Approved by the Board of Regents in 2006 to support rising energy prices due to double digit increases in utility rates and.
Download ReportTranscript Approved by the Board of Regents in 2006 to support rising energy prices due to double digit increases in utility rates and.
Approved by the Board of Regents in 2006 to support rising energy prices due to double digit increases in utility rates and in lieu of an increase in designated tuition. Utility % Rate Change 2003 2004 2005 2006 4 Yr Average Natural Gas 43.95% 8.11% 16.11% 30.70% 24.72% Electricity 21.9% -8.37% 0.36% 9.57% 5.87% Water 12.29% 8.67% 17.14% 11.62% 12.43% 2 • Fee Rate was set at $45 for 2006-2007 • Lowered to $35 in 2007-2008 • No rate changes since Fall 2007. Energy rates are tied to commodity market with wide price swings in times of shortage or over supply - volatile and somewhat unpredictable. Also affected by energy policy changes. 3 Energy Fee RAC = Refiners’ Acquisition Cost 4 Utility Rates $12.00 FY08 •Electricity •Natural Gas •Water $11.00 Purchased Utilities . 63% $ 6,116,130 27% $ 2,557,800 10% $ 961,430 $10.00 $9.00 $8.00 $7.00 $6.00 $5.00 $4.00 $3.00 $2.00 Electricity ($/100 kwh) Natural Gas ($/mcf) Water ($/1000 gal) FY99 $3.84 $3.21 $2.18 FY00 $4.33 $4.30 $2.22 FY01 $4.23 $7.14 $2.52 FY02 $4.32 $4.55 $2.88 FY03 $5.27 $6.56 $3.24 FY04 $4.82 $7.09 $3.52 FY05 $4.84 $8.23 $4.12 FY06 $5.31 $10.76 $4.60 FY07 $5.18 $8.88 $4.44 FY08 $5.74 $9.83 $4.53 FY09 $5.37 $6.69 $4.46 FY10 $5.72 $7.12 $4.75 FY11 $6.09 $7.59 $5.06 Average FY09 Thermal Energy Rates: Steam/Hot Water = $13.82/MMBTU , Chillwater = $0.10/Ton-Hour 5 Going forward utility costs for new facilities should be covered by designated tuition. If continuation of the fee is requested, can the fee be downward adjusted? 6 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 Designated Tuition $7,531,668 $6,743,343 $6,743,343 $6,743,343 $8,234,500 Energy Fee 0 2,874,132 2,259,300 2,234,902 2,234,000 F&A (Overhead 0 0 0 0 300,000 TOTAL $7,531,668 $9,617,475 9,002,643 8,978,245 10,768,500 Actual Expenditures <8,548,495> <8,016,760> <9,960,169> <8,768,367> <10,600,000> <1,016,827> 583,888 <373,638> <163,760> 583,888 <373,638> <163,760> 4,740 from Grants & Contracts) Prior Year Carryforward Cumulative Variance <1,016,827> 7 Square Footage and Energy Use (E&G and Non-E&G) Square Feet Energy (mmbtu) 5,000,000 800,000 4,500,000 700,000 4,000,000 600,000 3,500,000 500,000 3,000,000 2,500,000 400,000 2,000,000 300,000 1,500,000 200,000 1,000,000 100,000 500,000 0 0 FY99 FY00 FY01 FY02 FY03 FY04 SqFt FY05 FY06 FY07 FY08 FY09 FY10 FY11 MMBTU (Elect/NG) 8 3,500,000 $12,000,000 3,000,000 $10,000,000 2,500,000 $8,000,000 2,000,000 $6,000,000 1,500,000 $4,000,000 1,000,000 $2,000,000 500,000 Cost ($) $14,000,000 $0 0 FY00 FY01 FY02 FY03 FY04 FY05 Cost FY06 FY07 FY08 FY09 FY10 FY11 FY12 Sq. Ft. 9 Square Feet E&G Cost and Square Feet Cost Reduction / Avoidance Measures Recurring Amount 1604 Energy Performance Contract $ 346,500 Large Volume Natural Gas Discount 225,700 ITC Energy Performance Contract 192,600 New Utility Rate Structure 30,200 Variable Frequency Drive Retrofits – JPL 14,400 Lighting Retrofits – Student Housing 4,000 TOTAL $ 813,400 One-Time Amount Peak Demand Limiting – North Thermal Energy Plant $ 74,000 HVAC Setback Thermostats 48,000 Utility Billing Audits – Rates, Meter Readings, Faulty Meters 43,300 TOTAL $ 165,300 10 Potential Future Cost Reduction Initiatives – Under Evaluation Retrofit Campus Buildings with HVAC and Lighting Motion Sensor Technology Implement Monterey Building Energy Audit Project recommendations, including but not limited to: Lighting efficiency upgrades Occupancy sensors Removal of overhead doors Temperature Setbacks Variable Frequency Drives Reclaim blowdown water for irrigation at North and South Thermal Energy Plants 11 Potential Cost Reduction Initiatives, Continued Optimize energy efficiency through: Retro-commissioning of tri-Campus buildings Implement Campus-Wide Energy Awareness Program Implement HVAC temperature set point policy (Summer: 78 ; Winter: 72) Implement Preventative Maintenance Program (Thermography to Identify Inefficiency, Temperature Sensor Calibration, Ensure Efficient Operations) Implement Energy Audit Program Install Complete Utility Metering to Identify Consumption and Correct Inefficiency 12 Analysis conducted to determine the appropriate Energy fee rate based on: • Utility consumption of baseline facilities Baseline facilities = those online in FY 2006 (when the fee was first assessed) • Estimated utility rate increases; and Recommendation - fee should be reduced by <18.6%> to $28.50 effective Fall 2010 13 FY 2010 Proposed FY 2011 Proposed FY 2012 Designated Tuition $8,234,500 $9,215,000 (+980,500) $9,615,000 (+400,000) Energy Fee 2,234,000 1,835,000 (-399,000) 1,835,000 F&A (Overhead from Grants & 300,000 400,000 (+100,000) 400,000 TOTAL BUDGET 10,768,500 11,450,000 11,850,000 Actual / Projected Expenditures <10,600,000> Projected (+20% inc) <11,450,000> Projected (+8% inc) <11,850,000> Projected (+3.5% inc) Contracts) 14