Office of Facilities Utility Budget Forecast FY 2010 & FY 2011 UTSA Strategic Resource Planning Council March 18, 2009
Download ReportTranscript Office of Facilities Utility Budget Forecast FY 2010 & FY 2011 UTSA Strategic Resource Planning Council March 18, 2009
Office of Facilities Utility Budget Forecast FY 2010 & FY 2011 UTSA Strategic Resource Planning Council March 18, 2009 Office of Facilities Utility Funding FY2009 – E&G E&G • E&G facilities include all space dedicated for teaching/research and space dedicated to its support – – – – Student Energy Fee Designated Tuition Prior Year Carry-forward Total $ 2,198,000 6,743,343 1,658,657 $ 10,600,000 http://facilities.utsa.edu 1 Office of Facilities Non-E&G Utility Budget Student Affairs • University Center • Student Housing Business Auxiliary Services • Parking Lots & Garages • Food Services • Bookstore – DTC – CV & LV • Campus Recreation • Health Services • Child Development Center • Athletics Other • Chisholm Hall • ITC – The Store http://facilities.utsa.edu 2 Office of Facilities E&G Utility Cost and Square Feet $ Cost Square Feet $12,000,000 3,500,000 3,000,000 $10,000,000 2,500,000 $8,000,000 2,000,000 $6,000,000 1,500,000 $4,000,000 1,000,000 $2,000,000 500,000 $0 0 FY00 FY01 FY02 FY03 FY04 FY05 Cost FY06 FY07 FY08 FY09 FY10 FY11 Sq. Ft. http://facilities.utsa.edu 3 Office of Facilities Non-E&G Utility Cost and Square Feet $ Cost Square Feet $3,500,000 1,600,000 1,400,000 $3,000,000 1,200,000 $2,500,000 1,000,000 $2,000,000 800,000 $1,500,000 600,000 $1,000,000 400,000 $500,000 200,000 $0 0 FY00 FY01 FY02 FY03 FY04 FY05 Cost FY06 FY07 FY08 FY09 FY10 FY11 Sq. Ft. http://facilities.utsa.edu 4 Office of Facilities Energy Utilization Index and Energy Cost Index btu/sqft/yr $/sqft/yr 250,000 $3.50 $3.00 200,000 $2.50 150,000 $2.00 $1.50 100,000 $1.00 50,000 $0.50 0 $0.00 FY99 FY00 FY01 FY02 FY03 FY04 FY05 EUI (MMBTU/SqFt) FY06 FY07 FY08 FY09 FY10 FY11 ECI ($/SqFt) http://facilities.utsa.edu 5 Office of Facilities Utility Rates $12.00 FY08 Purchased Utilities . •Electricity 63% $ 6,116,130 •Natural Gas 27% $ 2,557,800 •Water 10% $ 961,430 $11.00 $10.00 $9.00 $8.00 $7.00 $6.00 $5.00 $4.00 $3.00 $2.00 FY99 Electricity ($/100 kwh) $3.84 Natural Gas ($/mcf) $3.21 Water ($/1000 gal) $2.18 FY00 $4.33 $4.30 $2.22 FY01 $4.23 $7.14 $2.52 FY02 $4.32 $4.55 $2.88 FY03 $5.27 $6.56 $3.24 FY04 $4.82 $7.09 $3.52 FY05 $4.84 $8.23 $4.12 FY06 $5.31 $10.76 $4.60 FY07 $5.18 $8.88 $4.44 FY08 $5.74 $9.83 $4.53 FY09 $5.37 $6.69 $4.46 FY10 $5.56 $6.92 $4.68 FY11 $5.75 $7.17 $4.91 Average FY09 Thermal Energy Rates: Steam/Hot Water = $13.82/MMBTU , Chillwater = $0.10/Ton-Hour http://facilities.utsa.edu 6 Office of Facilities Square Footage and Energy Use (E&G and Non-E&G) Square Feet Energy (mmbtu) 5,000,000 800,000 4,500,000 700,000 4,000,000 600,000 3,500,000 500,000 3,000,000 2,500,000 400,000 2,000,000 300,000 1,500,000 200,000 1,000,000 100,000 500,000 0 0 FY99 FY00 FY01 FY02 FY03 FY04 SqFt FY05 FY06 FY07 FY08 FY09 FY10 FY11 MMBTU (Elect/NG) http://facilities.utsa.edu 7 Office of Facilities Cost Reduction / Avoidance Measures Recurring Amount 1604 Energy Performance Contract $ 346,500 Large Volume Natural Gas Discount 225,700 ITC Energy Performance Contract 192,600 New Utility Rate Structure 30,200 Variable Frequency Drive Retrofits – JPL 14,400 Lighting Retrofits – Student Housing 4,000 TOTAL $ 813,400 One-Time Amount Peak Demand Limiting – North Thermal Energy Plant $ 74,000 HVAC Setback Thermostats 48,000 Utility Billing Audits – Rates, Meter Readings, Faulty Meters 43,300 TOTAL http://facilities.utsa.edu $ 165,300 8 Office of Facilities Potential Cost Reduction Initiatives • • Retrofit Campus Buildings with HVAC and Lighting Motion Sensor Technology Implement Monterey Building Energy Audit Project recommendations, including but not limited to: – – – – – Lighting efficiency upgrades Occupancy sensors Removal of overhead doors Temperature Setbacks Variable Frequency Drives • Reclaim blowdown water for irrigation at North and South Thermal Energy Plants • Optimize energy efficiency through: – – – – Retro-commissioning of tri-Campus buildings Implement Campus-Wide Energy Awareness Program Implement HVAC temperature set point policy (Summer: 78 ; Winter: 72) Implement Preventative Maintenance Program (Thermography to Identify Inefficiency, Temperature Sensor Calibration, Ensure Efficient Operations) – Implement Energy Audit Program – Install Complete Utility Metering to Identify Consumption and Correct Inefficiency http://facilities.utsa.edu 12 Office of Facilities E&G Utility Budget Forecast Changes since FY2009 • Increased space: • • • • • University Heights, Engineering Building II Sculpture & Ceramics Studio II (3 months) Multi Function Office Building (3 months) Combined Science Buildings Renovation Project • Redundant electrical substation transformer http://facilities.utsa.edu 10 Office of Facilities E&G Utility Budget Forecast Changes since FY2010 • Full year impact: • • Sculpture & Ceramics Studio II Multi Function Office Building • Redundant electrical substation transformer http://facilities.utsa.edu 11 Office of Facilities E&G Utility Forecast FY 2010 Average Rate Increase Best Scenario E&G Total FY 2011 Average Rate Increase E&G Total 3.6 % $ 10,625,000 3.6 % $ 11,150,000 4.6 % $ 11,150,000 4.6 % $ 11,800,000 8.3 % $ 12,100,000 8.3 % $ 13,250,000 Existing FY2009 utility rates plus previously announced increases of: •Electricity 3.5 % •Natural Gas 3.5 % •Water 4.9 % Medium Average utility rates from FY2004 through FY2008. Excludes unusually high rates in FY2003 and existing low rates of FY2009. Worst Average utility rates from FY2003 through FY2008. Includes unusually high rate in FY2003. http://facilities.utsa.edu 9