EDS 4 Release 9.2 Outage Scheduler Kickoff Meeting March 27, 2008

Download Report

Transcript EDS 4 Release 9.2 Outage Scheduler Kickoff Meeting March 27, 2008

EDS 4 Release 9.2
Outage Scheduler
Kickoff Meeting
March 27, 2008
http://nodal.ercot.com
1
Lead from
the front
Texas Nodal
Agenda
•
•
•
•
•
•
Outage Scheduler EDS 4.9.2 Overview:
– Presentation Legend
– Objectives
– Audience
Outage Scheduler EDS 4.9.2 Timeline
– Nodal Summary Release Schedule
– Sandbox Testing
– Test Cases
– Sample Activity Timeline
– Testing Windows
Outage Scheduler EDS 4.9.2 Testing
– Testing Window
– Basic Communications Test
– Digital Certificates
– Support Calls
– Issue Management
Tracking
– Master Schedule
– Preparation Checklist / Schedule
– Dashboard
Reference
– QSE Activity Summary
– Relevant Documents
Q&A
http://nodal.ercot.com
2
Lead from
the front
Texas Nodal
Presentation Legend
• Note: Throughout this presentation, there are several references
to activities required by QSEs with Resources and TSPs on the
Web Services and MIS (RUI)
• For convenience and clarity, the following will apply:
– All activities that apply only to users of the MIS (RUI) will appear in
BLUE
– All activities that apply only to users of the Web Services will
appear in MAROON
– Activities that apply to both the RUI and the Web Services will
remain in BLACK
http://nodal.ercot.com
3
Lead from
the front
Texas Nodal
Outage Scheduler EDS 4.9.2: Audience
Contact [email protected] if:
You should not be on this list <or> You should be on this list but are not
QSEs
AMERICAN ELECTRIC POWER SERVICE CORP
DIRECT ENERGY LP WTU (SQ2)
AMERICAN ELECTRIC POWER SERVICE CORP (SQ3)
EAGLE ENERGY PARTNERS I LP (QSE)
ANP FUNDING I LLC
EXELON GENERATION COMPANY LLC
BPTX (SQ1)
FORMOSA UTILITY VENTURE LTD (QSE)
BPTX (SQ2)
FPL ENERGY POWER MARKETING
BPTX (SQ3)
FPL ENERGY POWER MARKETING INC (SQ3)
BRAZOS ELECTRIC POWER CO OP INC (QSE)
FPLE PMI (SQ1)
BTU QSE SERVICES INC
FPLE_WIND_FPL ENERGY POWER MARKETING INC.(SQ2)
BTU SQ1
FULCRUM POWER SERVICES LP
CALPINE POWER MANAGEMENT LP
IPA MARKETING INC (SQ1)
CITY OF AUSTIN DBA AUSTIN ENERGY (QSE)
LOWER COLORADO RIVER AUTHORITY (QSE)
CITY OF GARLAND (QSE)
NRG TEXAS POWER LLC (QSE)
CITY OF SAN ANTONIO CITY PUBLIC SERVICE (QSE)
OCCIDENTAL POWER SERVICES INC
CITY OF SAN ANTONIO CITY PUBLIC SERVICE CPS WIND (SQ1)
RELIANT ENERGY ELECTRIC SOLUTIONS (QSE)
CONSTELLATION ENERGY COMMODITIES GROUP INC (QSE)
RIO NOGALES POWER PROJECT LP (QSE)
CONSTELLATION ENERGY COMMODITIES GROUP INC B (QSE)
SCURRY COUNTY WIND LP (QSE)
CONSTELLATION ENERGY COMMODITIES GROUP INC C (QSE)
STEC - SOUTH TEXAS ELECTRIC COOP (QSE)
CORAL POWER LLC
SUEZ ENERGY MARKETING NA INC
CORAL POWER LLC (SQ2)
TENASKA POWER SERVICES CO
DIRECT ENERGY LP
TRQ1 (SQ1)
http://nodal.ercot.com
4
Lead from
the front
Texas Nodal
Outage Scheduler EDS 4.9.2: Audience
Contact [email protected] if:
You should not be on this list <or> You should be on this list but are not
TSPs
TOPAZ POWER MANAGEMENT LP (QSE)
AMERICAN ELECTRIC POWER SERVICE CORP
TOPAZ POWER MANAGEMENT LP (SQ1)
AUSTIN ENERGY
TXU PORTFOLIO MANAGEMENT COMPANY LP (QSE)
CITY OF GARLAND
TXU PORTFOLIO MANAGEMENT COMPANY LP (SQ1)
CPS CITY OF SAN ANTONIO
WESTAR (SQ1)
BRAZOS ELECTRIC POWER CO OP
BRYAN TEXAS UTILITIES
MAGIC VALLEY ELECTRIC CO OP
BROWNSVILLE PUBLIC UTILITY BOARD
RAYBURN COUNTY ELECTRIC
TEXAS NEW MEXICO POWER
TEXAS MUNICIPAL POWER AGENCY
SOUTH TEXAS ELECTRIC CO OP (1)
LOWER COLORADO RIVER AUTHORITY
CITY OF DENTON
CITY OF COLLEGE STATION
MEDINA ELECTRIC COOP
ONCOR ELECTRIC DELIVERY COMPANY
CENTERPOINT
GREENVILLE ELECTRIC UTILITY SYSTEM
SOUTH TEXAS ELECTRIC CO OP (2)
http://nodal.ercot.com
5
Lead from
the front
Texas Nodal
EDS 4.9.2 Sandbox testing timeline
Feb
Application
Components
Mar
Apr
3/21 - V1.10
May
Jun
4/1 - V1.11 (unapproved)
Nodal Sandbox - Loopback
EWS
4/21 – V1.11 (approved)
•
•
•
EWS
Outage Creation
Outage Cancellation
Outage Query
RUI
4/15
EWS & RUI
Application
Components
•
•
•
•
•
•
•
6/13
OS Connectivity and Submission Testing
Outage Creation
Outage Cancellation
Outage Query
Nodal Sandbox contains External Web Services pertinent to Outage Scheduler. If you will be using the Web Services
to connect to Outage Scheduler, please use the Sandbox to verify connectivity and XML structures
All Outage Scheduler web services currently conform to External Interface Specification V1.10
Changes to the following services will be deployed to Sandbox on 4/1
•
Outage Creation
•
Outage Cancellation
•
Outage Query
If you have any questions, please contact EDS 4 team – [email protected]
http://nodal.ercot.com
6
Lead from
the front
Texas Nodal
EDS 4.9.2 RUI timeline
Feb
Mar
Apr
May
Jun
4/15
RUI
•
•
•
•
•
•
•
•
•
•
Application
Components
EWS
RUI
RUI
Outage Creation (all outage types)
Grouped outages
Recurring Outages
View Summary
Edit Outage (Simple / Group)
Remove items from Group
Forced & Unavoidable extensions
Advanced filtering
Pagination
4/15
Export
EWS & RUI
Application
Components
•
•
6/26
•
•
•
•
•
•
•
Print
Help
Warnings
Copy Outage
6/13
OS Connectivity and Submission Testing
Outage Creation
Outage Cancellation
Outage Query
MPs will be able to perform all EDS test scenarios using the RUI starting 4/15/2008
If you have any questions, please contact EDS 4 team – [email protected]
http://nodal.ercot.com
7
Lead from
the front
Texas Nodal
Outage Scheduler 4.9.2 Timeline
•
•
EDS 4 9.2 will now start on 4/15
The focus of this presentation will be primarily on EDS 4 9.2.2 – OS Connectivity and Submission Testing
m
Jan
Feb
Mar
2008
May
Apr
Jun
Jul
Aug
Sep
Oct
Nov
Dec
m 2009
Jan
Feb
Single Entry Model Go-live 6/1/2008
OS Pre-FAT
OS FAT
UI development
OS Sandbox 1/15/2008 - 6/30/2008
CDR reports for Outage Scheduler 4/1/2008 (Approved, Rejected, Submitted, Withdraw n, Cancelled)
EDW Reports for Outage Scheduler 8/31/2008 (Planned vs Actual)
OS EDS 9.2
4/1/2008 - 8/1/2008
9.2.1 FOD 4/1/2008 - 5/9/2008
9.2.2 Connectivity/Submission test 4/1/2008-6/13/2008
9.2.3 Performance tests 6/16/2008 - 6/27/2008
9.2.4 OS/OE interface 6/2/2008 -8/1/2008
9.2.5 OS interfaces in EDS 4/14/2008 -8/1/2008
9.2.6 OS postings in MIS 5/2/2008 -8/1/2008
Begin 168-hr test 9/1/2008
Nodal Go-live 12/1/2008
*
* *
#
#
#
* Downloads of the Zonal OS into the Nodal OS (3/28, 4/28, 5/16)
# Downloads of the Zonal OS into the Nodal OS followed by dual-entry of Outages by Market Participants (6/9, 7/7, 8/29)
http://nodal.ercot.com
8
Lead from
the front
Texas Nodal
Outage Scheduler EDS 4.9.2: Objectives
EDS
Phase
Description
Phase Objectives
9.2.1
Forced Outage Detection
•Verify the ability of the EMS to receive outage list from OS
•Verify the automation and timing of information from the OS to the EMS
•Verify the FOD capability of the EMS
9.2.2
Connectivity / Submission
test
•Verify MIS connectivity (if applicable)
•Verify EWS connectivity (if applicable)
•Verify MP’s ability to enter outages
•Verify ERCOT’s ability to approve single and group outages
•Verify QSE/TSP ability to receive updates on outage status
9.2.3
Validation of Performance
•Verify OS ability to receive a specified quantity of data from multiple sources
simultaneously via both the RUI and the EWS
•Verify OS data available for real-time reports
9.2.4
Validation of Outage
Evaluation in EDS
•Verify OS ability to send outage requests for the time period defined by the EMS
user.
•Verify OS ability to receive outage status changes from the OE
9.2.5
Validation of Outage
Scheduler Interfaces
•Verify outage transfers from the OS into the DA TSA
•Verify outage transfers into RUC
•Verify outage transfers to all other uses of OS information
9.2.6
Validation of Outage
Postings in MIS
•Verify outage transfers from the OS into the MIS
•Validate MIS Secure Area access to Market Participants with the appropriate
Digital Certificate
•Verify performance
http://nodal.ercot.com
9
Lead from
the front
Texas Nodal
Outage Scheduler EDS 4.9.2: MP Involvement
EDS
Phase
Description
Start
End
MP participation
9.2.1
Forced Outage Detection
Apr 15,
2008
May 23,
2008
Not required
9.2.2
Connectivity / Submission test
Apr 15,
2008
Jun 13,
2008
Yes – 2 hour testing window per MP
9.2.3
Validation of Performance
Jun 16,
2008
Jun 27,
2008
Yes - submit outages from 9AM – 11AM for up
to 2 weeks
9.2.4
Validation of Outage
Evaluation in EDS
Jun 02,
2008
Aug 01,
2008
Not required
9.2.5
Validation of Outage
Scheduler Interfaces
Apr 29,
2008
Aug 01,
2008
Not required
9.2.6
Validation of Outage Postings
in MIS
May 02,
2008
Aug 01,
2008
Yes - MPs are required to download and
validate Outage Scheduler reports posted on
MIS
http://nodal.ercot.com
10
Lead from
the front
Texas Nodal
Outage Scheduler 4.9.2 Testing: Support Call Test Cases for Connectivity and
Submission testing
TSPs
QSEs with Resources
Create / Query / Update / Cancel
Create / Query / Update / Cancel
Planned Outage
• Unavoidable extension
• Recurring outage
Planned Non-Reliability Generation Outage
• Unavoidable extension
Planned Outage Group
• Unavoidable extension
• Recurring outage
Planned Non-Reliability Generation Outage Group
• Unavoidable extension
Remedial Switching Action
Opportunity Outage
Forced Outage on an equipment
• Forced extension
Planned Reliability Generation Outage
• Unavoidable extension
Opportunity Outage
Planned Load Resource Outage
• Unavoidable extension
Maintenance Level (1, 2, or 3) on a single piece of
equipment
• Unavoidable extension
Forced Outage
• Unavoidable extension
Simple Outage on an equipment
• Unavoidable extension
•
Each of the outage types may require multiple outage entries to ensure we can test the entire workflow
•
OS Submissions Test Scripts document to be posted on Readiness Center on 4/2/08 will provide further details
http://nodal.ercot.com
11
Lead from
the front
Texas Nodal
Outage Scheduler 4.9.2 Timeline: Example Activity Timeline
Apr 2008
Mar 2008
3/27/08
EDS
TIMELINE
May 2008
Jun 2008
4/4/08
Kick Off MP Sign-Up
Meeting Deadline
6/13/08
4/15/08
EDS 4.9.2 Outage Scheduler Connectivity and Submission Testing
Example Activity Timeline
3/25/2008 - 4/1/2008
2 weeks prior
MP Sign
Up via
Email
Example
Activity
Timeline
1 week prior
Pre-Test Activities
- MP Sends Sample XML
- ERCOT performs pre-test
validation
- ERCOT Provides Digital Cert
(if Required)
- etc...
Perform Basic Ping Test
- Not Required if participated
in NOMCR, EDS 3 or EDS 4
- Basic Ping / Telnet
- Verify Digital Certificate
- Up to 1 wk < test window
Mon
- 9am-11am
Support Call
- Scripted Test
- Problem
Resolution
http://nodal.ercot.com
12
Duration to Make-up
Window will Vary
2 Hour
Testing Window
Make-Up and
Support Window
3/25/2008 - 4/1/2008
Sample 2 Hour Testing Window
Tues – Sun
- 7 day priority support period /
self-guided testing
- Issue resolution via:
[email protected]
- Completion report received by
end of test period
Through 3/31/08
- QSEs and TSPs may continue to
test openly
- Support will continue but
will prioritize those in 7
day support period
Lead from
the front
Texas Nodal
Outage Scheduler 4.9.2 Testing: Testing Window
• QSEs and TSPs are required to sign up via email for a
testing window
– This will initiate a number of events that will occur before the
Testing Window (detailed in a later slide)
– Testing Window includes:
•
•
•
•
2 hour support and scripted testing call
Resolution of issues during the 2 hour support call
7 calendar days testing window for prioritized support and self guided testing
Optional self guided testing are test scenarios that the QSEs and TSPs have
defined and execute independently in the EDS environment
– Scheduling your testing window early allows more time for self
guided testing, make-up windows and issue resolution
http://nodal.ercot.com
13
Lead from
the front
Texas Nodal
Outage Scheduler 4.9.2 Testing: Testing Window Sign-up Email Content
The sign-up Email from QSEs and TSPs should include:
• Support Window Date and AM or PM preference
– Provide primary contact details
– Provide top three preferred dates with AM / PM preference
– ERCOT may still need to coordinate a date outside of these 3, but will make
every effort to be on one of these dates
• DUNS number of QSE or TSP
• If using Web Services, confirm that you the QSE/TSP will be engaged in
testing and not your 3rd Party Service Provider: Yes/No
• If using Web Services the URL where notifications will be sent
Note: If this is unavailable at the time of sign up, this must be received 2
weeks prior to your scheduled testing window
Send sign-up email to [email protected] by
April 4th, 2008
http://nodal.ercot.com
14
Lead from
the front
Texas Nodal
Outage Scheduler 4.9.2 Testing: Basic Communications Test (“Ping” Test)
•
MPs testing on the Web Services for the first time will be Scheduled for a
1 Hour Basic Communications test
– This test typically takes 20-30 minutes if no issues are found
– 1 hour is allocated to address any issues
– Tests performed on the call will be as follows:
• ERCOT performs a telnet to QSEs and TSPs Listener
• QSEs and TSPs performs telnet to ERCOT External Web Services Listener
• QSEs and TSPs send a sample transaction to ERCOT External Web Services Listener
•
Prior to this test MPs using External Web Services will need to have their
network and security teams make the following changes:
– QSE and TSP Listener must be on port 443 using one of the following
Certificate Authorities
•
•
•
•
Verisign
Thawte
Entrust
Equifax
http://nodal.ercot.com
15
Lead from
the front
Texas Nodal
Outage Scheduler 4.9.2 Testing: Basic Communications Test (“Ping” Test)
(continued….)
• Prior to this test QSEs and TSPs using External Web Services will
need to have their network and security teams make the following
changes:
– QSE’s / TSP’s Outage Scheduler system must be able to access:
https://nodaleds.ercot.com:80/2007-08/Nodal/eEDS/EWS/
NOTE: this SSL URL is on port 80
– Market Participants must be able to receive / send transactions
to/from the following IP ranges:
• 66.128.16.0/24
• 66.128.17.0/24
• 66.128.18.0/24
http://nodal.ercot.com
16
Lead from
the front
Texas Nodal
Outage Scheduler 4.9.2 Testing: Basic Communications Test (“Ping”
Test) (continued….)
• QSEs and TSPs using MIS (RUI) will need to have their network
and security teams make the following changes:
– Market Participants must be able to receive / send transactions
to/from the following IP ranges:
• 66.128.16.0/24
• 66.128.17.0/24
• 66.128.18.0/24
http://nodal.ercot.com
17
Lead from
the front
Texas Nodal
Outage Scheduler 4.9.2 Testing: Digital Certificates
• 1 digital certificate w/ a Generic Userid (NODALTEST) will be
Generated for Each QSE and TSP
– The MP’s USA does not need to take any action
– This is the only certificate that will work in the EDS environment
– This certificate will also work in the Nodal Sandbox environment
– It will not work in production, MOTE, or any other ERCOT
environment
– The Digital Certificate will be sent to the MP USA
• Distribution will occur after the MP signs up for a Testing Window
and Just Prior to the Support Call
– (for those requiring the basic communications test, it will be sent
prior to that session)
• All valid ERCOT issued digital certificates will continue to work in
the Nodal Sandbox
http://nodal.ercot.com
18
Lead from
the front
Texas Nodal
Outage Scheduler 4.9.2 Testing: Support Calls
• Support Calls will be held Monday – Thursday Every Week
• Support Calls Have 2 Time Slots available 9am – 11am and 1pm –
3pm
• Fridays are reserved for:
– Issue Resolution
– Follow-up calls
– Market wide status calls
• Each Testing Date has up to 2 slots Available
• MPs must have their Outage coordinator / Operator participating
in the support call. MP IT personnel should be available for
support
• Calendar will be Posted Weekly on the Readiness Center / EDS 4 /
Documents:
http://nodal.ercot.com/readiness/eds4/documents/index.html
http://nodal.ercot.com
19
Lead from
the front
Texas Nodal
Outage Scheduler 4.9.2 Testing: Support Calls (continued…)
• QSEs and TSPs using Web Services
– Will perform all test scenarios on the web services during support
call
– Will perform a subset of scenarios on the RUI during the support
call
– Remainder of the scenarios can be tested independently by the MP
through the RUI after the support call is complete
– MPs must communicate to ERCOT once all test scenarios are
complete
– ERCOT will validate RUI submitted transactions
• QSEs and TSPs using the RUI
– Will perform all test scenarios on RUI during the support call
– Validation will take place on the support call
http://nodal.ercot.com
20
Lead from
the front
Texas Nodal
Outage Scheduler 4.9.2 Testing: Issue Management
• Issues encountered on the Support Call will have a high priority
• Issues encountered during the remainder of the 7 day Test
Window should be reported via the ERCOT EDS Issue Submission
Form
– Form is located at:
http://nodal.ercot.com/readiness/eds4/documents/index.html
– Submit form to [email protected]
– Internal testing will occur in parallel with all EDS activities
• MP issues will be logged when submitted
• MP submitted issues will be compared to internal defects and addressed in
parallel
– When completing the Issue form, provide:
• Web Services: the XML files used
• MIS User Interface: Screen Shots and/or error message
• Both: The detailed scenario to reproduce the issue
http://nodal.ercot.com
21
Lead from
the front
Texas Nodal
Outage Scheduler 4.9.2 Tracking: Master Schedule (example)
February
January
MP
QSE List
Sign-Up Date
QSE NAME
QSE NAME
QSE NAME
QSE NAME
QSE NAME
QSE NAME
QSE NAME
12/21/07
12/21/07
12/21/07
12/21/07
12/21/07
12/21/07
12/21/07
15
T
16
W
17
TH
18 19 20
F S S
E
21
M
P
22
T
23
W
24
TH
25 26 27
F S S
E
P
28
M
S
P
P
S
E
P
S
E
E
29
T
T
30
W
T
31
TH
T
T
T
T
T
T
T
1
F
T
T
E
T
E
2
S
T
3
S
T
T
T
T
T
4
M
T
S
S
T
P
T
P
5
T
6
W
7
TH
8
F
9
S
10
S
11
M
12
T
13
W
14
TH
T
T
T
T
T
T
T
T
T
T
T
T
T
T
15 16 17
F S S
18
M
S
T
T
T
T
T
T
T
S
T
T
T
T
T
T
T
Legend
Enable MP for EDS Environment (E)
* ERCOT Public Key sent (if applicable)
Legend
* Digital Certificate Sent (if applicable)
Enable MP for EDS Environment (E)
* Update EIP / MMS Environment (if
* ERCOT Public Key sent (if applicable)
applicable)
Ping
Test - (P)Certificate Sent (if applicable)
* Digital
* Basic Communication
Update
MMS Environment (if
**Access
PortalEIP
/ API/(EWS)
*applicable)
Authentication (cert)
Support Call - (S)
Ping Test - (P)
* Test script
Basic
Communication
** Issue
Resolution
Reminder
of
Window
- (T)(EWS)
* AccessTesting
Portal
/ API
Make-up Support Window - (M)
* Authentication
EDS
4 Services Available (cert)
Support Call - (S)
Holiday
* Test script
* Issue Resolution
Reminder of Testing Window - (T)
Make-up Support Window - (M)
EDS 4 Services Available
Holiday
http://nodal.ercot.com
22
Lead from
the front
Texas Nodal
Outage Scheduler 4.9.2 Tracking: Preparation Checklist / Schedule
QSE Name
QSE REPRESENTATIVE:
ERCOT REPRESENTATIVE:
Support Window
Testing Window Start
Test Window End
Example QSE
QSE PM
ERCOT PM
Activity
Send QSE Schedule
Send Testing Materials to QSE PM
- Testing Schedule
- Location of Test Package (e.g. scripts, samples, et al)
- Testing Checklist (PING and Support Window)
- Location of Sample XML
Update Sample files with QSE specific data for Scenarios
Email Test Files to [email protected]
Pre-test Sample files:
- If necessary, correct and return to QSE
Using Validated Files, Generate Files for Remaining Scenarios
Setup Webex / Conf Bridge
- "pre"-test window Conf Call
- Support Window WebEx
Provide ERCOT Public Key And Digital Certificate (if needed)
Provide Example QSE Target URL for Notifications
Configure MMS for Example QSE
Configure EIP Infrastructure for Example QSE
Conduct "pre"-test window Conf Call
- Perform network connectivity test (basic ping)
- Perform basic authentication (cert) test - MMS / API
Execute Support Window
Execute Test Window (Start)
Execute Test Window (End)
Send Example QSE Phase 1 Completion Report
Responsible Party
QSE PM & ERCOT PM
Date
Day After email from QSE PM
ERCOT PM
QSE PM
QSE PM
Day After email from QSE PM
Tuesday, January 01, 2008
Tuesday, January 01, 2008
ERCOT PM
QSE PM
Monday, January 07, 2008
Monday, January 07, 2008
ERCOT PM
ERCOT PM
QSE PM
ERCOT PM
ERCOT PM
Tuesday, January 08, 2008
Wednesday, January 09, 2008
Monday, January 07, 2008
Tuesday, January 08, 2008
Tuesday, January 08, 2008
http://nodal.ercot.com
Phone
email
1/15/08 9:00 AM DUNS NUMBER (incl sub-QSE's)
Tuesday, January 15, 2008
Monday, January 21, 2008
QSE PM & ERCOT PM
ERCOT PM & QSE PM
QSE PM
QSE PM
ERCOT PM
Status
This Checklist
will be
completed by
the ERCOT PM
and
consolidated to
the Readiness
Scorecard
Monday, January 07, 2008
Tuesday, January 15, 2008
Tuesday, January 15, 2008
Monday, January 21, 2008
Tuesday, January 22, 2008
23
Lead from
the front
Texas Nodal
OVERALL STATUS DASHBOARD
http://nodal.ercot.com
0%
0%
Sign
-U
Wind p Testi
ng
ow S
ched
uled
MP 8
-Q
Subm SE Abi
lity
it Tra
nsac to
Via M tions
IS
MP 9
- QS
EAb
Subm
it We ility to
Tran b Servic
sact
e
ions
MP Name
AMERICAN ELECTRIC POWER SERVICE CORP
AMERICAN ELECTRIC POWER SERVICE CORP (SQ3)
ANP FUNDING I LLC
BPTX (SQ1)
BPTX (SQ2)
BPTX (SQ3)
BRAZOS ELECTRIC POWER CO OP INC (QSE)
BTU QSE SERVICES INC
BTU SQ1
CALPINE POWER MANAGEMENT LP
CITY OF AUSTIN DBA AUSTIN ENERGY (QSE)
CITY OF GARLAND (QSE)
CITY OF SAN ANTONIO CITY PUBLIC SERVICE (QSE)
CITY OF SAN ANTONIO CITY PUBLIC SERVICE CPS WIND (SQ1)
CONSTELLATION ENERGY COMMODITIES GROUP INC (QSE)
CONSTELLATION ENERGY COMMODITIES GROUP INC B (QSE)
CONSTELLATION ENERGY COMMODITIES GROUP INC C (QSE)
CORAL POWER LLC
CORAL POWER LLC (SQ2)
DIRECT ENERGY LP
DIRECT ENERGY LP WTU (SQ2)
0%
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
24
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
6-M
PE
Part DS-4 Tri
icipa
a
tion ls
MP1
0%
MP1
6
Trial - MP EDS
s Pa
rticip -4
ation
Sign
-U
Wind p Testi
ng
ow S
ched
uled
MP8
-Q
Subm SE Abi
lity
it Tra
nsac to
Via M tions
IS
MP 9
- QS
EAb
Subm
it We ility to
Tran b Servic
sact
e
ions
Outage Scheduler 4.9.2 Tracking: Dashboard
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Lead from
the front
Texas Nodal
Outage Scheduler 4.9.2 Reference: MP Activity Summary
•
Email [email protected] with the information on slide 12 “Sign-up email” by April
4th
•
Use the Nodal Sandbox functionality
•
Download and review the Outage Scheduler Test Package
– Send sample XML to ERCOT no less than 2 weeks prior to Testing Window
– Make Modifications (if any) to XML’s that ERCOT provides
– Prepare final XML files for Support Call
•
Read and be Familiar with Documents on Next Slide
•
First Friday call will take place on Apr 18th. Refer to the ERCOT Calendar for log-in
info and times.
•
Send all questions to [email protected]
http://nodal.ercot.com
25
Lead from
the front
Texas Nodal
Outage Scheduler 4.9.2 Reference: Relevant Documents
ERCOT Nodal Transition
Plan
http://nodal.ercot.com/docs/po/pd/ntp/ERCOT_Nodal_Transition_
Plan_062807.doc
EDS 4 Approach v1.0
http://nodal.ercot.com/readiness/eds4/documents/index.html
EDS 4 – Outage
Scheduler Handbook v1.0
http://nodal.ercot.com/readiness/eds4/documents/index.html
EDS 4.9.1 – Outage
Scheduler Test Package
http://nodal.ercot.com/readiness/eds4/documents/index.html
(note document (s) to be posted by EOB 4/2/08)
Outage Scheduler
System User Guide
http://nodal.ercot.com/readiness/eds4/documents/index.html
(note document to be posted by EOB 4/2/08)
EIP External Interface
Specification
http://nodal.ercot.com/docs/pd/eip/od/misp/eip_external_interface
s_specification_v1_10.zip
EDS Issue Submission
Form
http://nodal.ercot.com/readiness/eds4/documents/r9/ercot_eds_is
sue_submission_form.xls
http://nodal.ercot.com
26
Lead from
the front
Texas Nodal
Q&A / Open Forum
http://nodal.ercot.com
27
Lead from
the front
Texas Nodal