Transcript Slide 1
11th Meeting of NFSM-EC 18th January, 2013 at AJC Bose Hall , Krishi Bhavan, New Delhi Assam Agriculture – Basic Information Net Cropped Area 28.11 lakh hectare (36 p.c. of Geographical Area) Grossed Cropped Area 40.99 lakh hectare Cropping Intensity 146 p.c. Rice area (2011-12) covered by HYV 67% of total Rice area. Rice area covered by Hybrids 3.6% of total Rice area Area under Pulses (2011-12) 1.32 lakh hectare (3.2% of Gross Cropped Area) Per capita land holding 1.11 hectare (as per 2005-06 Agriculture Census) Availability (2011-12) of Farm Power 1.02 HP per hectare Area under Assured Irrigation 29% of Net Cropped Area (2011-12) Consumption (2011-12) of Fertilizer 74.58 Kg. per hectare Cropwise comparative productivity Crop Productivity (Kg. per hectare) 200607 200708 200809 200910 201011 201112 2012-13 (anticipat ed / target) Rice 1349 1428 1638 1765 1983 1977 2032 Wheat 1132 1263 1300 1087 1256 1209 1425 Maize 744 725 726 718 714 802 1070 Pulses 542 544 617 560 557 590 630 1298 1393 1599 1688 1893 1910 1920 497 524 574 529 581 563 692 1744 1976 1939 1967 1808 1669 1685 39634 38075 38387 39110 36196 37055 37750 Foodgrains Oilseeds Jute Sugarcane Cropwise production estimates during 2012-13. (lakh MT) Sl. Crop No. As per 2nd advanced estimates by SASA As per departmental assessment 37.79 41.70 1 Kharif Rice 2 Kharif Pulses 0.46 0.48 3 Kharif Oilseeds 0.12 0.19 4 Jute 1.08 1.16 5 Sugarcane 10.65 11.34 6 Rabi/Summer Rice 9.90 12.80 7 Wheat 0.57 0.66 8 Maize 0.14 0.31 9 Rabi Pulses 0.65 0.67 10 Rabi Oilseeds 1.66 2.23 Note : Production estimates based on CC Experiments are not yet done by SASA. Expenditure 1. NFSM-Rice : statement of NFSM, 2012-13 ( Rs in Lakh) Sl. Particulars No. Approved By GOI 1 Approved by GOI 3094.425 2 Fund Released by GOI 2326.840 3 Expenditure incurred (up to 31st Dec, 2012) 2323.103 4 Balance 8.737 Statement of Expenditure of NFSM Pulses & A3P during the year 2012-13 ( Rs in Lakh) Sl. No. Components 2 3 NFSM- Pulse A3P (Kharif 10 units) (Rabi 10 units ) Approved Fund released Fund yet to be by GOI by GOI received 644.160 29.48 614.68 48.000 50.000 42.05 -- 5.95 50.00 Likely /anticipated Expenditure During 2012-13 SL. No. Programme 1 A3P Rabi (Lentil) 2 NFSM- Pulses 3 NFSM-Rice Sl. No. Programme 1 A3P Rabi Blackgram) a) NFSM- Pulses b) Additional Pulse Programme of NFSM Pulse NFSM-Rice 2 3 Likely expenditure during 2012-13 Balance of Released Yet to receive fund - Rs 50.00 lakh Lakh Rs 614.68 lakh Rs 8.737 Lakh Rs 767.585 Lakh Rs 5.00 Anticipated expenditure during 2012-13 Balance fund Yet to receive (Summer Rs 48.00 lakh Rs 5.00 Lakh - Rs 614.68 lakh Rs 350.00 Lakh Rs 8.737 Lakh Rs 767.585 Lakh Requirement of fund during 2012-13 (Rs in Lakh) SL. Programme No. 1 2 3 A3P Rabi (Summer Black gram) NFSM- Pulses a) Additional Programme b) Pump set (Additional demand ) NFSM-Rice a) Pump sets (Additional demand ) Requirement Additional as per GOI requirement approval * Rs 48.00 Rs 614.68 Rs 350.00 - - Rs 130.00 Rs 767.585 - Rs. 2540.00 Total Fund Requirement Rs 48.00 Rs 1094.68 Rs 3307.585 * Against allocation of Rs 50.00 lakh for lentil no fund is received. It is proposed to utilize the fund against A3P during Rabi (Summer Black gram) Physical & Financial Progress under NFSM –Rice during 2012-13 (Rs in lakh) Interventions Direct seeded Rice / Line Transplanting / SRI Cluster demonstration of Hybrid Rice Hybrid Rice Seed Distribution HYV Seed Distribution Micronutrient Liming Acidic Soils PP chemical Conoweeder Knap sack Sprayers Rotavators Unit ha Final Target approved by GOI Phy Fin 8215 616.125 Achievement Phy Fin 8215 616.125 ha 4930 369.75 4930 369.75 qtl 1150 23.00 1150 23.00 qtl ha ha ha No. No. No. 40000 32000 30000 32000 5000 4000 300 200.00 160.00 150.00 160.00 150.00 120.00 90.00 40000 29632 200.00 80.00 16006 80.03 10096 - 93.388 Physical & Financial Progress under NFSM –Rice during 2012-13 Interventions Incentive for Pump sets Cropping System based training (four sessions i.e one before Kharif one each during kharif and Rabi crops and one after rabi harvest) District level Project Management Team(PMT) & other Miscellaneous Expense State level Project Management Team(PMT) & other Miscellaneous Expense Local initiatives 1. Pipe for carrying water 2. Seed bin 3. Water harvesting structure Total : Unit Final Target Achievement approved by GOI Phy Fin Phy Fin No. 7000 700.00 7000 700.00 No. 100 14.00 73 10.22 Nos Nos Nos 13 82.68 13 41.34 1 13.87 1 10.15 326 1982 26.00 48.90 99.10 4129 99.10 52.00 3094.425 2323.103 Physical & Financial Progress under NFSM Pulses 2012-13 Interventions Unit Distribution of Certified seeds. a.) For varieties less than 10 years. Qtl. b) For varieties more than 10 years Qtl. old. Demonstrations on improved Technologies: Cluster Demonstrations (of100 ha ha. each) on inter-cropping/improved varieties/farm implements like Ridge Furrow makers /Seed drills. Integrated Nutrient Management. a) Micro-nutrients. ha b) Lime /Gypsum 80% WG Sulphur. ha (c)Rhizobium Culture / Phosphate ha Solubilising Bacteria Sub-Total INM : Final Targets Achieveme Approved by nt GOI Phy Fin Phy Fin 1600 4800 35.20 57.60 1540 18.48 2100 105.00 2000 2000 8000 10.00 15.00 8.00 12000 33.000 Fund not yet received. Financial statement under NFSM – Pulses 2012-13 Interventions Unit Final Targets Approved by GOI Phy Fin Achievement Phy Fin Integrated Pest Management (IPM) (a) IPM Package ha 8000 60.000 (b) Distribution of NPV ha 800 2.000 (c) Distribution of PP ha 8000 40.000 ha 800 4.000 Fund not yet received Chemicals (d) Weedicides Resource Conservation Technologies / Tools: a) Knap Sack Sprayers Nos. 200 6.000 Fund not yet b) Zero Till Seed Drills. Nos. 10 1.500 received g) Rotavators Nos. 25 7.500 Financial statement under NFSM – Pulses 2012-13 Interventions Unit Efficient Water Application Tools : a) Distribution of Sprinkler sets ha b) Incentive for Mobile Sprinkler No. Rainguns c) Incentive for Pump sets No. d) Pipe for carrying water from No. source to the field. Cropping system based No. trainings Miscellaneous Expenses : (a) Project Management Team & No. Other Misc. Expenses at District of Level. Dist. (b) Project Management Team & No. Other Misc. Expenses at State of Level. State Final Targets Achievement Approved by GOI Phy Fin Phy Fin 80 30 6.00 Fund not yet 4.50 received 100 10.00 100 15.00 42 5.88 Fund not yet received 10 44.70 1 6.28 10.00 1.00 Financial statement under NFSM – Pulses 2012-13 Interventions Local Initiatives (Water charges for two protective irrigations may be supported under local initiative to the farmers /groups given mobile sprinklers.) (1)Demonstration on Mobile Sprinkler Rainguns (2) Seed Bin (capacity 1 qtl) (3) Water Harvesting Structure Total Financial : Unit Final Targets Achievement Approved by GOI Phy Fin Phy Fin No. No. No. 20 3600 50 10.00 Fund not yet 90.00 received 100.00 644.16 29.48 Major focus given by the State on different inputs under NFSM 1. Distribution of certified seeds under NFSM & other programmes has resulted an increase in Seed Replacement Rate of Rice from 47% to 50 % during 2011-12. 2. Additional area of 14,000 ha. has been brought under assured irrigation by providing of 7000 Pump sets during the year 2012-13. 3. Micronutrients have been applied in an area of 29,632 ha. under Rice during 2012-13. 4. 1150.00 qtl. of popular varieties of Hybrid Rice seeds distributed at subsidized rate to cover an area of 7670 hectares. 5. 10,096 nos. of Knapsack rate. Sprayers distributed at subsidized Component specific Physical & Financial Progress Report of A3P during Kharif 2012-13. Item Unit Seed minikit (4 kg kit) Lime Micronutrient (Zinc sulphate) Rhizobium culture PSB culture Urea (for foliar spray) Fungicides for seed treatment (i) Thirum (ii) Carbendazim Bio pesticides NSKE 5% Weedicides Pendemethalene 30EC E-Pest surveillance Need based pesticides Total No. MT MT Physical Tar. Ach. 1000 1000 250.00 250 20.00 20.00 Financial Tar. Ach. 4.00 4.00 10.00 10.00 8.40 8.40 MT MT MT 1.50 1.50 10.00 1.50 1.50 10.00 1.875 1.875 0.60 1.875 1.875 0.60 Kg kg Lit Lit 50.00 25.00 1500 2500 50.00 25.00 1500 2500 2.00 2.00 2.90 7.60 2.90 7.60 No Lit 1 no 224 lit 1 no 224 lit 2.80 42.05 2.80 42.05 Status of implementation of pest surveillance in A3P unit (2011-12 & 2012-13) Year 2011-12 Name of Crops Blackgram (Kharif) Lentil (Rabi) 2012-13 Blackgram (Kharif) Physical (no. of unit) Financial (Rs. in lakh) Target Achiv Alloc Exptd. *5.250 5.250 7.86 7.86 *3.00 3.00 5.10 5.10 **10 * One unit = 1000 ha. ** One unit = 100 ha. - Fund not received Physical & financial progress of additional area coverage of Pulses during Rabi / Summer, 2012-13. Addl. Govt.of India approved area Additional allocation proposed Componen Phy Fin by the t State 50000 ha Total : State proposed additional allocation Component Rate of Unit Assista nce (Rs.) INM 10000 125.00 INM Package package @ ha (i) Lime 750/ ha ha 1250 per (ii) Micronutrient 500/ha ha ha (iii) Assistance for 100/ha ha Rhizobium Culture / Phosphate solubilising bacteria distribution IPM 10000 75.00 IPM Package package @ ha (i) Pheromone Trap 15/- no 750 per ha (ii) Bedo Lure 28/- pair (iii) NPV (H)( 250 313/- ml. ml) (v) Azadiractin 165/- lit (0.15%) (vi) T. Viride (500g) 24.90 gm Distributio 1000 150.00 Distribution of Water 1500/- no n of Water Carrying pipes Carrying pipe @ 15000 per farmer 350.00 Phy Fin 10000 8000 10000 75.00 40.00 10.00 70,000 1,40,000 800 lit 10.50 39.20 10.00 9000 lit 14.85 903 kg 0.45 10000 150.00 350.00 PLANNING OF SUMMMER RICE AND PULSES CROPS Creation of additional assured irrigation facility for additional area under Summer Rice and Summer Pulses. a. Area proposed : Summer Rice : Summer Pulses : Total : b. Requirement of pump sets : Summer Rice : Summer Pulses : Total : 50,800 hectare 2,600 hectare 53,400 hectare 25,400 nos. 1,300 nos. 26,700 nos. Appointment of Project Management Team (PMT) in districts Programme No. of district Consultant Technical Asstts. No. of posts Man in position No. of posts Man in position NFSM-Rice 13 13 nos 8 nos 52 nos 28 nos NFSM – Pulses 10 10 nos 6 nos 20 nos 13 nos 23 nos 14 nos 72 nos 41 nos Total : Trend of Productivity (Kg/ha) of Rice & Pulses in NFSM districts Crop 2006-07 (Base Year) 2008-09 2009-10 2010-11 2011-12 896 982 898 1092 1213 Winter Rice 1161 1384 1658 1949 1748 Summer Rice 1855 2141 2264 2533 2936 Total Rice 1215 1440 1647 1937 1931 Rice : Autumn Rice Pulse : 2009-10 (Base Year) 2010-11 2011-12 567 564 578 Overall impact of NFSM on productivity (Kg/ha) NFSM-Rice Crop Autumn Rice Winter Rice Summer Rice Total Rice 2006-07 2010-11 2011-12 Productivity Productivity % increase Productivity % increase (Base year) after 4 years after 5 years of mission of mission 899 1155 28.5% 1242 38.2% 1321 2017 1993 2577 50.9% 27.8% 1785 2744 35.1% 36.1% 1349 1983 47.0% 1977 46.6% NFSM-Pulse 2009-10 Productivity (Base year) Productivity 560 590 2011-12 % increase in 2 years of mission 5.4% Specific issues and suggestions Subsidy rate for seeds both Rice and Pulses is required to be enhanced considering the present market price of seeds. All the districts of programme. Subsidy rate of Rotavator & Sprinkler Sets up to 50% of the cost. Provision for machineries like Reaper, Harvester may be made under NFSM to overcome labour crisis and also to reduce the cost of production. Considering high cost of Hybrid seeds the cost norms of Hybrid Demonstrations may be enhanced. NFSM-Wheat programme Assam. Assam may be covered under NFSM is to be enhanced is to be introduced in the state of Thank you