SDG&E Generation Additions
Jim Avery
Chief Development Officer
All-Source Local Reliability RFO
• CPUC Authorized SDG&E to procure 500 – 800 MW of local resources
– Resources must be shown they are incremental to assumed additions included in
need study
• RFO Timeline:
–
–
–
–
Released: September 2014
Bids Due: January 2015
Short List: June 2015
File Contracts with CPUC: Q1 2016 (estimated)
• SDG&E’s A.14-07-009 requesting authority to enter into a long-term
Power Purchase Tolling Agreement with the Carlsbad Energy Center
Project was approved by the CPUC in May 2015
– SDG&E’s Advice Letter incorporating the Decision’s requirements was approved in
July 2015
– Application for Rehearing currently pending before the CPUC
– Expected online date November 2017
2
Preferred
Resource Procurement
• The Sunrise Powerlink
– the ultimate super highway to renewables
• 33% RPS in 2015
• RPS – What’s next?
3
Borrego Springs Micro Grid
The project integrates:
• 26 MW central station PV
• 1 MW rooftop solar
• 4.65 MWh central station storage
• 0.15 MWh distributed storage
• 3.6 MW generation
• Advanced switching, protection, and control
capabilities to improve reliability and power
quality
ORANGE
Trabuco
CO.
Capistrano
Laguna
Niguel
Four
230
kV
lines
Cristianit
to SCE
Margarita
Borrego
os
Talega
SAN ONOFRE
NUCLEAR POWER PLANT
RIVERSIDE
CO.
SAN DIEGO
CO.
Pala
Monserate
San Luis Rey
ENCINA
POWER PLANT
Rincon
Wellhead
Escondido
Calpeak
Peaker
Lilac
Ash
Warners
Escondido
Esco
Lake
Hodg Palomar
es PowayEnergy
Pomerado
Creelman
Penasquito Sycamore
Canyon
s
MEF
Los
Coches
El Cajon
Main Street
Borrego Springs was selected for:
• Isolated community of 2,800 customers
• Over 70 miles from EHV transmission network
• Long transmission and radial nature creates
challenges
• High concentration of solar – both distributed
and central station
• Ability to island the entire community
• Replicable utility scale model
Bay Blvd.
Loveland
Calpeak
Peaker
Miguel
Otay Border00
Santa Ysabel
Boulder Creek
Suncrest Descanso
Alpine Substation
Mission
Old Town
Narrows
Valley
Center
Glencliff
BarrettCameron
Otay Lake
MEXICO
To El Centro
(IID)
Kumeyaay
Crestwood
Boulevard
ECO
To North Gila
Substation
IMPERIAL VALLEY
Arizona
TO ROA
(CFE)
4