Integrated Program Office
Briefing to
Shared Processing Operations Steering
Committee
CAPT Craig Nelson
Major Markus Sorrells
Mr. Bill Devens
November 28, 2001
AGENDA
• NPOESS Program Status
• COPC/SPOSC NPOESS Topics
• Other COPC/SPOSC TOPICS
2
NPOESS Program Status
•
•
•
Significant Activities Since April 01 COPC/SPOSC
– NPOESS Sensors
• CMIS – BSS Contract
• APS – Now Part of NPOESS Baseline – DoD Applications
– Field Terminal MOA Signed
NPOESS Acquisition Schedule
– IORD Validation Status
• AFROC – 25 Oct 01 – Successfully Briefed
• JROC – 13 Dec 01 – On Track
– TRD v.6 Status – CCB 26 Nov – Release Jan 02
– RFP for EMD/TSPR Contract – Release Feb 02
Issues
– FY 02 DoD Budget Uncertainty
– Potential Cost/Schedule Impacts
3
Instruments in
Development/Production Phase
Visible/IR Imaging Radiometer
Suite
(VIIRS) Raytheon
Cross-track IR Sounder (CrIS)
[Engineering Development Unit]
ITT
Conical-scanning Microwave
Imager/Sounder
(CMIS) Boeing
Ozone Mapping & Profiler Suite (OMPS) Advanced Technology Microwave Sounder (ATMS)
[Artist Conception]
[NASA/GSFC Notional Design]
Ball
Aerojet
4
Satellite Transition Schedule
(27 August 2001)
Slopes indicate 10-90% need (NPOESS GAP 6c)
99
CY
0530
00
01
DMSP
02
03
04
05
F16
06
07
08
F18
09
10
11
12
F20
13
14
15
16
17
18
NPOESS
C3
Local Equatorial Crossing Time
WindSat/Coriolis
DMSP
F15
0730 1030
POES
F19
F17
NPOESS
NPOESS
C1
METOP
M
EOS-Terra
NPP
POES
1330
16
N’
N
EOS-Aqua
C2
NPOESS
Earliest Need to back-up launch
----------------10 Year Mission Life------------------Mission
Satisfaction
S/C
Deliveries
Last Modified: Aug 27, 2001
Earliest Availability
S/C delivery interval driven by 15 month IAT schedule
5
COPC/SPOSC NPOESS TOPICS
Topic
Ground Architecture
Product Definitions
Time Delivery Inflexibility
Product Needs at Centrals
Product Production at Centrals
Archives
IDPS Evolution
IDPS CONOPS
Continuing EDR Calibration
Field Terminals
Algorithm Sustainment
Data Assimilation
Status
Remarks
Cost/Tech Driving 4 IDPS
Captured in IORD II
Latency Defined in IORD II
Centrals Capable of All xDRS
Primary Centers of Performance
NESDIS-Long term/Short – 24 hrs
CCB Process in Draft CONOPS
Final Coord. & Updates Ongoing
EMD Resp. – Coord. w/ Centrals
HRD-LRD Def. / Contents in work
Evol. Alg. & R&D Draft CONOPS
Funding & Management Issues
6
Primary Centers of Responsibility (PCR)
• PCR….A component concept of IDPS CONOPS
– Used to optimize NPOESS R&D efforts
• Each Central provided NPOESS R&D resources
– Evolutionary Algorithm R&D (EARD) resources
– EARD Programmer/Manager
– PCR regarded as NPOESS authority on EDR
• Ultimate source for the “official” EDRs/archived EDRs
– Designates/serves as source for the ancillary data set
– Controls the IDPS configuration used to produce the
“official” set of EDRs for which it is PCR
– Impacts engineering design
7
PCR Selection Drives Design Decision
or
(Notional)
X FNMOC
AFWA
X
X
ADS/CLASS
NESDIS
Ancillary Data Sets
or
Environmental Data Records?
X
NAVOCEANO
Increase NESDIS processing capacity?
Or
Purchase cross-country communications (and how much?)
8
PCRs and SCRs for 55 EDRs
Environmental Data Record
Central
Requirements
HRD
Requirements
LRD
Requirements
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Key EDRs [ 6 ]
Atmospheric Vertical Moisture Profile
Atmospheric Vertical Temperature Profile
Global Sea Surface Winds
Visible /IR Imagery
Sea Surface Temperature
Soil Moisture
Atmospheric Parameters [ 9 ]
Aerosol Optical Thickness
Aerosol Particle Size
Aerosol Refractive Index/Single-Scattering
Albedo & Shape
Ozone Total Column/Profile
Precipitable Water/Integrated Water Vapor
Precipitation (Type, Rate)
Pressure (surface/profile)
Suspended Matter
Total Water Content
Cloud EDRs [ 10 ]
Cloud Base Height
Cloud Cover/Layers
Cloud Particle Size Distribution
Cloud Effective Particle Size
Cloud Ice Water Path
Cloud Liquid Water
Cloud Optical Thickness
Cloud Top Height
Cloud Top Pressure
Cloud Top Temperature
Earth Radiation Budget EDRs [ 6 ]
Albedo (Surface)
Downward Longwave Radiation (Surface)
Downward Shortwave Radiation (Surface)
Net Solar Radiation At Top of Atmosphere
[Formerly
Absorbed Solar Radiation]
Solar Irradiance
Outgoing Longwave Radiation (ToA)
Land EDRs [ 4 ]
Land Surface Temperature
Vegetation Index [Formerly Normalized
Differential
Vegetation
Index] Snow Depth
Snow Cover/Depth
[Formerly
Mapping]
Surface Type
Ocean/Water EDRs [7 ]
Net Heat Flux
Sea Ice Characterization
Ice Surface Temperature
Ocean Color
Sea Surface Height/Topography
Ocean Wave Characteristics/
Significant
Wave
Ht Wind Stress
Global Sea
Surface
Space Environmental EDRs [ 13 ]
Auroral Boundary
Auroral Energy Deposition
Auroral Imagery
Electric Field
Electron Density Profiles
Geomagnetic Field
In situ Plasma Fluctuations
In situ Plasma Temperatures
Ionospheric Scintillation
Neutral Density Profiles
Medium Energy Charged Particles
Energetic Ions
Supra-Thermal through Auroral Particles
55
EDRs
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
NESDIS/OSDPD
Atmospheric Soundings
X
X
X
X
X
X
X
X
X
X
X
X
Which Central
to be PCR?
* Secondary Central
of Responsibility?
For which EDRs?
X
X
X
X
X
X
Mechanism
to
arbitrate
PCR/SCR
allocation?
AFWA
Visible & IR Mapped Cloud
Imagery & Analysis
NAVOCEANO
Multichannel
SST & Altimetry
FNMOC
Microwave
Imagery
* SCRs collaborate with and test PCR recommended algorithm changes
9
Status of IDPS CONOPS
• Nearing completion…awaiting inputs
– Held a Centrals Conclave at IPO, 1-3 May
– Recently received consolidated inputs from follow-up Centrals’
July TIM
– Received Central IDPS CONOPS Appendices from NAVO and
FNMOC…awaiting AFWA and NESDIS
– Data Distribution Servers at Centrals
• IPO has Tasked PDRR Contractors to Conduct Feasibility
Studies and Provide ROM
• Impacts Short Term Storage Issue
10
GAO Review of NPOESS
•
•
•
Requested by House Committee on Science
Study Initiated in August 2001
Overall Objectives
1.
2.
3.
•
•
•
Evaluate the status, plans, and technical and programmatic risks
associated with NPOESS acquisition and operations
Identify challenges in managing the vast streams of data from
NPOESS satellites
Determine whether the IPO is effectively applying lessons learned
from prior NOAA satellite acquisition efforts
Entrance meetings with NWS and IPO in August
Numerous meetings with IPO to discuss all 3 objectives
No definitive schedule for completion of review
–
Draft report may be available for spring Congressional hearings after
release of FY 2003 PB
11
GAO Review of NPOESS
•
•
Current GAO Review Team focus is on objective #2
Reviews initiated in November with DoD and NOAA
•
•
•
COL Jamilkowski is DoD POC
GAO Team to visit METOC OPCs (FNMOC, NAVO,
AFWA, NCEP/NESDIS)
Focus of discussions on satellite data utilization
–
Current DMSP/POES data management overview
–
–
–
–
Data flow from satellites through center to end users and archives
Current uses of satellite data
Current center processing capacity and storage
Plans for NPOESS data management
–
–
Plans to "grow" the centers’ capacity, storage, and numerical
models to get ready for NPOESS increased data volumes
Budget plans for growing these capabilities
12
GAO Review of NPOESS
•
GAO Team request for information from OPCs
–
–
–
–
–
Current data flow architecture for DMSP data
DMSP/POES and NPOESS portions of a current information
technology architecture (ITA) and target ITA
Migration plans for reaching the target ITA
Plans to assimilate NPOESS data into weather models
Plans and budget information supporting efforts to "grow" the
centers’ infrastructure & models
13
Satellite Data Assimilation
•
•
•
•
COPC requested IPO to “lead and fund a vigorous data assimilation
plan”
IPO agrees with COPC precepts
–
Effective assimilation of satellite data into operational products is important
to success of future satellite programs (NPOESS/GOES-R) --- However
 IPO is not authorized nor funded to develop satellite data assimilation
techniques as part of approved program
IPO has provided >$3M over last 5 years for satellite data assimilation
experiments and development of techniques for processing data from
precursor instruments
– NCEP, OSDPD, AFRL, NRL, and academic institutions
– (AIRS, MODIS, SSM/IS, WindSat)
IPO will provide up to $500K annually to the Joint Center for Satellite
Data Assimilation
–
Funding contingent upon integration of DoD OPCs (FNMOC, NAVO,
AFWA) into the JCSDA
14
BACK-UP SLIDES
15
OTHER COPC/SPOSC TOPICS
• Assignment of Primary & Secondary Centers of Responsibility
– Bill Devens
• Formal Response to COPC Data Assimilation Request
– CAPT Nelson
16
IPO Sensor/Algorithm Risk
Reduction Contract Status
CrIS
Cross-track IR
Sounder
OMPS
Ozone Mapping &
Profiler Suite
GPSOS
GPS Occultation
Sensor
VIIRS
Visible/IR Imager
Radiometer Suite
CMIS
Conical Microwave
Imager Sounder
SFR
SFR
PDR
CFI
CDR
System
Functional
Review
System
Functional
Review
Preliminary
Design
Review
Call For
Improvement
Critical
Design
Review
3/98
12/98
4/99
5/99
2/02
2/99
(Sensor)
First
Unit
Delivery
3/04
3/02
11/97
8/98
1/99
5/03
6/04
(Algorithm)
11/97
6/98
11/98
N/A
1/03
3/06
1/99
10/99
5/00
6/00
2/02
6/04
11/98
8/99
2/01
3/01
1/03
12/05
17
Milestone II/Prod Preparation
Schedule
Jun 00 Revised
Activity
• Integrated Operational Requirements Document
•IORD changes by JARG Complete
•Senior User Advisory Group Approval
•JROC Approval
•IORD approved by JARC
Aug 00
Dec 00
May 01
June 01
Dec 00
Mar 01
Dec 01
Jan 02
Aug 01
June 01
Nov 01
Jan 02
Sep 01
Jan 01
Feb 02
Jul 02
Feb 02
Aug 02
•Technical Requirements Document
•TRD w/CMIS down-select changes
•Final TRD based on Validated IORD
•EMD/Production Request for Proposals
•Final RFP Release
•Source Selection Decision
•EXCOM EMD/Production Milestone
•Defense Acquisition Board & EMD Award
18
Document Status
•
•
•
•
•
•
IORD II in Review
– JROC scheduled for 13 Dec 01
COBRA: Analysis of Alternatives due Jun 02
– Guidance Received from OSD(PA&E)
– Cost analysis pending completion of the POE
SAMP in Review
– DOC/NASA/SAF comments are minor and anticipate easy resolution
– OSD has taken issue with combined EMD/Production strategy
– Anticipated SAMP signature date of Dec 01
TEMP
– 1997 signed TEMP being updated using quarterly IPT meetings
– Anticipate TEMP signature date by Aug 02
CARD: Latest draft released 12 Nov 01
Program Office Estimate
– Estimate under review/refinement
– Reconciliation with Component Cost Analysis anticipated in Dec 01
19
Summary
• EMD award slipped due to late delivery of requirements document
• Restructured PDRR
– Moved work forward to protect NPP CDR (system PDR)
– Deferred some work to post award to “create” funds
• Today – Requirements approval on track
– EXCOM approval on track
– No impediment to Aug 02 EMD award
• FY02 budget cuts cause massive restructure of program
– Will result in program slip
– Jeopardizes NPP, Windsat; slips NPOESS C-1 & causes coverage
gap
20