Tab 4: CEO UPDATE H.B. “Trip” Doggett President & Chief Executive Officer Board of Directors Meeting ERCOT Public November 13, 2012
Download ReportTranscript Tab 4: CEO UPDATE H.B. “Trip” Doggett President & Chief Executive Officer Board of Directors Meeting ERCOT Public November 13, 2012
Tab 4: CEO UPDATE H.B. “Trip” Doggett President & Chief Executive Officer Board of Directors Meeting ERCOT Public November 13, 2012 FINANCIAL PERFORMANCE (UPDATED THROUGH OCTOBER) YTD BUDGET VS. ACTUAL PERFORMANCE: $5.2 MILLION FAVORABLE $5.1 Million favorable 2011 carry forward REVENUES $0.7 Million favorable other revenues $0.6 Million unfavorable system administration fees $4.1 Million unfavorable outside services EXPENSES $2.1 Million favorable salary & related benefits $1.4 Million favorable hardware & software maintenance or licensing $0.8 Million favorable facility & equipment costs Tab 4 2 ERCOT PUBLIC FINANCIAL PERFORMANCE (UPDATED THROUGH OCTOBER) YEAR-END PERFORMANCE FORECAST: $3.8 MILLION FAVORABLE $5.1 Million favorable 2011 carry forward REVENUES $0.5 Million unfavorable system administration fees $4.8 Million unfavorable outside services EXPENSES $2.3 Million favorable salaries & related benefits $1.8 Million favorable hardware & software maintenance or licensing $0.8 Million favorable facility & equipment costs Tab 4 3 ERCOT PUBLIC IMPACTS OF ECONOMY & WEATHER – 2012 Tab 4 4 ERCOT PUBLIC EXTREME WEATHER ASSESSMENT PROGRAM • ERCOT requested extreme weather assessment, fuel surveys and winter weatherization plans from all Resource Entities • Site Visits start in Nov 2012 – Forty generation sites selected (based on performance on Feb 2, 2011) for review of weatherization preparedness – ERCOT staff developed a best practice winterization checklist to review extreme weather preparedness – Checklist was developed from causes of unit trips and derates that occurred on Feb 2-4, 2011, and resultant lessons learned • The Public Utility Commission of Texas recently submitted their Report on Extreme Weather Preparedness Best Practices to the 82nd Legislature Tab 4 5 ERCOT PUBLIC ALTERNATE FUEL CAPABILITY FOR 2012-2013 WINTER • 47 units have the capability to generate from 75% to 100% of their seasonal net maximum winter rating using fuel oil – Most units have the capability to switch to fuel oil while remaining on-line – The transition time varies from 30 minutes to 24 hours with the majority being less than 6 hours • Capacity by hours of operation using fuel oil Tab 4 Hours Capacity (MW) 0 – 24 5685 24 – 36 4137 36 – 72 3189 72 – 96 2989 96 – 168 1800 > 168 1608 6 ERCOT PUBLIC FERC CONFERENCE – SOUTHWEST COLD WEATHER EVENT • Conducted by FERC at ERCOT on September 25 • Purpose was to determine what follow-up actions have been taken in ERCOT in response to the February 2, 2011 event • Two panels (Generation & Transmission) made up of representatives from ERCOT, NERC, TRE, Calpine, Luminant, NRG, CenterPoint and ONCOR made statements and answered questions from FERC Staff • Questions from FERC staff centered on – Actions taken by the parties since the event – Response to recommendations made in the August 2011 report on the event by FERC and NERC staff – Sufficiency of those actions and responses to avoid another similar event Tab 4 7 ERCOT PUBLIC LOSS OF LOAD PROBABILITY (LOLP) STUDY • ERCOT conducts a LOLP study and updates its recommendation to the Board of the target reserve margin in ERCOT every two years • The last study was presented to the Board in Nov 2010 • ERCOT is working with Ecco International Inc. to complete the current study • Earlier this year, ERCOT acquired updated hourly wind generation patterns to use in the LOLP study and initial results from the LOLP study indicated a potential problem with the wind generation patterns – The wind consultant had used wind generation curves consistent with the latest wind turbine models to represent the capabilities of existing wind units in ERCOT (which were built over the last 10 years) – Given the recent improvements in wind turbine technology, this overestimated the likely output from these wind units • New wind generation patterns have been received from the vendor and the LOLP study is being rerun • ERCOT expects to bring draft results to the Generation Adequacy Task Force (GATF) in early December • Earliest date for Board consideration is projected to be Jan or Mar 2013 Tab 4 8 ERCOT PUBLIC RESOURCE ADEQUACY • The House State Affairs Committee, chaired by Representative Byron Cook, held a hearing focused on RA on Oct 24th – The Committee heard from the PUC, ERCOT, the Brattle Group and stakeholders, who addressed the issue and proposed solutions • The PUC, at their Oct 25 workshop approved – Increasing in the system-wide offer cap as follows • $5,000/MWh effective Jun 1, 2013 • $7,000/MWh effective Jun 1, 2014 • $9,000/MWh effective Jun 1, 2015 – Increasing the Peaker Net Margin (PNM) threshold to $300K for 2012 & 2013 – Requiring ERCOT to set the PNM threshold in 2014 and beyond at three times the cost of new entry of new generation plants Tab 4 9 ERCOT PUBLIC DEPARTMENTAL HIGHLIGHTS External Affairs • ERCOT hosted the annual ISO/RTO Council Communications meeting in Austin from October 22-23 • Communications representatives from across the country and Canada discussed – Crisis communications and social media strategy – Issues facing ISOs in 2013 – Internal communications Tab 4 10 ERCOT PUBLIC SPOTLIGHT ON: EXPERT CONTRIBUTIONS TO INDUSTRY Sarma Nuthalapati Operations Engineer Sr. Hired: 08/30/2007 Resmi Surendran Manager, Market Analysis Hired: 02/11/2004 Diran Obadina Principal, Systems Development Hired: 05/01/2003 John Adams Principal, Resource Integration Hired: 12/09/1996 • The McGraw Hill Handbook for Electrical Engineers is a general reference of all elements of power engineering, from basic AC quantities to wiring of equipment to transmission system operations • Contributions to the Section on “Independent System Operators in Unregulated Power Utilities” in the Power System Operations Chapter Tab 4 11 ERCOT PUBLIC