PDCWG Report to ROS David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy.
Download ReportTranscript PDCWG Report to ROS David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy.
PDCWG Report to ROS David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy November 28th meeting • Topics – NPRR486 – RRS – GADS summary – GREDP review – Event analysis process – Event analysis – ERCOT Frequency Control • Next meeting Jan 24, 2013 NPRR 486 • PDCWG recommends to continue to table this NPRR • ERCOT system tuning is scheduled for early January with analysis and report to PDCWG by February (tentative) • PDCWG will be prepared to provide ROS its report by the March 2013 ROS meeting (tentative) RRS • Group continues to define issues – Qualification & Testing requirements – Performance requirements • Clear definition of the two issues noted is new focus • Compliance evaluation of performance is being combined with Qualification and Testing requirements • PDCWG will continue to work to propose clarifications which will allow for clear compliance evaluation GADS Summary • TRE presented GADS summary – Information will be used to help identify contributions to poor performance by generator type – Wind Generators required to report GADS data beginning January 2013. GREDP Review • ERCOT presented results – Conventional unit analysis resulted with 99% passing – IRR unit analysis resulted with more failures – PDCWG consensus that GREDP metric has flaws and does need overhaul – PDCWG plans to work with QMWG to update and align the metric with reliability needs Event Analysis Process • PDCWG identified the need for additional telemetry to effectively evaluate Combined Cycles with Power Augmentation • ERCOT will work to draft appropriate language to add the requirement to protocols and guides Event Analysis – 10/5/12 • System did not meet 420MW/0.1Hz minimum response (failed event) • Causes identified as low online capacity over RRS obligation and some RRS was being carried on power augmentation of Combined Cycle resources Event Analysis – 10/25/12 • System did meet 420MW/0.1Hz minimum response (passed event) • Cause was attributed to excess reserves online over the RRS obligation allowing for adequate frequency response Event Analysis – 11/2/12 – DCS • System did meet 420MW/0.1Hz minimum response (passed event) • System recovered in 9 seconds • Cause was LR carrying RRS tripped UFR • Concern: – Proposed increase in quantity of LR that RRS can carry – If in place overshoot could occur in this condition – If more LR trip than Generator MW loss, frequency rise will increase risk of large steam units lifting safeties. This leads to risk of safeties not seating and additional loss of generation. Models can not model for this extended period. Event Analysis – 11/9/12 • • • • Slow system response Resources were overall slow to respond Data delay was noted on several resources Sense of over deployment of regulation resulting in oscillations • Tuning (slide 3) is expected to correct this issue Example of “over-deployment” of Regulation Service contributing to frequency oscillations and excess generation movement. ERCOT Frequency Control • Nov. 9 control issues – Possible cause was ERCOT transfer to backup control center – Control issues due to large generator deviation. Possibly due to the backup center issue • Time Error correction changes – Expected a shift of the frequency distribution ERCOT CPS2 By Day - November-2012 ERCOT Monthly CPS2 = 97.6 100% 70000 66500 98% 63000 59500 96% 56000 52500 94% 49000 NERC CPS 2 92% 42000 38500 90% 35000 31500 88% 28000 24500 86% 21000 17500 84% 14000 10500 82% 7000 3500 80% 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Day CPS 2 Avg CPS 2 Peak Energy 21 22 23 24 25 26 27 28 29 30 ERCOT Peak Energy 45500 CPS1 Average ERCOT CPS1 170 170 160 160 150 150 140 140 130 130 120 120 110 110 100 100 Monthly Average 12 Month Rolling Average ERCOT CPS2 Score* 100 95 CPS2 90 85 80 75 70 Month CPS2 Trend (Monthly CPS2 Score) *ERCOT as a single control area is exempt from CPS2. These scores are For Information Only 1/ 1 7/ /20 1/ 00 1/ 200 1/ 0 7/ 20 1/ 01 1/ 20 1/ 01 7/ 20 1/ 02 1/ 200 1/ 2 7/ 20 1/ 03 1/ 200 1/ 3 7/ 20 1/ 04 1/ 20 1/ 04 7/ 20 1/ 05 1/ 200 1 5 7/ /20 1/ 06 1/ 20 1/ 06 7/ 200 1 7 1/ /20 1 07 7/ /20 1/ 08 1/ 200 1/ 8 7/ 20 1/ 09 1/ 20 1/ 09 7/ 20 1/ 10 1/ 201 1/ 0 7/ 20 1/ 11 1/ 201 1/ 1 7/ 20 1/ 12 20 12 Daily RMS1 of ERCOT Frequency Through Nov 26, 2012 0.0500 0.0450 0.0400 0.0350 0.0300 0.0250 0.0200 0.0150 0.0100 1/ 4/1/20 7/1/2004 10 1/2 0 /1 004 1/ /20 4 4/1/2004 7/1/2005 10 1/2 0 /1 005 1/ /20 5 4/1/2005 7/1/2006 10 1/2 0 /1 006 1/ /20 6 4/1/2006 1 7/ /2007 10 1/ 0 /1 2 0 7 1/ /20 07 1 4/ /2007 7/1/2008 10 1/ 0 /1 2 0 8 1/ /20 08 4/1/2008 7/1/2009 10 1/ 0 /1 2 0 9 1/ /20 09 4/1/2009 7/1/2010 10 1/ 1 /1 2 0 0 1/ /20 10 4/1/2010 7/1/2011 10 1/ 1 /1 2 0 1 1/ /20 11 4/1/2011 7/1/2012 10 1/2 1 /1 012 /2 2 01 2 Daily RMS1 of ERCOT Frequency Through Nov 26, 2012 0.0500 0.0450 0.0400 0.0350 0.0300 0.0250 0.0200 0.0150 0.0100 1/ 4/ 200 1/ 7 7/ 200 1 7 1 0 /2 0 /1 0 7 /2 1/ 00 1/ 7 4/ 200 1/ 8 7/ 200 1 8 1 0 /2 0 /1 0 8 /2 1/ 00 1/ 8 4/ 200 1/ 9 7/ 200 1 9 1 0 /2 0 /1 0 9 /2 1/ 00 1/ 9 4/ 201 1/ 0 7/ 201 1 0 1 0 /2 0 /1 1 0 /2 1/ 01 1/ 0 4/ 201 1/ 1 7/ 201 1 1 1 0 /2 0 /1 1 1 /2 1/ 01 1/ 1 4/ 201 1/ 2 7/ 201 1 2 1 0 /2 0 /1 1 2 /2 01 2 1/ Daily RMS1 of ERCOT Frequency Through Nov 26, 2012 0.0500 0.0450 0.0400 0.0350 0.0300 0.0250 0.0200 0.0150 0.0100 ERCOT Frequency Control • Time Error correction changes – Expected a shift of the frequency distribution – Noted a small shift toward center in monthly distributions when compared to the year to date distribution – No Time Error corrections during the first 26 days of November due to the change in process to 30 seconds. 60 60 60 60 60 60 60 60 60 60 60 59 59 59 59 59 59 59 59 59 59 .1 00 .0 90 .0 80 .0 70 .0 60 .0 50 .0 40 .0 30 .0 20 .0 10 .0 00 .9 90 .9 80 .9 70 .9 60 .9 50 .9 40 .9 30 .9 20 .9 10 .9 00 Comparing October 2010 vs October 2011 profile of frequency in 5 mHz bins 0.12 0.1 0.08 0.06 Oct-10 Oct-12 0.04 0.02 0 Comparing November 2010 vs November 2011 profile of frequency in 5 mHz bins 0.12 Through Nov 26, 2012 0.1 0.08 0.06 Nov-10 Nov-12 0.04 0.02 .1 00 60 .0 90 60 .0 80 60 .0 70 60 .0 60 60 .0 50 60 .0 40 60 .0 30 60 .0 20 60 .0 10 60 .0 00 60 .9 90 59 .9 80 59 .9 70 59 .9 60 59 .9 50 59 .9 40 59 .9 30 59 .9 20 59 .9 10 59 59 .9 00 0 ERCOT Frequency Profile Comparison January through December of each Year 50000 Through Nov 26, 2012 45000 35000 30000 25000 20000 15000 10000 5000 60 .0 1 60 .0 2 60 .0 3 60 .0 4 60 .0 5 60 .0 6 60 .0 7 60 .0 8 60 .0 9 60 .1 60 0 59 .9 59 .9 1 59 .9 2 59 .9 3 59 .9 4 59 .9 5 59 .9 6 59 .9 7 59 .9 8 59 .9 9 One Minute Occurances 40000 2010 2012 Questions?