RF Workshop(!) 09/05/2004 Schematic RF Systems Master Oscillator 4 MW System 2 MW System 2 MW System 3 db Hybrid & Load 201 MHz Cavity Module 09/05/2004 201 MHz Cavity Module.
Download ReportTranscript RF Workshop(!) 09/05/2004 Schematic RF Systems Master Oscillator 4 MW System 2 MW System 2 MW System 3 db Hybrid & Load 201 MHz Cavity Module 09/05/2004 201 MHz Cavity Module.
RF Workshop(!) 09/05/2004 1 Schematic RF Systems Master Oscillator 4 MW System 2 MW System 2 MW System 3 db Hybrid & Load 201 MHz Cavity Module 09/05/2004 201 MHz Cavity Module 2 Schematic RF Systems Master Oscillator 2 MW System 2 MW System 2 MW System 2 MW System 3 db Hybrid & Load 201 MHz Cavity Module 09/05/2004 201 MHz Cavity Module 3 Schematic RF Systems Master Oscillator 2 MW System 2 MW System 2 MW System 2 MW System MICE Stage V 201 MHz Cavity Module 09/05/2004 4 Equipment Availability • Two 2MW 116 Circuits from Berkeley • One 4MW 116 Circuit from CERN? – Or • Two 2MW 116 Circuits from CERN? • potential 2MW Circuit from KEK 2006? • Three 300 kW 4616 Circuits from Berkeley • HT Supply from Los Alamos 09/05/2004 5 09/05/2004 6 09/05/2004 7 Issues • Q: would MICE prefer to ask CERN for two circuits rather than one? – More expensive? – Longer timescale? – Less risk? (may not be able to run at >2MW) – Issue with 4MW tubes? (may not have >2MW) – Defer: upgrade at a later date? 09/05/2004 8 UK Work Plan • LBNL Equipment to DL – Strip down & assess – Depending on funds – Aim to build a test stand to test full system – Move to RAL – Level of funding uncertain – Timescales uncertain 09/05/2004 9 RF Cost Sheet 09/05/2004 10 09/05/2004 11 09/05/2004 12