: • Working with G.Charnley, to be updated, goal 13Sep07. 23: Cable installation: working with A.Nobbs, to be updated, goal 13Sep07 33: Development of bearings: working S.Payne • Require to prepare document for CM19. Document to: • Propose operation scheme to be presented to ISIS (Findlay) for running from January ’08; • Propose development plan for final target bearing scheme • • • 37: Installation of the PSU: • Location defined, working with A.Nobbs 40: Installation of target controls: • Location defined, working DL on controls, S.Britnell on cabling in Hall and MLCR Revision of schedule promised for 13Sep07 2.0.1.2 Q35 refurbishment • Long • Refurbishment scheme needs to be reviewed in light of experience • • Review to be carried out as soon as E.Cappozi and C.Locket are both avaulable. Testing scheme to be developed in consultation with M.Hughes and K.Tilley 2.0.1.3 Linde refridgerator • Courthold • Noted pressure on schedule: • First priority: must not be allowed to slip: • • Implies potential call on additional resources Require to ensure adequate number of people trained for working at height: • MC has organisation of training course in hand • ~8 places available. • Agreed: first call on places for: • Spensley (if not already trained), Jamdagni (+second Hall Foreman), Capozzi, Lockett, Courthold, Nelson, Jones 2.0.1.4 PSI solenoid • Courthold • To be reviewed for next week (13Sep07) • Noted from discussion: • Require to add electrical testing schedule • Swagelock adaptor, which is on order, is required before vac test can begin. • Question added ‘in proof’: • Does this need to be chased with Swagelock? 2.0.1.5 Q4—9 installation • Nelson • To be reviewed for next week (13Sep07) • Noted from discussion: • Presently only delivery schedule • Installation schedule needs to be developed 2.0.2 MICE Hall • Nelson • Tasks identified (with person responsible) below. [Caution, may not be complete list:] • Magnetic shield walls Nelson • MICE Hall Floor: Nelson • Plinth (concrete infill in ‘pit’) • False floor (levelling sloping floor) • Rolling platforms Nelson • Water Govens • Air conditioning Govens • Power Griffiths • Liquid-hydrogen system Ivanyushenkov • MLCR Kyberd • Networking Brandwood • Cabling: Griffiths • • Linde • Test positions Courthold • Final positions Courthold Cable trays/cable layout etc. 2.0.2.1 MICE Local Control Room • Kyberd • P.Kyberd not at meeting so noted: • Revision requested for 13Sep07 • Personnel responsible for sub-systems: • Civil work: Houseman in absence of Pyke • PPS Alexander • Networking Brandwood • Racks ‘DL’ • Rack installation PK • Cabling Britnell 2.0.3 XMas2007-shutdown • Hayler • Discussion of resources (availability, etc.) starts 06Sep07 • Priority 1: • Implies planning of tasks Sep—Dec done to preserve/advance Christmas schedule