From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai Chris Greacen 19 June 2009
Download ReportTranscript From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai Chris Greacen 19 June 2009
From remote villages to government boardrooms: some notes on efforts to leverage change using renewable energy Palang Thai Chris Greacen 19 June 2009 Palang Thai พลังไท พลัง (palang): n 1. Power. 2. Empowerment. ไท (thai): adj. 1. Independence. 2. Self-reliance • Thailand NGO • Objective: – To ensure that the transformations that occur in the region's energy sector: augment, rather than undermine, social and environmental justice and sustainability. • Key approaches: – We teach hands-on energy technology – We draft / comment on policies – We work to empower citizens to look critically at government and industry projects and plans – We advocate structural reform Outline • hands-on village scale – solar electricity for medical clinics in Karen-controlled Burma – village micro-hydropower – Thailand • energy politics and policy – Very Small Power Producer (VSPP) program – Bo Nok / Hin Krud – stopping silly big power plants • institutional aikido •Conflict area •Little/no rural electrification •Joint effort: •TOPS (Taiwan), •Palang Thai (Thailand), •SunEnergy Power (USA) • Green Empowerment (USA) Border Green Energy Team Solar electricity for 40 medical clinics for internally displaced inside Burma Up to 2 million internally displaced people in Burma Ruggedized solar electric systems built by medics in 3-5 day hands-on trainings • 9 trainings (2003-2009) • >90 medics trained • 40 clinics Community micro-hydro (12 villages) Micro-hydroelectricity Source: Inversin, A. R. (1986). Micro-Hydropower Sourcebook. Kre Khi village, Tak Province 1 kW for school, clinic, church Cost: <$3,500 (turbine $250) Head: 10 meters Flow: 15 lit/sec Laos – low head micro-hydro orgy Mae Wei – ‘pump as turbine’ off-grid induction Video… Mae Wei Border Green Energy Team Refugee camp trainings So far: Solar PV Micro-hydro Hydraulic ram pump Solar cooking 7 hybrid solar/diesel systems Biogas Solar/diesel hybrid systems for computer training centers in 7 refugee camps Border Green Energy Team Maintenance & repair trainings for > 14,000 Thai solar home systems Thai government solar home program 203,000 solar home systems US$200 million No maintenance plan 23% failure rate within 20 months “The Service & Support Department is like the guy in the parade who walks behind the elephant with a broom and a big bucket” Thai SHS in Tak province Rated 120 peak Watt single crystalline PV module Rated 150 W, 50 Hz, 230 V Inverter / 10 A Charge controller FORTH ส ภ า ว ะ ก า ร ทา ง า น แ ผ ง พ ลั ง ง า น แ ส ง อ า ทิ ต ย์ SOLAR PRODUCT ป ร ะ จุ แ บ ต เ ต อ รี่ โ ห ล ด / เ กิ น พิ กั ด โ ห ล ด เ ต็ ม ปานก ลาง ต่า SH-1210M ส ภ า ว ะ แ บ ต เ ต อ รี่ เ ค รื่ อ ง ค ว บ คุ ม ก า ร ป ร ะ จุ แ บ ต เ ต อ รี่ แ ล ะ แ ป ล ง ก ร ะ แ ส ไ ฟ ฟ้ า สา ห รั บ ร ะ บ บ พ ลั ง ง า น แ ส ง อ า ทิ ต ย์ แ บ ต เ ต อ รี่ แ ผ ง รั บ พ ลั ง ง า น แ ส ง อ า ทิ ต ย์ ไ ฟ ฟ้ า ก ระแ ส ส ลั บ 220 โ ว ล ต์ 50 เ ฮิ รต ซ์ ส า ย ดิ น L N เ ปิ ด / ปิ ด ป ลั๊ ก ไ ฟ ฟ้ า ก ร ะ แ ส ส ลั บ 220 โ ว ล ต์ 50 เ ฮิ รต ซ์ HaCo HaCo 10A ON ~ AC outlet for TV or other appliances 3K D EEP CY CLE EBB 125 3K THAI STORAGE BATTERY PUBLIC COMPANY LIMITED 12 V, 125 Ah deep cycle lead-acid battery Two 10 W tube fluorescent lights with electronic ballasts BG E T BORDER GREEN ENERGY TEAM Existing linkages Tax payers $ Ministry of Interior $ warranty PEA $ Installation company SHS End users BG E T BORDER GREEN ENERGY TEAM Missing linkages Tax payers $ Ministry of Interior $ warranty PEA $ Installation company SHS End users What happens when systems fail? There is no feedback loop from the end users to installation company, PEA, government or taxpayers BG E T BORDER GREEN ENERGY TEAM Missing linkages Tax payers $ Ministry of Interior $ warranty PEA $ Installation company Feedback on status of systems, failure modes, successful interventions SHS End users Warranty awareness BG E T Self-help: local technicians + user training BORDER GREEN ENERGY TEAM SHS Warranty FORTH ส ภ า ว ะ ก า ร ทา ง า น แ ผ ง พ ลั ง ง า น แ ส ง อ า ทิ ต ย์ SOLAR PRODUCT ป ร ะ จุ แ บ ต เ ต อ รี่ โ ห ล ด / เ กิ น พิ กั ด โ ห ล ด เ ต็ ม ปานก ลาง ต่า Warranty periods – – – – – Complete system: Solar panel: Charge controller/Inverter: Battery: Light/Ballast: SH-1210M ส ภ า ว ะ แ บ ต เ ต อ รี่ เ ค รื่ อ ง ค ว บ คุ ม ก า ร ป ร ะ จุ แ บ ต เ ต อ รี่ แ ล ะ แ ป ล ง ก ร ะ แ ส ไ ฟ ฟ้ า สา ห รั บ ร ะ บ บ พ ลั ง ง า น แ ส ง อ า ทิ ต ย์ แ บ ต เ ต อ รี่ แ ผ ง รั บ พ ลั ง ง า น ไ ฟ ฟ้ า ก ระแ ส ส ลั บ แ ส ง อ า ทิ ต ย์ 220 โ ว ล ต์ 50 เ ฮิ รต ซ์ ส า ย ดิ น L N เ ปิ ด / ปิ ด 2 years 5 years 3 years 2 years 2 years ป ลั๊ ก ไ ฟ ฟ้ า ก ร ะ แ ส ส ลั บ 220 โ ว ล ต์ 50 เ ฮิ รต ซ์ HaCo HaCo 10A ON ~ 3K D EEP CY CLE EBB 125 3K THAI STORAGE BATTERY PUBLIC COMPANY LIMITED The system warranty is expiring within a few months Very few villagers informed that there is a warranty BG E T BORDER GREEN ENERGY TEAM SHS Warranty Postcards with warranty and maintenance information could be distributed by Tambons Idea presented at meeting with DLA (Department of Local Administration) BG E T BORDER GREEN ENERGY TEAM BGET on TV Goals: TV-broadcast discussion of SHS sustainability, need for more local capacity Inform public of warranty BG E T BORDER GREEN ENERGY TEAM BGET SHS trainings in Tak province BG E T BORDER GREEN ENERGY TEAM Observed failure modes - inverter Failed inverter/charge controller (~10% of all systems surveyed). Solartron and PEA provided 15 replacement inverters for the first 2 trainings BG E T BORDER GREEN ENERGY TEAM Observed failure modes - ballast Ballast failure ~9% of systems surveyed BG E T BORDER GREEN ENERGY TEAM Observed failure modes –battery battery failure in ~6% of systems surveyed sulfated plates healthy, without sulfation BG E T BORDER GREEN ENERGY TEAM Problems found during training/surveys Installation error: Battery failure caused by solar panel installation in shady location BG E T 14:00 Saw Kre Ka village, Tha Song Yang District BORDER GREEN ENERGY TEAM Problems found during training surveys Installation error: Bad panel locations BG E T BORDER GREEN ENERGY TEAM Observed failure modes – (cascading component failure) User error: bypassed controller battery overcharge 1. Villager bypasses broken controller and charges battery directly from PV 2. Battery over-charged. Electrolyte level drops and plates are exposed to air. Battery fails. 1 2 BG E T BORDER GREEN ENERGY TEAM Observed failure modes – (cascading component failure) User error: Controller bypass leads to burned diode Villager bypasses broken controller and charges battery directly from PV 2. One mistake of reverse battery polarity blows up bypass diode in PV junction box, melting junction box. 1 1. 2 BG E T BORDER GREEN ENERGY TEAM policy & planning level… Very Small Power Producer (VSPP) regulations Can’t we hook it up and sell power back? VSPP meetings… Korat Waste to Energy – biogas … an early VSPP project • Uses waste water from cassava to make methane • Produces gas for all factory heat (30 MW thermal) + 3 MW of electricity • 3 x 1 MW gas generators Reduces air and water pollution Biogas from Pig Farms Produces fertilizer Produces electricity 8 x 70 kW generator Ratchaburi Biogas from Pig Farms Bangkok Solar 1 MW PV • Project size: 1 MW • Uses self-manufactured a-Si VSPP summary June 2008 1000 900 800 700 600 500 400 solar bagasse rice husk other biomass (saw dust, palm) municipal waste biogas wind hydro 300 200 100 0 selling biodiesel permission applied MW VSPP ? Tanzania ? Thailand ? Cambodia ? Next project… community built, community-owned, profitable VSPP micro-hydro Unlimited living? http://www.soho-properties.com/condobangkok-leraffine31/ Electricity production and consumption (GWh) Source: MEA, EGAT, Searin, Graphic: Green World Foundation Impacts of Pak Mun Dam alone 1700 families relocated Loss of 116 fish species (44%) Fishery yield down 80% Pak Mun Loss of livelihood for >6200 families Dams Mae Hong Song Malls 65 Province Bonok-Ban Krud story Bonok Bankrud Power Demand: Projections vs. Actual 1992 - 2008 MW 48,000 44,000 40,000 36,000 32,000 28,000 24,000 มิ.ย.-93 ธ.ค.-94 ต.ค.-95 เม.ย.-96 ต.ค.-96 มิ.ย.-97 ก.ย.-97 Sep-98(MER) ก.พ.-01 ส.ค.-02 Jan-04(LEG) Jan-04(MEG) Apr-06 (MEG) มี.ค.-07 ACTUAL ธ.ค.-08 20,000 16,000 12,000 8,000 1992 1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 Linear versus exponential extrapolation 50000 24 power plants 45000 35000 30000 25000 20000 15000 10000 5000 2007 Forecast Historic peak demand trend 2021 2019 2017 2015 2013 2011 2009 2007 2005 2003 2001 1999 1997 1995 1993 1991 1989 1987 0 1985 Peak demand (MW) 40000 Fuel mix in power generation power development plan 2007 GWh Import Nuke RE Gas Coal Lignite Hydro Thai – Pacific Northwest power planning exchange Leveraging change Activity Leverage Medical clinic PV in Burma •40 clinics serve 100,000+ •“It’s hard to do amputations with a flashlight” Micro-hydro * inexpensive(<$2per W) •Intuitive & local Refugee camp trainings * If peace comes and repatriation can happen, refugees are returning to a ‘blank slate’ VSPP * Renewables becomes viable gridconnected business. * “Power plant” redefined. Power sector planning reform •Transparency •Accounability •public participation •End to “too much generation capacity” and “wrong kinds”. Principles • Commit • Be flexible and open to opportunities for equilibrium-shifting change • Take time for reflection… stay real • Document and release • “Many hands make light work” For more information Chom and Chris Greacen Palang Thai [email protected] [email protected] Skype: chrisgreacen www.palangthai.org Thailand in context • Constitutional monarchy with a parliamentary system (similar to England) • Size: about 4/5 of California • Population: 66 million (2x that of CA) • GDP (PPP): $553 billion (1/3 of CA’s) • GDP per capita: $8,500 (1/6 of CA’s) • Energy consumption: 57 million BTU (1/4 of CA’s) • Peak power demand: 23 GW (<half of CA’s) • 99.8% of villages are electrified ELECTRICITY GENERATING AUTHORITY OF THAILAND ELECTRIC POWER SYSTEM OF THAILAND SYSTEM PLANNING DIVISION TRANSMISSION SYSTEM PLANNING DEPARTMENT ISSUED DATE : JANUARY 2007 DWG. NO. EPS 2002 North Korea village wind farm 1999 -- 2001 78 79 Powerhouse under construction 80 Interphase with DPRK grid 81 Farm manager starts windturbine 82 83 7000 6000 5000 4000 Watts 3000 2000 2000 1000 1997 1994 0 23:00 1985 22:00 21:00 20:00 19:00 18:00 17:00 16:00 15:00 Time of day Year 1988 14:00 13:00 12:00 11:00 10:00 9:00 8:00 7:00 6:00 5:00 1991 Hourly load curve, by year from 1985 to 2000. Graph based on an appliance usage survey of 35 families in Mae Kam Pong village, April and June 2001. 10000 9000 8000 7000 other water boiler rice cooker iron fridge TV lights Watts 6000 5000 4000 3000 2000 1000 0 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 Contribution to evening maximum peak demand by appliance, for the years 1985 – 2001.