RF Workshop(!) 09/05/2004 Schematic RF Systems Master Oscillator 4 MW System 2 MW System 2 MW System 3 db Hybrid & Load 201 MHz Cavity Module 09/05/2004 201 MHz Cavity Module.

Download Report

Transcript RF Workshop(!) 09/05/2004 Schematic RF Systems Master Oscillator 4 MW System 2 MW System 2 MW System 3 db Hybrid & Load 201 MHz Cavity Module 09/05/2004 201 MHz Cavity Module.

RF Workshop(!)
09/05/2004
1
Schematic RF Systems
Master Oscillator
4 MW
System
2 MW
System
2 MW
System
3 db Hybrid & Load
201 MHz Cavity Module
09/05/2004
201 MHz Cavity Module
2
Schematic RF Systems
Master Oscillator
2 MW
System
2 MW
System
2 MW
System
2 MW
System
3 db Hybrid & Load
201 MHz Cavity Module
09/05/2004
201 MHz Cavity Module
3
Schematic RF Systems
Master Oscillator
2 MW
System
2 MW
System
2 MW
System
2 MW
System
MICE Stage V
201 MHz Cavity Module
09/05/2004
4
Equipment Availability
• Two 2MW 116 Circuits from Berkeley
• One 4MW 116 Circuit from CERN?
– Or
• Two 2MW 116 Circuits from CERN?
• potential 2MW Circuit from KEK 2006?
• Three 300 kW 4616 Circuits from Berkeley
• HT Supply from Los Alamos
09/05/2004
5
09/05/2004
6
09/05/2004
7
Issues
• Q: would MICE prefer to ask CERN for two
circuits rather than one?
– More expensive?
– Longer timescale?
– Less risk? (may not be able to run at >2MW)
– Issue with 4MW tubes? (may not have >2MW)
– Defer: upgrade at a later date?
09/05/2004
8
UK Work Plan
• LBNL Equipment to DL
– Strip down & assess
– Depending on funds
– Aim to build a test stand to test full system
– Move to RAL
– Level of funding uncertain
– Timescales uncertain
09/05/2004
9
RF Cost Sheet
09/05/2004
10
09/05/2004
11
09/05/2004
12