Why Are We Here Today? EXPECTED OUTCOMES for our 2-Day Consultation Consensus on the data & assumptions driving the church ministries. Consensus.
Download ReportTranscript Why Are We Here Today? EXPECTED OUTCOMES for our 2-Day Consultation Consensus on the data & assumptions driving the church ministries. Consensus.
Why Are We Here Today?
EXPECTED OUTCOMES for our 2-Day Consultation Consensus on the data & assumptions driving the church ministries.
Consensus on the facility challenge points.
Development of a schematic master plan (of attack) to address the issues.
Adoption of a next step.
Why Have Buildings At All?
Matthew 28:19-20 (NKJV) 19 Go therefore and make disciples of all the nations, baptizing them in the name of the Father and of the Son and of the Holy Spirit, 20 teaching them to observe all things that I have commanded you; and lo, I am with you always, even to the end of the age."
Why Have Buildings At All?
Matthew 28:19-20 (NKJV) 19 Go therefore and make disciples of all the nations, baptizing them in the name of the Father and of the Son and of the Holy Spirit, 20 teaching them to observe all things that I have commanded you; and lo, I am with you always, even to the end of the age."
Buildings are the tools we use to carry out our mission as a church.
A dull axe requires great strength; be wise and sharpen the blade!
Ecclesiastes 10:10
How Do We Know Which “Roofs to Uncover” First?
Growth Space • Worship – 80% • Education – 80% • Parking
This space is required for a church to be missional
Support Space • Administrative • Choir Rehearsal • Fellowship • Recreation • Storage
Growth Balance Profile
Worship Sunday School Parking 185
Actual
168 111
Capacity
320+30 53% 567 176(56) 30% SS/Worship Ratio 60% Annual Giving $292,630 Giving Per SS Attender $1,742 Second Baptist Church Bowling Green, MO
Worship Profile
8:00am
Avg.
Attend.
100
Capacity @ 80%
256
% Full
39% 10:45am Capacity 190 256 74% Sanctuary = 29 Pews at 10 persons/pew =290 people Choir = 30 chairs Two Services Full @ 150% of Capacity = 480 Second Baptist Church Bowling Green, MO
Sunday School Balanced
for 2 Full Worship Services Preschool Children Youth Adult
Target % of Total
15% 15% 15% 55%
Need Room For
54 54 54 198
Now Have Room For
32 80 185 250
Additional SF Needed
770 SS Attendance = 75% of Worship = 360 Second Baptist Church Bowling Green, MO
Current Campus Second Baptist Church, Bowling Green, MO Site Capacity 1.5 acres @ 125 people per acre = 188 people With borrowed parking = 260 people
Project Phasing Recommendations
PHASE I – Stay and Grow • Critical Issues – Parking and Preschool PHASE II – Stay and Polish • Critical Issues – Access & Connections • PHASE III – Go and Grow • Critical Issues – Sale of Property and Purchase of New Property
PHASE I - Stay & Grow
Ia – Begin Aggressive Parking Education Ib – Develop New Parking on northeast property Ic – Purchase up to 1.2 adjacent acres for parking development Id – Expand preschool spaces and create dedicated preschool hallway by relocating adults
Special Needs Parking Member Parking New Member & Guest Parking Member Parking
1.2 Acre Purchase Needed to support 2 full worship services Current Campus Second Baptist Church, Bowling Green, MO Parking Overview • Current Spaces = 61 (110 people) • With borrowed parking = 101 Spaces (182 people) • With Phase I = 144 spaces (260 people) • For full balance = Purchase 1.2 acres
Dedicated Preschool Hallway P P P P P *Adults Relocated Upstairs above Sanctuary & Into Youth Room(s)
PHASE I Budget - Stay & Grow
Ia – Parking Ed.
Ib – New NE Pkng Ic – Purchase 1.2 Adjacent Acres Id – Reallocate space for more preschool SS
TOTAL PHASE I Est. Const. Cost Contingency Total
*Budgeted expenses for signage and printing $50,000 Market Price $5,000 $55,000 None
$55,000
PHASE II - Stay & Polish
IIa – Create east-west access via stairs/walks IIb – Develop Founder’s Fellowship Plaza IIc – Develop Founder’s Fellowship Pavilion IId – Build north bi-level connection between sanctuary and education
Wasted Space
Phase 2d
South Elevation Second Baptist Church, Bowling Green, MO
South Elevation Second Baptist Church, Bowling Green, MO
PHASE II Budget - Stay & Polish
IIa – Ped. Access IIb – Plaza
Est. Const. Cost
$12,500 $10,000
Contingency
$2,500(1) $2,500(2)
Total
$15,000 $12,500 IIc – Pavilion IId – Building Connector $15,000 $125,000 $2,500(3) $25,000(4) $17,500 $150,000
Notes:
(1) Does not include optional lift in sanctuary or design fees (2) Includes plaza furniture and fountain (3) Does not include furniture or design fees (4) Includes contingency , design, engineering, permitting & demolition.
TOTAL PHASE II $195,000
PHASE III – Go & Grow
IIIa – Locate and Purchase minimum 15 acre tract for relocation IIIb – Develop Comprehensive Master Plan of Development IIIc – Begin Capital Fund Raising for Phase I IIId – Market existing property IIIe – Begin construction on Phase I
PHASE III – Go & Grow Order of Magnitudes (Phase I)
• Land Purchase – 15 acre minimum = $150,000 • Worship Space for 450 (Phase I) @ 20sf per person = $1,500,000 • Education/Support for Phase I Only = $3,000,000 • Site Development Costs (Pro-ratas, utilities, etc.) = $50,000 • Soft Costs (Planning, contingencies, design, engineering, site paving, utilities, furnishings, permitting, etc.) = $1,125,000
Initial Order of Magnitude to Relocate to Phase I = $5,825,000*
Pronounce as “somewhere below $10,000,000”
Artist’s Renderings Typical Fee = $2,000
Step 1
Authorize LifeWay to Complete Presentation Package
Step 2
Capital Fund Raising
•
Retain Consultant
•
Choose team
•
Conduct campaign
Step 3
Development of Construction Documents
•
Call LifeWay to develop plans and specifications
•
Electrical Engineering
•
Mechanical Engineering
•
Plumbing Engineering
Step 4 Construction
•
Obtain permits
•
Authorize construction
“You cannot stay where you are, and go with God.”
Henry Blackaby
Q
uestion
& A
nswer
© 2009 LifeWay Christian Resources One LifeWay Plaza Nashville, TN 37234-0168 (615) 251-2466 [email protected]