1a. Comparative Productivity of Rice in West Bengal From 2006-07-2012-13
Rice Productivity in Kg / ha
Sl
No.
District
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
1
Jalpaiguri
1824
1578
1662
1913
2203
2091
2
Coochbehar
1862
1768
1615
2047
2386
2198
3
Uttar Dinajpur
2301
2432
2320
2180
2627
2699
4
South 24-Parganas
2492
2030
2211
2098
2302
2322
5
Howrah
2084
2199
1795
1678
2639
2105
6
Purulia
2607
2449
2472
2254
1712
2706
7
Paschim Medinipur
2318
2767
2583
2605
2787
2706
8
Purba Medinipur
2429
2074
2163
2357
2734
2527
NFSM district total
2325
2298
2228
2255
2515
2485
% Increase over 06-07
-
-1.2
-4.2
-3.1
8.2
6.9
1
Darjeeling
1866
1844
2115
2335
2412
2209
2
Maldah
3051
3261
2962
2834
3140
2986
3
Murshidabad
2609
2867
2813
2788
2833
2727
4
Nadia
3088
2837
2884
2784
2759
2953
5
North 24-Parganas
2884
2722
2685
2800
2711
2698
6
Dakshin Dinajpur
2412
2486
2443
2436
2955
2573
7
Hooghly
2830
2800
2866
2872
3093
2911
8
Burdwan
3059
2923
2815
3050
2960
2951
9
Birbhum
2772
3098
3078
2686
3003
2913
10
Bankura
2524
2815
2764
2663
2563
2970
2829
2785
2768
2804
2898
2868
2593
2573
2533
2547
2708
2688
Other district total
West Bengal
2012-13 (2nd
Advanced Estimate)
2741
2
1b Comparative Productivity of WHEAT in West Bengal From 2006-07 to 2012-13
Wheat Productivity in Kg / ha
Sl.
No.
Districts
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
1
Jalpaiguri
2055
2329
2086
2269
2301
2492
2
Coochbehar
1956
2192
1622
1985
2034
2214
3
Uttar Dinajpur
2448
2694
2486
2696
2731
2414
4
Dakshin Dinajpur
2476
2958
2898
2982
3019
3236
2278
2561
2329
2531
2582
2521
-
12.4
2.2
11.1
13.3
10.6
NFSM district total
% Increase over 06-07
1
Darjeeling
1428
1764
1371
1673
1730
2083
2
Maldah
2591
2942
2704
2938
3027
3030
3
Murshidabad
2154
2557
2537
2843
2971
2838
4
Nadia
2188
2328
2348
2549
2536
3078
5
North 24-Parganas
2397
2562
2218
2823
2679
2835
6
South 24-Parganas
2051
2015
1406
2079
2557
3061
7
Howrah
1551
2234
1567
-
2040
1187
8
Hooghly
2149
2186
2320
2528
2656
2411
9
Burdwan
2278
2718
2327
2443
2193
2413
10
Birbhum
2643
2952
2816
2649
2672
2612
11
Bankura
2151
2227
1990
2390
2270
2373
12
Purulia
2047
2345
2030
1614
2559
2237
13
Paschim Midnapur
2143
2539
1926
1931
2393
1977
14
Purba Midnapur
2323
2599
2432
2449
2570
2431
2282
2613
2536
2726
2817
2844
2281
2602
2490
2680
2759
2765
Non-NFSM district Total
West Bengal
2012-13 (2nd
Advanced
Estimate
2769
3
1c Comparative Productivity of Pulses in West Bengal From 2006-07 to 2012-13
Pulse Productivity in Kg / ha
Sl No.
Districts
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
1
Maldah
861
1000
868
1149
989
943
2
3
Murshidabad
Nadia
693
724
809
791
785
760
975
890
900
974
952
935
4
Birbhum
773
1019
937
891
1004
958
5
Purulia
437
392
439
333
266
353
% Increase over 06-07
717
-
827
15.3
767
6.9
903
25.9
902
25.8
900
25.5
1
Darjeeling
609
629
586
536
630
670
2
Jalpaiguri
505
521
527
512
616
660
3
Coochbehar
551
625
618
711
730
695
4
Uttar Dinajpur
571
553
694
886
713
565
5
Dakshin Dinajpur
402
471
577
670
434
373
6
North 24-Parganas
576
715
695
961
910
983
7
South 24-Parganas
641
696
688
730
921
810
8
Howrah
548
802
795
709
721
988
9
Hooghly
701
619
773
687
570
974
10
Burdwan
396
530
552
759
997
1094
11
Bankura
551
881
787
861
780
684
12
Paschim Medinipur
577
776
729
702
728
708
13
Purba Medinipur
1205
779
90
95
1341
1332
Non-NFSM Districts
671
688
571
661
778
810
Total West Bengal
703
786
705
825
896
890
NFSM Districts
2012-13 (2nd Advanced
Estimate)
927
4
2. Crop wise Production Estimates of Kharif and Rabi in West Bengal during
2012-13
Sl. No.
Crop
Production (in ‘000 tonnes)
Kharif
Rabi
( As per Partial report
of Crop Cutting &
States own
Assessment)
( As per States
own Assessment)
Total
1
Rice
10400
4400
14800
2
Wheat
-
900
900
3
Total Pulses
32.4
167.75
200.15
4
Total Food
Grain
10545.88
5792.1
16337.978
5
3. Financial Statement 2012-13
(Rs. In lakh)
Approved
Plan
Unspent
Balance of
2011-12*
(Provisional)
Fund
Release
from GOI
Total Fund
Available
during
2012-13
Expenditure
Up to
31.12.2012
3662.85
651.72
1757.75
2409.47
1819.07841
NFSM –
Wheat
831.84
396.41
68.75
465.16
530.36128
759.84
294.68
NFSM –
Pulses
897.49
336.51
-
336.51
369.3049
872.20
535.69
A3P (Urd +
Lentil)
540.00
127.28
-
127.28
190.9426
466.84
339.56
5932.18
1511.92
1826.50
3338.42
2729.68719
4905.13
1566.71
Component
NFSM - Rice
Total
Anticipate
d
Expenditur
e during
2012-13
2806.25
Further
Requirement
of Fund
during
2012-13
396.78
* Audit is going on and Audited UC will be submitted shortly
6
4. A. Physical and Financial Progress under NFSM during 2012-13
MONTHLY PROGRESS REPORT FOR IMPLEMENTATION OF NATIONAL FOOD SECURITY MISSION – RICE DURING 2012-13 TILL 31st Dec., 2012.
(Rs. in Lakh)
Sl.
No.
1
1
Interventions
2
Cluster Demonstrations
(100 Ha each)
(a) Direct Seeded Rice/Line
Transplanting/SRI
(b) Cluster Demonstrations
on Hybrid Rice (One cluster
of 100 ha)
(c) Cluster Demonstrations
on Swarna Sub-1/ Sahbhagi
Dhan of 100 Ha each.
(d) Frontline
Demonstrations by
ICAR/SAUs on Hybrids/
Varieties (Cluster of
Minimum 10 ha each)
Seed Distribution :
(a) Hybrid Rice Seed
Approved Rate of
Assistance
Unit
3
4
Targets approved
by GOI
Phy
Fin
5
6
Achievement
Achievemen Justifica
Report upto31.12.12
t%
tion for
Phy
Fin
Phy
Fin Shortfall
7
8
9
10
Rs 7500/-per Ha
Ha
13500
1012.500
6600
416.2624
6
48.9
Rs 7500/-per Ha
Ha
8000
600.00
5100
337.705
63.7
Rs 7500/-per Ha
Ha
by GOI
Rs 7500/-per Ha
Ha
by GOI
Rs 2000/-per Qtl
Qtls
80
1.60
-
2
(b) HYVs Seeds
Rs 500/-per Qtl
Qtls
80000
-
400.000
44.0
35220
210.10
Non
Availabil
ity of
56.2 seed s in
time
41.1
Anticipated
Expenditure for
12-13
Phy
Fin
7000
525.00
5100
382.50
50000
250.00
On
125000
progress
625.00
Low rate
of
subsidy
Non
availabili
52.5
ty of
seed
Plant and Soil Protection
Management:
3
78869.84 381.2679
4
4
370.9524
76895.53
5
(a) Micronutrients
Rs 500/-per Ha
Ha
125000
625.00
(b) Liming in Acidic Soils
(c) Plant Protection
Chemicals & bio-agents
Rs 500/-per Ha
Ha
-
-
Rs 500/-per Ha
Ha
100000
500.00
Nos
3000
90.00
379
Nos
1000
30.00
110
4a
Cono weeder
4b
Knap Sack Sprayers
Rs. 3000/- per
machine
Rs. 3000/- per
machine
63.1
61.0
76.8
74.2
10.74511
12.6
11.93
3.30
11.0
11.0
-do-do-do-
100000
500.00
3000
90.00
1000
30.00
Contd…….
7
MONTHLY PROGRESS REPORT FOR IMPLEMENTATION OF NATIONAL FOOD SECURITY MISSION – RICE DURING 2012-13
TILL 31st Dec., 2012.
(Rs. in Lakh)
Sl.
No.
Interventions
1
2
Approved Rate
of
Assistance
3
Rs 10000/-per
pump set
5
Incentive for Pump Sets
6
Cropping System based
trainings
7
(a) Project Management Team &
Rs 6.36 lakh
Other Miscellaneous Expenses at
per District
District level
Rs 3500/- per
Session
Rs. 14,000/- per
Training
Unit
Local Initiative
(Check Dam)
Total Financial (1 to 8)
Achievement
Report
upto31.12.12
Achievement
%
Phy
Fin
Phy
Fin
Phy
Fin
4
5
6
7
8
9
10
Nos.
2000
200.00
220
22.0
11.0
11.0
Nos.
250
35.000
172
24.08
68.8
No. of
District
8
50.880
8
28.50
1
13.870
1
6.16545
8
104.00
3662.85
(b) Proect Management Team &
Rs 13.87 lakh
Other Miscellaneous Expenses at
per State
State level
8
Targets
approved by
GOI
No. of
district
Justificat
ion for
Shortfall
Anticipated
Expenditure
for 12-13
Phy
Fin
-do-
2000
200.00
68.8
-do-
250
35.000
-
56.0
-do-
8
50.880
-
44.4
-do-
1
13.870
8.00
7.7
-do-
8
104.00
1819.078
41
49.7
2806.25
8
4. B. Physical and Financial Progress under NFSM during 2012-13
MONTHLY PROGRESS REPORT FOR IMPLEMENTATION OF NATIONAL FOOD SECURITY MISSION – WHEAT DURING 2012-13
TILL 31st Dec., 2012.
(Rs. in Lakh)
Sl.
No.
1
1
2
3
4
Interventions
Approved
Rate of
Assistance
2
3
Cluster Demonstrations (100 Ha each)
on Conservation Agriculture by State
Department of Agriculture with
Technical backstopping of ICAR/SAUs
Rs 12500/(Direct seeded rice –wheat system)
per ha
Approved norms for Rice and Wheat =
Rs. 7500/- and Rs 5000/- (hence for
sytem Rs. 12,500/- per ha)
Demonstrations of Drainage
Management in Waterlogged Areas for Rs 12500/Rice-Wheat System (Project based
per ha
smallest unit to be kept 100 Ha)
Demonstrations on Frontline
Rs. 5000/-per
Technologies-Varieties/ RCTs in
Ha
Wheat
Distribution of Certified Seeds of
Improved Varieties
Final Targets
approved by
GOI
Achievement
up to
31.12..2012
4
Phy
5
Fin
6
Phy
7
Fin
8
Ha
550
68.75
550
56.25
Unit
Ha
by GOI
Ha
by GOI
Anticipated
Expenditur
Achievement % Justifica
e during
tion for
12-13
shortfall
Phy Fin
Phy
Fin
9
10
100
79.99
On
progres
s
550
68.
75
Rs 500/-per
Qtl
Qtls
1700
85.000
0
2719 19.035
15.99
22.4
Non
availabili
13.
2600
ty of
00
seeds
Rs 500/-per
ha
Ha
4000
200.00
0
4127 199.99
1
628
100.0
100.0
On
4000 200
progres
0
.00
s
3500
175.00
0
3755
175.00
0
100.0
100.0
-doContd…….
Need Based Plant/Soil Management:
(a) Micronutrients
5
(b) Gypsum
(c) Plant Protection Chemicals & bioagents
Rs 500/-per
ha
Rs 500/-per
ha
Ha
Ha
3500 175
0
.009
MONTHLY PROGRESS REPORT FOR IMPLEMENTATION OF NATIONAL FOOD SECURITY MISSION – WHEAT DURING 2012-13
TILL 31st Dec., 2012.
(Rs. in Lakh)
Final Targets
Achievement up
approved by
to 31.12..2012
GOI
Achievement
%
Justific
ation
for
shortfal
l
Anticipated
Expenditure
during 12-13
Sl.
No.
Interventions
Approved
Rate of
Assistance
Phy
Fin
Phy
Fin
Phy
Fin
1
2
3
4
5
6
7
8
9
10
Rs 3000/-per
Machine
Nos
2000
60.00
350
10.50
17.5
17.5
-do-
2000 60.00
(a) Pump sets
Rs 10000/per Machine
Nos
750
75.00
110
11.00
14.7
14.7
-do-
750
75.00
(b) Sprinklers
Rs 7500/-per
ha
Ha
500
37.50
-
-
500
37.50
Rs 3500/Session
Rs 14000/Training
Nos
80
11.20
48
6.72
80
11.20
(a) Project Management Team & Other
Miscellaneous Expenses at District
level
Rs 6.38 lakh
per District
No of
District
4
25.52
19.86
77.8
25.52
(b) Project Management Team & Other
Miscellaneous Expenses at State level
Rs 13.87
lakh per
State
No of
State
1
13.870
12.00
86.5
13.87
0
4
80.000
20.00
25.0
831.84
530.36128
63.8
6
Unit
Phy
Fin
Resource Conservation
Machineries/Energy Management:
(a) Knap Sack Sprayers
Efficient Water Application Tools:
7
8
Cropping System based trainings
(Four Sessions .i.e. one before Kharif,
One each during kharif and rabi crops
and one after Rabi harvest)
60.0
60.0
-do-
Miscellaneous Expenses
9
10
Local Initiatives(Check dam & Wheat
Thresher)
TOTAL FINANCIAL (1 to10)
80.00
0
759.8
4
10
4. C. Physical and Financial Progress under NFSM during 2012-13
MONTHLY PROGRESS REPORT FOR IMPLEMENTATION OF NATIONAL FOOD SECURITY MISSION – PULSE DURING 2012-13
TILL 31st Dec., 2012.
(Rs. in Lakh)
Sl.
No.
1
1
Interventions
2
Distribution of certified seeds
a) For varieties less than 10 yrs
b) For varieties more than 10 yrs
2
Demonstrations on Improved Technologies
a) Cluster Demonstrations (100ha each) on
Inter cropping / Improved varieties / Farm
Implements like Ridge Furrow Makers /
Seed Drills
b) FLD by ICAR / SAU in a cluster of 10 Ha
each
Integrated Nutrient Management:
(a) Micronutrients
3
(b) Lime / Gypsum / 80 % WG
(c) Rhizobium Culture / PSB distribution /
Micorrizha
Integrated Management
a) IPM Package
4
b) Distribution of NPV
c) Distribution of PP Chemicals
d) Weedicide
Approved
Rate of
Assistance
3
Rs. 2200/per Qtl.
Rs. 1200/per Qtl.
Targets
Achievement up
approved by
to 31.12.2012
Unit
GOI
Phy
Fin
Phy
Fin
4
5
6
7
8
8.2
8.2
21.1
26.7
75.9
72.15
On
Progress
4000
200.00
8863.06 43.85262 88.6
87.7
-do-
10000
50.00
87.7
84.5
-do-
10000
10.00
25.36905 68.7
67.7
-do-
5000
37.50
1.95436
1000
2.50
6000
30.00
3000
15.00
1.10
4.1
Qtl.
150
1.80
31.64
Rs. 5000/per ha
ha
4480 224.00
Rs. 5000/per ha
ha
Rs 750/-per
Ha
Rs 250/-per
Ha
Rs 500/-per
Ha
Rs 500/-per
Ha
Anticipated
Expenditure for
12-13
Phy
Fin
Fin
10
50
3400
0.0902
0
.47984
161.61
Non
availability
of Certified
seed
5
100
0.11
2
.00
by
GOI
Ha 10000 50.00
Ha
Justificati
on for
shortfall
Phy
9
Qtl.
Rs 500/-per
Ha
Rs 750/-per
Ha
Rs 100/-per
Ha
Achievement %
*
Ha 10000 10.00
8771
8.4473
Ha
5000
37.50
3434
Ha
1000
2.50
701.15
70.1
78.2
Ha
6000
30.00
5326.69 26.30599 88.8
87.7
Ha
3000
15.00 1286.772 6.13441
42.9
40.9
-do-do-do-
Contd…….
11
4. C. Physical and Financial Progress under NFSM during 2012-13
MONTHLY PROGRESS REPORT FOR IMPLEMENTATION OF NATIONAL FOOD SECURITY MISSION – PULSE DURING 2012-13
TILL 31st Dec., 2012.
(Rs. in Lakh)
Sl.
No.
1
5
Interventions
2
Resource Conservation
Machineries/Energy Management:
(a) Knap Sack Sprayers
Approved
Rate of
Assistance
3
Targets
Achievement up
approved by
to 31.12.2012
Unit
GOI
Phy
Fin
Phy
Fin
4
5
6
7
8
Rs 3000/-per
Nos 1500
Machine
45.00
Achievement %
Phy
9
Fin
10
Justificati
on for
shortfall
Anticipated
Expenditure for
12-13
Phy
Fin
164
4.92
10.9
10.9
-do-
1500
45.00
7
0.525
7.0
7.0
-do-
100
7.50
273
27.3
10.9
10.9
-do-
2500
250.00
50
7.50
33.3
33.3
-do-
150
22.50
38
5.32
59.4
59.4
-do-
64
8.96
Efficient Water Application Tools:
(a) Distribution of Sprinklers
6
7
8
9
c) Incentive for Pump sets
d) Pipe for Carrying water from source to
the field
Cropping System based trainings (Four
Sessions .ie one before Kharif, One each
during kharif and rabi crops an one after
Rabi harvest)
Miscellaneous Expenses
Rs 7500/-per
ha
100
7.50
ha
Rs 10000/Nos 2500 250.00
per Machine
Rs. 15000/22.50
Nos 150
per Farmer
Rs 3500/Session
Nos
64
8.96
Rs 14000/Training
(a) PMT & Other Miscellaneous Expenses
at District level
Rs 4.47 lakh
per District
No.
of
Distr
ict
5
22.35
9.48613
42.4
22.35
(b) PMT & Other Miscellaneous Expenses
at State level
Rs 6.28 lakh
per State
No
1
6.28
3.00
47.8
6.28
c) Misscellaneous Expenses to State for
Other Districts
No.
Rs. 1.00 lakh of
per District
Distr
ict
13
13.00
7.01
53.9
-do-
13.00
150.00
0.00
369.3049
20.0
-do-
150.00
Local Initiatives
TOTAL FINANCIAL (1 to 9)
897.49
3
41.13
872.20
12
4. D. Progress Report of A3P under NFSM – Pulse in West Bengal during 2012-13 up to 31st Dec., 2012
Target
Sl.
No.
1.
Crop
Achievement
No. of
Financial (Rs. in lakh)
A3Punit
Phy
Cost of
Cost of
(100 ha )
(
Area
Block
e-pest
sanctione
in ha ) Demonstrat surveill Total
d
ion
ance
Black
gram
20
60
2000
6000
93.00
3.00
96.00
(@ Rs.
4650/ha)
(@ Rs.
150/ha)
(@ Rs.
4800/ha)
289.80
10.20
300.00
(@ Rs.
4830/ha)
(@ Rs.
170/ha)
(@ Rs.
5000/ha)
139.50
4.50
144.00
Financial (Rs. in lakh)
Phy
Cost of Cost of
( Area
Block
e-pest
in ha ) Demonst surveill
ration
ance
Total
700
22.841
-
22.841
6000
168.1016
-
168.1016
2.
Lentil
3.
Summer
Moong*
30
3000
(@ Rs.
4650/ha)
(@ Rs.
150/ha)
(@ Rs.
4800/ha)
-
-
-
-
TOTAL
110
11000
522.30
17.70
540.00
6700
190.9426
-
190.9426
* Season yet to come
13
5. Major Focus given by the State on different Inputs under NFSM

Supply of Quality Seeds and other inputs

Application of micronutrients based on Soil Nutrient Map and Soil Test
Report.

Timely supply of inputs.

Well ahead Selection of site and beneficiary.

Demonstrations organized to motivate the farming community with
modern Resource conservation technologies / Tools / Efficient and
judicious water application tools.

Organization of FFS for dissemination of improved technologies and to
select progressive contact farmer.
14
6. Progress of A3P during Kharif and Rabi 2012-13
Season
No of units (@
100 ha)
allocated
No of units
Expenditure
implemented by
Incurred
state
(Rs. in Lakhs)
Kharif (Black
Gram)
20
7
22.841
Rabi (Lentil)
60
60
168.1016
Rabi-Summer
(Moong)
30
Season yet to
come (February)
-
Total
110
67
190.9426
15
7. Status of Implementation of pest Surveillance in A3P units of 2011-12 and 2012-13
Status of Implementation during 2011-12
Sl.
No.
Crop
No. of A3P unit
Sanctioned
Physical (Area in ha)
Achievement under epest surveillance
Target
Achievement
Physical
Financial (Rs.
in lakh)
1
Black Gram
3 (Maldah, Nadia,
Purulia)
3000
1000
1000
1.784
2
Lentil
2 (Nadia,
Murshidabad)
2000
2000
1000
0.992
Total
5
5000
3000
2000
2.776
Status of Implementation during 2012-13
 Pest surveillance programme has not been implemented during Kharif,
2012-13 as the separate programme has not been received till date.
8.

Implementation of Special Plan to achieve 19+ Million Tones of Pulse
Production during Kharif, 2012-13
Allotment on sprinklers was sanctioned under the scheme. But due to
high precipitation in the state, sprinklers are not popular. As such, no
action plan was submitted.
17
9.

Physical and Financial Progress under Action Plan for Additional
Area coverage of Pulses during Rabi / Summer under NFSMPulses during 2012-13
No Allotment was given to the state of West Bengal.
18
10a. Input Planning for Summer Rice under NFSM 2012-13
Planned
physical
target
Supply tie up status
Sl.
No.
Intervention
1
Hybrid
MT
76.50
63.00
2
HYV
MT
15695
on going
3
Micro Nutrient
Ha
67048
on going
4
PP Chemical
Ha
30895
on going
5
Cono-Weeder
+ Knapsack
Nos.
3590
on going
6
Pump Set
Nos.
1780
on going
Unit
Supplied
Supplying Agency
Supplying agencies like NSC,
WBSSC, CADC, WBAIC, BENFED &
other Private sector producers &
manufacturers have been sensitized
for timely supply of inputs upto Block
level. District Agril. Officers have
been authorized to procure the input
19
10b. Input Planning for Summer Pulses under NFSM 2012-13
Planned
Supply tie up status
physical
target Supplied Supplying Agency
Sl.
No.
Components
Unit
1
Seed
MT
54.00
On going
2
Micro Nutrient
ha
3540
On going
3
Rhizobium
ha
3280
On going
4
IPM
ha
2310
On going
5
PP Chemical
ha
6
Knapsack
Nos.
1366
On going
7
Pump Set
2277
On going
8
PVC Pipe
Nos.
Units of 800
meter
104
On going
1968
On going
Supplying agencies like NSC,
WBSSC, CADC, WBAIC,
BENFED & other Private sector
producers & manufacturers
have been sensitized for
timely supply of inputs up to
Block level. District Agril.
Officers have been
authorized to procure the
input
20
11. Status of Online Submission of Progress Report at State
/ District Level

All the districts submit their report through Online to the
State Head Quarter.
21
12. NFSM- PMT status in the state/ districts
No. of
consultants
sanctioned
State
level
5
District
level
17
No. of
consultants
engaged
State
level
1
District
level
8
No. of STA/ TA
sanctioned
No. of STA / TA
engaged
State
level
State
level
6
District
level
58
2
District
level
13
Reasons for not
engaging the PMT
in full strength
Due to
insufficient
allotment, full
strength of PMT
could not be
engaged
22
13. Concurrent Evaluation of NFSM


Concurrent Evaluation has been done during
2008-09
Actions already taken for evaluation during
2012-13
23
14. Specific Issues and Suggestions
Sl.
No
Issues / Suggestions
1
Rate of Assistance for distribution of seeds under subsidy
may be increased from Rs. 2000/- per qtl to Rs. 5000/- per qtl
in case of Hybrid rice seed.
The Assistance rate for distribution of HYV rice seeds may be
increased from Rs. 500/- per qtl to Rs. 1000/- per qtl.
The Rate of Assistance for distribution of Pulse seeds under
subsidy may be increased from Rs.1200/- per qtl to Rs. 5000/per qtl.
2
Due to low availability of certified pulse seeds, utilization
of TL seeds may be permitted.
3
Attempts are being taken up to popularize the Mini Dal
Mill for value addition to the produce of the pulse farmers.
4
Amount of assistance for 100 ha cluster DC may be
enhanced
24
25
26
27