From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai Chris Greacen August 2010
Download ReportTranscript From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai Chris Greacen August 2010
From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai Chris Greacen August 2010 Palang Thai พลังไท พลัง (palang): n 1. Power. 2. Empowerment. ไท (thai): adj. 1. Independence. 2. Self-reliance • Thailand NGO • Objective: – To ensure that the transformations that occur in the region's energy sector: augment, rather than undermine, social and environmental justice and sustainability. • Key approaches: – We teach hands-on energy technology – We draft / comment on policies – We work to empower citizens to look critically at government and industry projects and plans – We advocate structural reform Outline • hands-on village scale – solar electricity for medical clinics in Karen-controlled Burma – village micro-hydropower – Thailand • energy politics and policy – Very Small Power Producer (VSPP) program • Thailand - Tanzania – Bo Nok / Hin Krud – stopping silly big power plants • institutional aikido •Conflict area •Little/no rural electrification •Joint effort: •TOPS (Taiwan), •Palang Thai (Thailand), •SunEnergy Power (USA) • Green Empowerment (USA) Border Green Energy Team Solar electricity for 40 medical clinics for internally displaced inside Burma Up to 2 million internally displaced people in Burma Ruggedized solar electric systems built by medics in 3-5 day hands-on trainings • 10 trainings (2003-2010) • >100 medics trained • >40 clinics replace LED lighting and 0.5-5W solar panels, coupled with microfinance energy loans, can end kerosene lighting Barefoot Power is a social enterprise delivering such solutions Community micro-hydro (12 villages) Micro-hydroelectricity Source: Inversin, A. R. (1986). Micro-Hydropower Sourcebook. Kre Khi village, Tak Province 1 kW for school, clinic, church Cost: <$3,500 (turbine $250) Head: 10 meters Flow: 15 lit/sec Laos – low head micro-hydro Mae Wei – ‘pump as turbine’ off-grid induction Video… Mae Wei Border Green Energy Team Refugee camp trainings So far: Solar PV Micro-hydro Hydraulic ram pump Solar cooking 7 hybrid solar/diesel systems Biogas Solar/diesel hybrid systems for computer training centers in 7 refugee camps Border Green Energy Team Maintenance & repair trainings for > 14,000 Thai solar home systems Thai government solar home program 203,000 solar home systems US$200 million No maintenance plan 23% failure rate within 20 months “The Service & Support Department is like the guy in the parade who walks behind the elephant with a broom and a big bucket” Thai SHS in Tak province Rated 120 peak Watt single crystalline PV module Rated 150 W, 50 Hz, 230 V Inverter / 10 A Charge controller FORTH ส ภ า ว ะ ก า ร ทา ง า น แ ผ ง พ ลั ง ง า น แ ส ง อ า ทิ ต ย์ SOLAR PRODUCT ป ร ะ จุ แ บ ต เ ต อ รี่ โ ห ล ด / เ กิ น พิ กั ด โ ห ล ด เ ต็ ม ปานก ลาง ต่า SH-1210M ส ภ า ว ะ แ บ ต เ ต อ รี่ เ ค รื่ อ ง ค ว บ คุ ม ก า ร ป ร ะ จุ แ บ ต เ ต อ รี่ แ ล ะ แ ป ล ง ก ร ะ แ ส ไ ฟ ฟ้ า สา ห รั บ ร ะ บ บ พ ลั ง ง า น แ ส ง อ า ทิ ต ย์ แ บ ต เ ต อ รี่ แ ผ ง รั บ พ ลั ง ง า น แ ส ง อ า ทิ ต ย์ ไ ฟ ฟ้ า ก ระแ ส ส ลั บ 220 โ ว ล ต์ 50 เ ฮิ รต ซ์ ส า ย ดิ น L N เ ปิ ด / ปิ ด ป ลั๊ ก ไ ฟ ฟ้ า ก ร ะ แ ส ส ลั บ 220 โ ว ล ต์ 50 เ ฮิ รต ซ์ HaCo HaCo 10A ON ~ AC outlet for TV or other appliances 3K D EEP CY CLE EBB 125 3K THAI STORAGE BATTERY PUBLIC COMPANY LIMITED 12 V, 125 Ah deep cycle lead-acid battery Two 10 W tube fluorescent lights with electronic ballasts BG E T BORDER GREEN ENERGY TEAM Existing linkages Tax payers $ Ministry of Interior $ warranty PEA $ Installation company SHS End users BG E T BORDER GREEN ENERGY TEAM Missing linkages Tax payers $ Ministry of Interior $ warranty PEA $ Installation company SHS End users What happens when systems fail? There is no feedback loop from the end users to installation company, PEA, government or taxpayers BG E T BORDER GREEN ENERGY TEAM Missing linkages Tax payers $ Ministry of Interior $ warranty PEA $ Installation company Feedback on status of systems, failure modes, successful interventions SHS End users Warranty awareness BG E T Self-help: local technicians + user training BORDER GREEN ENERGY TEAM SHS Warranty FORTH ส ภ า ว ะ ก า ร ทา ง า น แ ผ ง พ ลั ง ง า น แ ส ง อ า ทิ ต ย์ SOLAR PRODUCT ป ร ะ จุ แ บ ต เ ต อ รี่ โ ห ล ด / เ กิ น พิ กั ด โ ห ล ด เ ต็ ม ปานก ลาง ต่า Warranty periods – – – – – Complete system: Solar panel: Charge controller/Inverter: Battery: Light/Ballast: SH-1210M ส ภ า ว ะ แ บ ต เ ต อ รี่ เ ค รื่ อ ง ค ว บ คุ ม ก า ร ป ร ะ จุ แ บ ต เ ต อ รี่ แ ล ะ แ ป ล ง ก ร ะ แ ส ไ ฟ ฟ้ า สา ห รั บ ร ะ บ บ พ ลั ง ง า น แ ส ง อ า ทิ ต ย์ แ บ ต เ ต อ รี่ แ ผ ง รั บ พ ลั ง ง า น ไ ฟ ฟ้ า ก ระแ ส ส ลั บ แ ส ง อ า ทิ ต ย์ 220 โ ว ล ต์ 50 เ ฮิ รต ซ์ ส า ย ดิ น L N เ ปิ ด / ปิ ด 2 years 5 years 3 years 2 years 2 years ป ลั๊ ก ไ ฟ ฟ้ า ก ร ะ แ ส ส ลั บ 220 โ ว ล ต์ 50 เ ฮิ รต ซ์ HaCo HaCo 10A ON ~ 3K D EEP CY CLE EBB 125 3K THAI STORAGE BATTERY PUBLIC COMPANY LIMITED The system warranty is expiring within a few months Very few villagers informed that there is a warranty BG E T BORDER GREEN ENERGY TEAM SHS Warranty Postcards with warranty and maintenance information could be distributed by Tambons Idea presented at meeting with DLA (Department of Local Administration) BG E T BORDER GREEN ENERGY TEAM BGET on TV Goals: TV-broadcast discussion of SHS sustainability, need for more local capacity Inform public of warranty BG E T BORDER GREEN ENERGY TEAM BGET SHS trainings in Tak province BG E T BORDER GREEN ENERGY TEAM Observed failure modes - inverter Failed inverter/charge controller (~10% of all systems surveyed). Solartron and PEA provided 15 replacement inverters for the first 2 trainings BG E T BORDER GREEN ENERGY TEAM Observed failure modes - ballast Ballast failure ~9% of systems surveyed BG E T BORDER GREEN ENERGY TEAM Observed failure modes –battery battery failure in ~6% of systems surveyed sulfated plates healthy, without sulfation BG E T BORDER GREEN ENERGY TEAM Problems found during training/surveys Installation error: Battery failure caused by solar panel installation in shady location BG E T 14:00 Saw Kre Ka village, Tha Song Yang District BORDER GREEN ENERGY TEAM Problems found during training surveys Installation error: Bad panel locations BG E T BORDER GREEN ENERGY TEAM Observed failure modes – (cascading component failure) User error: bypassed controller battery overcharge 1. Villager bypasses broken controller and charges battery directly from PV 2. Battery over-charged. Electrolyte level drops and plates are exposed to air. Battery fails. 1 2 BG E T BORDER GREEN ENERGY TEAM Observed failure modes – (cascading component failure) User error: Controller bypass leads to burned diode Villager bypasses broken controller and charges battery directly from PV 2. One mistake of reverse battery polarity blows up bypass diode in PV junction box, melting junction box. 1 1. 2 BG E T BORDER GREEN ENERGY TEAM policy & planning level… Mae Kam Pong village microhydro Can’t we hook it up and sell power back? Meeting between National Energy Policy Offic (NEPO) and Mae Kam Pong villgers to discuss grid interconnection of their village micro-hydro $ $ Technical regulations: • Allowable voltage, frequency, THD variations • Protective relays – 1-line diagrams for all cases: • • • • • Induction Synchronous Inverters Single/multiple Connecting at different voltage levels (LV or MV) • Communication channels Commercial regulations: • Definitions of renewable energy, and efficient cogeneration • Contract parties • Cost allocation • Principle of standardized tariff determination • Invoicing and payment arrangements • Arbitration + Standardized Power Purchase Agreement (PPA) Thailand’s Electricity Industry Structure Generation (% share) SPPs (10%) (45%) IPPs (42%) Import (3%) EGAT (100%) Transmission Distribution EGAT PEA (66%) MEA (32%) Users Users Direct Customers (2%) Thailand’s Electricity Industry Structure Generation (% share) SPPs (10%) (45%) IPPs (42%) Import (3%) EGAT (100%) Transmission Distribution EGAT PEA (66%) MEA (32%) Users Users Direct Customers (2%) VSPPs (<1%) Thailand’s Electricity Industry Structure Firm / non-firm Generation (% share) SPPs (10%) (45%) IPPs (42%) Import (3%) EGAT (100%) Transmission Distribution EGAT Peak / off-peak PEA (66%) MEA (32%) Users Users Direct Customers (2%) VSPPs (<1%) Evolution of Thai VSPP regulations • 2002 – VSPP regulations drafted, approved by Cabinet – Up to 1 MW export, renewables only – Tariffs set at avoided cost (bulk supply tariff + FT) Reduces air and water pollution Biogas from Pig Farms Produces fertilizer Produces electricity 8 x 70 kW generator Ratchaburi Biogas from Pig Farms Micro hydropower •40 kW •Mae Kam Pong, Chiang Mai, Thailand Korat Waste to Energy – biogas … an early Thai VSPP project • Uses waste water from cassava to make methane • Produces gas for all factory heat (30 MW thermal) + 3 MW of electricity • 3 x 1 MW gas generators Evolution of Thai VSPP regulations • 2002 – VSPP regulations drafted, approved by Cabinet – Up to 1 MW export, renewables only – Tariffs set at avoided cost (bulk supply tariff + FT) • 2006 – Up to 10 MW export, renewables + cogeneration – Feed-in tariff “adder” – If > 1 MW then utility only pays for 98% of energy Rice husk-fired power plant • 9.8 MW • Roi Et, Thailand Bangkok Solar 1 MW PV • Project size: 1 MW • Uses self-manufactured a-Si Evolution of Thai VSPP regulations • 2002 – VSPP regulations drafted, approved by Cabinet – Up to 1 MW export, renewables only – Tariffs set at avoided cost (bulk supply tariff + FT) • 2006 – Up to 10 MW export, renewables + cogeneration – Feed-in tariff “adder” – If > 1 MW then utility only pays for 98% of energy • 2009 – Tariff adder increase, more for projects that offset diesel http://www.eppo.go.th/power/vspp-eng/ for English version of regulations, and model PPA Thai VSPP feed-in tariffs Fuel Adder Additional for Additional for Years effective diesel offsetting 3 southern areas provinces Biomass Capacity <= 1 MW $ 0.015 $ 0.030 $ 0.030 Capacity > 1 MW $ 0.009 $ 0.030 $ 0.030 Biogas <= 1 MW $ 0.015 $ 0.030 $ 0.030 > 1 MW $ 0.009 $ 0.030 $ 0.030 Waste (community waste, non-hazardous industrial and not organic matter) Fermentation Thermal process Wind <= 50 kW > 50 kW Micro-hydro 50 kW - <200 kW <50 kW Solar 7 7 7 7 $ 0.074 $ 0.104 $ $ 0.030 0.030 $ $ 0.030 0.030 7 7 $ 0.134 $ 0.104 $ $ 0.045 0.045 $ $ 0.045 0.045 10 10 $ 0.024 $ 0.045 $ 0.238 $ $ $ 0.030 0.030 0.045 $ $ $ 0.030 0.030 0.045 7 7 10 Assumes exchange rate 1 Thai baht = 0.029762 U.S. dollars Tariff = Biomass tariff = adder(s) + bulk supply tariff + FT charge $0.009 + $0.049 + $0.027 = $0.085/kWh Generating Capacity supply to Grid from 2006 - August 2009 การไฟฟ้ าส่ วนภูมภิ าค PROVINCIAL ELECTRICITY AUTHORITY MW (31 August 2009) Wind 350 Hydro MSW 300 Solar Cogeneration www.pea.co.th call center 1129 250 Biogas Biomass 200 รวม 150 100 50 Year 0 2006 การไฟฟ้าส่วนภูมภิ าค 2007 2008 68 2009 VSPP project pipeline as recorded in EPPO data Application under consideration Permission received, awaiting PPA PPA signed Leakage (Project abandoned) Generating & selling electricity Jun 2009 2000 1800 1600 1400 1200 1000 800 Biomass Solar Wind Garbage 600 400 Biogas 200 Coal cogen Natural gas cogen 0 Application pending Received PPA signed permission, awaiting PPA Microhydro Generating electricity Thailand VSPP Status Dec 2009 2000 1800 1600 1400 1200 1000 800 Biomass Solar Wind Garbage 600 400 Biogas 200 Coal cogen Natural gas cogen 0 Application pending Received PPA signed permission, awaiting PPA Microhydro Generating electricity Thailand VSPP Status Mar 2010 2000 1800 1600 1400 1200 1000 800 Biomass Solar Wind Garbage 600 400 Biogas 200 Coal cogen Natural gas cogen 0 Application pending Received PPA signed permission, awaiting PPA Microhydro Generating electricity Thailand VSPP Status Mar 2010 2000 1800 1600 1400 811 MW online 1200 1000 800 Biomass Solar Wind Garbage 600 400 Biogas 200 Coal cogen Natural gas cogen 0 Application pending Received PPA signed permission, awaiting PPA Microhydro Generating electricity Thailand VSPP Status Mar 2010 PPAs signed for additional 4159 MW 2000 1800 1600 1400 811 MW online 1200 1000 800 Biomass Solar Wind Garbage 600 400 Biogas 200 Coal cogen Natural gas cogen 0 Application pending Received PPA signed permission, awaiting PPA Microhydro Generating electricity Thailand VSPP Status … but it’s still a tiny part of Thailand’s electrical energy Generation (% share of GWh) SPPs (10%) (45%) IPPs (42%) Import (3%) EGAT (100%) Transmission Distribution EGAT PEA (66%) MEA (32%) Users Users Direct Customers (2%) VSPPs (<1%) Evolution of Tanzania SPP regulations • Approved by regulator August 2009 • Up to 10 MW export, renewables & cogeneration • SPP Tariffs at average of LRMC and SRMC – Grid-connected SPP tariff (2009): $0.066/kWh – In rural mini-grid areas offsetting diesel (2009): $0.26/kWh • 5 PPAs signed by March 2010 www.ewura.go.tz/sppselectricity.html for English versions of regulations, and model PPAs Wealthy countries pay Feed-in tariff incremental costs? GET FiT proposed mechanism South-south policy/technology transfer: Technical Visit of the Delegation from the United Republic of Tanzania to Thailand regarding Thailand’s Very Small Power Producer (VSPP) program 13-20 March 2010 How we have done? การไฟฟ้ าส่ วนภูมภิ าค PROVINCIAL ELECTRICITY AUTHORITY •Document check •Identify circuit connection •System study •Line connecting construction •Meter installation •Meter reading •license check •All test www.pea.co.th call center 1129 •PPA Check Submitted Proposals Acceptance Letter •All license check PPA signed First synch. •Meter reading •Billing COD Every 1ft VSPP will get first settlement within 3 month after COD. การไฟฟ้าส่วนภูมภิ าค 85 Who have involved in PEA ? การไฟฟ้ าส่ วนภูมภิ าค PROVINCIAL ELECTRICITY AUTHORITY System Operation Div. Research Div. •First synch. test •PQ test •Identify circuit connection •Control & Operation •Communication Relay Div. call center 1129 •Switchgear & Relay test Meter Div. DG office • Technical & System Analysis • Document • Coordinator •Meter installation Area Office 1-12 & Local Office •Line connecting construction •Meter reading Legal Div. www.pea.co.th •PPA check Tariff Div. •Billing Finance Dep. •Settlement การไฟฟ้าส่วนภูมภิ าค System Operation Area Office 1-12 86 VSPP Vietnam? Tanzania Thailand Philippines? Winter 2010-11 … community built, community-owned, profitable VSPP micro-hydro in Thailand Siam Paragon Unlimited living? http://www.soho-properties.com/condobangkok-leraffine31/ Electricity production and consumption (GWh) Source: MEA, EGAT, Searin, Graphic: Green World Foundation Impacts of Pak Mun Dam alone Loss of 116 fish species (44%) Fishery yield down 80% Pak Mun Loss of livelihood for >6200 families Dams Siam Paragon 1700 families relocated Malls Mae Hong Song 65 Province Bonok-Ban Krud story Bonok Bankrud Power Demand: Projections vs. Actual 1992 - 2008 MW 48,000 44,000 40,000 36,000 32,000 28,000 24,000 มิ.ย.-93 ธ.ค.-94 ต.ค.-95 เม.ย.-96 ต.ค.-96 มิ.ย.-97 ก.ย.-97 Sep-98(MER) ก.พ.-01 ส.ค.-02 Jan-04(LEG) Jan-04(MEG) Apr-06 (MEG) มี.ค.-07 ACTUAL ธ.ค.-08 20,000 16,000 12,000 8,000 1992 1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 Linear versus exponential extrapolation 50000 24 power plants 45000 35000 30000 25000 20000 15000 10000 5000 2007 Forecast Historic peak demand trend 2021 2019 2017 2015 2013 2011 2009 2007 2005 2003 2001 1999 1997 1995 1993 1991 1989 1987 0 1985 Peak demand (MW) 40000 Fuel mix in power generation power development plan 2007 GWh Import Nuke RE Gas Coal Lignite Hydro Thai – Pacific Northwest power planning exchange Leveraging change Activity Leverage Medical clinic PV in Burma •40 clinics serve 100,000+ •“It’s hard to do amputations with a flashlight” Micro-hydro * inexpensive(<$2per W) •Intuitive & local Refugee camp trainings * If peace comes and repatriation can happen, refugees are returning to a ‘blank slate’ VSPP * Renewables becomes viable gridconnected business. * “Power plant” redefined. Power sector planning reform •Transparency •Accountability •public participation •End to “too much generation capacity” and “wrong kinds”. Principles • Commit • Be flexible and open to opportunities for equilibrium-shifting change • Take time for reflection… stay real • Document and release • “Many hands make light work” For more information Chom and Chris Greacen Palang Thai [email protected] [email protected] Skype: chrisgreacen www.palangthai.org