Americas ILC-Americas Regional Program G. Dugan ILC/GDE and Cornell University P5 meeting Apr. 20, 2006 20 April 06 P5 meeting Global design effort.
Download ReportTranscript Americas ILC-Americas Regional Program G. Dugan ILC/GDE and Cornell University P5 meeting Apr. 20, 2006 20 April 06 P5 meeting Global design effort.
Americas ILC-Americas Regional Program G. Dugan ILC/GDE and Cornell University P5 meeting Apr. 20, 2006 20 April 06 P5 meeting Global design effort 1 Outline Americas • Organization of the Americas Regional Team – GDE Misson – MoU process; FY06 budgets – Reviews • FY06 Program – FY06 ILC R&D program highlights, including university R&D program • Outlook for FY07 and beyond • Conclusion 20 April 06 P5 meeting Global design effort 2 International Linear Collider Americas The Global Design Effort Mission • Produce a design for the ILC that includes a detailed design concept, performance assessments, reliable international costing, an industrialization plan, and a siting analysis, as well as detector concepts and scope. • Coordinate worldwide prioritized proposal driven R & D efforts (to demonstrate and improve the performance, reduce the costs, attain the required reliability, etc.) 20 April 06 P5 meeting Global design effort 3 ILC Program Execution Americas In the Americas region, the ILC program (the RDR effort, and supporting ILC R&D), is executed by the Americas Regional Team. ILC-Americas Regional Team Leaders ANL-Kwang-Je Kim BNL-Mike Harrison Fermilab-Bob Kephart, Shekar Mishra, Sergei Nagaitsev Cornell LEPP- Hasan Padamsee, Mark Palmer Jefferson Lab -Swapan Chattopadahay, Warren Funk LLNL -Jeff Gronberg LBNL -Mike Zisman, Christine Celata SLAC -Tor Raubenheimer, Nan Phinney, Tom Himel TRIUMF - Shane Koscielniak 20 April 06 P5 meeting Universities- Project Leaders Global design effort 4 Organization of the ILC-Americas Program Americas • The work is broken down into a series of technically-based work packages. • GDE and each DoE lab sign MoU’s detailing the co-operative arrangement for the execution of work packages at each lab. • Yearly scope of work is spelled out in Addenda to the MoU, which detail the work packages. • For university R&D work, each university project is a work package. • Labs report financial status at the work package level quarterly, and technical status semi-annually. • About 100 work packages for FY06 are organized into a WBS. • The list of work packages, and associated resources, as well as the MOU Addenda, are posted on the ILC-Americas web site: https://wiki.lepp.cornell.edu/ilc/bin/view/Public/Americas/WebHome 20 April 06 P5 meeting Global design effort 5 FY06 budgets: Breakdown by Machine Area Americas M A C H I N E A RE A P rogram direc tion and adminis tration M anagement G lobal s ys tems E lec tron s ourc es P os itron s ourc es D amping rings Bunc h c ompres s or M ain Linac s : O ptic s , beam dynamic s , ins trumentation M ain Linac s : RF s ys tems M ain Linac s : C avities and C ryomodules Beam delivery s ys tem C onventional fac ilities T ec hnic al Sys tems Res erve DOE FY06 DOE FY06 NSF FY06 M&S Tota l FTE Direct Tota l 9 .5 0 $766 $ 3 ,0 0 6 $326 4 .1 0 $100 $761 $0 4 .4 7 $519 $ 1 ,1 5 8 $0 3 .3 5 $100 $658 $0 1 0 .3 2 $159 $ 1 ,9 8 8 $0 9 .6 3 $509 $ 2 ,1 3 5 $0 1 .3 0 $0 $214 $0 5 .7 4 $75 $988 $0 1 6 .8 4 $ 1 ,4 5 1 $ 4 ,4 1 0 $0 1 6 .9 0 $ 3 ,9 6 1 $ 7 ,3 8 0 $242 1 4 .3 8 $376 $ 2 ,7 9 6 $0 2 .6 9 $519 $ 1 ,0 3 9 $0 0 .0 0 $590 $870 $0 $ 2 ,4 3 7 99.23 20 April 06 P5 meeting Global design effort $9,126 $29,841 $568 6 FY06 budgets: Breakdown by Laboratory Americas La b/Uni v SLA C FN A L A NL J lab J lab (F N A L M O U ) LLNL L L N L (S L A C M O U ) LBN L BN L C ornell (FN A L M O U ) U NIV D O E /G D E sum DOE FY06 DOE FY06 NSF FY06 M&S Tota l FTE Di rect Tota l 5 6 .1 8 $ 2 ,6 8 3 $ 1 2 ,3 0 0 $0 3 0 .0 0 $ 6 ,0 4 6 $ 1 2 ,6 0 0 $0 3 .4 0 $27 $300 $0 1 .0 0 $136 $400 $0 $600 $600 $0 2 .2 5 $180 $ 1 ,0 0 0 $0 0 .4 2 $50 $200 $0 2 .4 8 $30 $500 $0 3 .5 0 $25 $600 $0 $165 $165 $0 0 .0 0 $0 $280 $568 $ 1 ,8 6 0 $0 99.23 $9,126 $29,841 $568 Most labs are also putting additional funds into ILC R&D. For example, Fermilab is devoting an additional ~$12 M to developing SCRF infrastructure. 20 April 06 P5 meeting Global design effort 7 ILC-Americas University FY05 R&D Program Americas • SCRF materials and surface preparation: Wisconsin ($64K), Northwestern($40K), Old Dominion ($58K) • RF power sources: Yale ($60K), MIT($30K) • Polarized electron source: Wisconsin ($35K) • Polarized positron source: Tennessee ($40K), Princeton • Damping rings: Illinois ($17K), Cornell ($75K, $46K) [NSF] • Instrumentation, diagnostics: Berkeley ($35K), Cornell ($24K) [NSF] • Mover systems: Colorado State ($49K) [NSF] • Radiation hard electronics: UC Davis ($38K), Ohio State ($75K) • Ground motion: Northwestern ($28K) • Linac beam dynamics design-Cornell ($21K) • High-gradient SCRF R&D- Cornell ($140K) 20 April 06 P5 meeting Global design effort 8 Reviews Americas DoE/NSF review-April 4-6, 2006 Chairs: Paul Grannis (DoE), Jon Kotcher (NSF) Consultants: Ilan Ben-Zvi (BNL) George Mulholland (Applied Cryo Technology) Don Hartill (Cornell) Katsunobu Oide (KEK) Tom Elioff (SLAC) Dixon Bogert (FNAL) Ferdi Willeke (DESY) Agenda and talks: http://ilcagenda.cern.ch/confer enceDisplay.py?confId=159 Report should be available in a few weeks FY06 University Accelerator R&D program was also reviewed and prioritized in early February, by an ad-hoc GDE review committee, and results went to DoE and NSF 20 April 06 P5 meeting Global design effort 9 Americas Global Systems • System availability studies (SLAC) • Design of high availability hardware (SLAC, LLNL) – Kickers, Power supplies, diagnostics, and control system Fast (redundant) kicker for DR • General control system design (ANL, Fermilab, SLAC) 20 April 06 P5 meeting Global design effort 10 Sources Americas • Laser and cathode for polarized electron source (SLAC) • NC structures: design and test (SLAC) • • Undulator design, E166 (SLAC, Cornell) Positron capture structures Positron Source simulations (ANL) • A comprehensive start-to-end simulation of conventional, polarized, and keep-alive sources. • Positron target design (LLNL) – Detailed engineering – Target simulations • Energy deposition • radiation damage, activation 20 April 06 P5 meeting Global design effort 11 Damping rings Americas • Damping ring component optimization: wigglers, fast kickers; studies of the use of CESR as an ILC positron damping ring test facility (in 2008) (Cornell) • Damping Ring Design and Optimization (ANL) – Lattice design and optimization; particle tracking for singlebunch instabilities with 3-D wakefield; studies of ion instability in the APS ring; design of a hybrid wiggler satisfying the field quality tolerance • SEY studies in PEP-II (SLAC) • ATF damping ring experiments (SLAC, LBNL, Cornell) • Lattice designs for damping rings and injection/extraction lines; characterization of some collective effects, including spacecharge, IBS and microwave instability; physics design of stripline kickers for single-bunch extraction at KEK-ATF (LBNL) 20 April 06 P5 meeting Global design effort 12 RTML and Main Linac Optics, beam dynamics, instrumentation Americas • RTML design (SLAC, Cornell) • Main linac optics design (SLAC, Fermilab) • Low emittance transport simulations and BBA design (SLAC, Fermilab, Cornell) • Wakefield calculations (SLAC) • Linac beamline Instrumentation (SLAC) signal from ACC1, cav 1, cplr 2 1.4 TTF HOM Signal 800 monitors installed 1.3 1.2 1.1 Volts 1 0.9 0.8 0.7 0.6 0.5 0 0.5 1 1.5 2 2.5 time - s 20 April 06 P5 meeting 3 3.5 4 RF BPM for linac 4.5 -4 x 10 Global design effort 13 Main Linac RF sources Americas • Linac rf sources (SLAC, LLNL) Marx generator modulator • SLAC End Station B (RF Test Fac.) • Develop 5 MW station in FY06, and 10 MW station later – Test rf system components – Reuses extensive infrastructure • Coupler Test Stand (LLNL) – Evaluation and analysis of RF coupler designs • Linac SC quad and BPM (SLAC) • Studies of magnetic center stability with excitation 20 April 06 P5 meeting Global design effort 14 ILC Cavities and test facilities Americas Joint ANL/FNAL BCP/EP Facility • • • • • • Meson Detector Building (MDB) TD MP9 Cryomodule Assembly Facility (CAF) Industrial fabrication of cavities (12 cavities in FY06) (FNAL) BCP and vertical testing (FNAL, Cornell) EP process development and vertical testing (FNAL, Jlab). Joint BCP/EP facility being developed at ANL (late 06) Horizontal test facility @ FNAL (ILCTA-MDB) (complete Fall 06) Vertical test facility under development @ FNAL (ILCTA-IB1) (complete 07) 20 April 06 P5 meeting Global design effort 15 Cryomodule Design Americas • Industrial fabrication and cost reduction of the ILC cryomodule are both crucial issues for a realistic ILC cost estimate • In FY05 Fermilab started on converting drawings of the DESY/INFN design of the ILC cryomodule (Type-III+) to US standards for U.S. vendor fabrication and for cost reduction. • IN FY06, as part of a co-ordinated global effort, design has started for an improved ILC cryomodule (Type-IV). 20 April 06 P5 meeting Global design effort 16 Cryomodule string test: ILCTA-NML at Fermilab Americas New Muon Lab (NML) FNPL Photo-Injector Building a dedicated ILC cryomodule string test facility in the New Muon Lab – Building is cleaned out except for removal of CCM ( in progress) – Started to install cryogenic system-complete in FY07 – Move FNPL Photo-injector to provide electron beam (FY07) – Upgraded FNPL will provide beam tests of ILC cryomodules (FY08 and 09) 20 April 06 P5 meeting Global design effort 17 High gradient cavity R&D Americas Jlab: Fabricate, process and test cavities from large-grain/single-crystal material) • Objectives (not a complete list): – Several single cell and at least one multi-cell cavity made from large grain/single crystal niobium and BCP processed. – Test cavity for superconducting rf joint investigations; – Two cavities suitable to be combined into a superstructure Cornell LEPP: ILC high-gradient SCRF • Re-entrant Cavity Shape: - 47 MV/m at Cornell…Later 52 MV/m at KEK - 9-cell re-entrant cavity ordered from AES 20 April 06 P5 meeting Global design effort 18 Beam Delivery System Americas • Beam delivery system design (SLAC) • ATF-2 (SLAC) • Construction of magnets, PS, and instrumentation • ESA MDI Test Facility (SLAC) • NanoBPM for ATF2 (LLNL) • ILC Final Focus Magnet Development (BNL) • Continue to support the baseline design efforts, and the development of the Conceptual Design/Cost Estimate for the Beam Delivery System • Fabricate and test a short proof of principle shielded final-focus-like quadrupole coil • Fabricate and test a short proof of principle sextupole/octupole corrector-like coil 20 April 06 P5 meeting Global design effort 19 ILC Civil Design for the RDR Americas • Design to “sample sites” from each region – Americas – near Fermilab – Japan – Europe – CERN & DESY • Americas Site - in Illinois– location may vary from the Fermilab site west to near DeKalb • Design efforts ongoing at Fermilab and SLAC 20 April 06 P5 meeting Global design effort 20 Potential TRIUMF Accelerator R&D Resources for ILC Americas The specific nature of Canadian involvement is under development. Some potential collaboration areas have been identified, along with relevant LHC experience: The design of kicker magnets and the construction of associated pulseforming networks and fast switches using power semiconductors Precision room temperature magnet systems Beam instrumentation and readout systems Contributions to beam dynamics & lattice calculations for damping rings. Remote handling design/consulting of target stations possible applicability to conventional positron source Peripheral aspects of superconducting r.f., such as cryogenic coolant distribution system, design/consulting, small quantity e-beam welding of niobium Vibration control systems and alignment of components for final focus system; also interest in abort kickers 20 April 06 P5 meeting Global design effort 21 FY07 outlook Americas • PB doubles ILC program budget to $60M (This includes ILC detector R&D at labs and universities) • However, the requested (“technically limited”) program (~$98M) exceeds the available funding. A process of prioritization will be required. • This process should look to GDE for guidance on priorities. Advice will be sought from GDE R&D Board for general ILC R&D efforts, and from Linear Collider Steering Group for the Americas (LCSGA) for regionspecific Americas bid-to-host related activities. • First steps: document FY07 lab program requests (April 24); Regional team meeting to discuss FY07 requests and future plans (May 3-4, SLAC) 20 April 06 P5 meeting Global design effort 22 FY07 program: lab requests Americas DoE FY06 Budget DoE FY07 Lab Requests M A C H I N E A RE A FTE M&S (Direct) P rogram direc tion and adminis tration 9.5 $766 M anagement 4.1 $100 G lobal s ys tems 4.5 $519 E lec tron s ourc es 3.4 $100 P os itron s ourc es 10.3 $159 D amping rings 9.6 $509 Ring to M ain L inac 1.3 $0 M ain Linac s : O ptic s , beam dynamic s , ins trumentation 5.7 $75 M ain Linac s : RF s ys tems 16.8 $1,451 M ain Linac s : C avities and C ryomodules 16.9 $3,961 Beam delivery s ys tem 14.4 $376 C onventional fac ilities 2.7 $519 T ec hnic al Sys tems (T D R E ngineering) 0.0 $590 Res erve (inc l univers ity program) Bid to hos t TOTAL 20 April 06 P5 meeting 99.2 $9,126 Total $3,006 $761 $1,158 $658 $1,988 $2,135 $214 $988 $4,410 $7,380 $2,796 $1,039 $870 $2,437 $29,841 Global design effort FTE M&S (Direct) Total 12.4 $1,173 $4,030 2.3 $0 $425 26.0 $1,645 $6,349 8.8 $810 $2,550 9.1 $948 $3,182 16.2 $725 $4,685 1.2 $0 $222 11.5 $250 $2,119 27.5 $6,907 $12,991 86.0 $15,708 $31,637 28.0 $1,401 $6,219 1.0 $550 $822 53.7 $450 $8,574 $4,000 6.0 $8,200 $10,484 289.5 $38,765 $98,289 23 FY07 ILC program requests Americas • • • • • • TDR engineering efforts (~50 FTE) Cavity and cryomodule work RF system development Sources, Damping rings, beam delivery Global systems Technical R&D in support of the US regional interest (“bid-to-host”: to be developed by LCSGA panel) 20 April 06 P5 meeting Global design effort 24 Cavities, cryomodules and test infrastructure Americas • Fabricate (in industry) and process (at labs) 12 more ILC high-gradient cavities; continue R&D on large-grain and high-gradient cavities. • Continue R&D on EP processing, field emission/dark current issues, thin film systems; develop EP facility at ANL. • Horizontally test 10 cavities at Fermilab. • Build first US-built cryomodule and receive parts for 2nd cryomodule (to be built in FY08). • Complete design of Type IV (ILC-style) cryomodule. • Complete vertical test facility, and second horizontal test facility, at Fermilab (IB1). • Install cryogenic systems support for cryomodule tests in Fermilab’s ILCTA-NML. • Upgrade and move Fermilab photoinjector to ILCTA-NML. • Purchase 10 MW klystron and another bouncer modulator for ILCTANML at Fermilab 20 April 06 P5 meeting Global design effort 25 Linac RF systems Americas • Continue development of Marx modulator, and evaluation of DTI and SNS modulators: downselect modulator choice by end of FY07. • Purchase two 10 MW klystrons from CPI and Toshiba. Contract with CPI to develop a high-efficiency 5 MW klystron. Fabricate two sheet-beam klystron prototypes, following SLAC design (split funding in FY07 and FY08). Goal is klystron choice by end of FY08. • Investigate cost reduction options for RF distribution system and couplers. • Continue development of LLRF systems 20 April 06 P5 meeting Global design effort 26 Technical R&D in support of the US regional interest Americas Civil design • Begin design studies to fully develop an expression of interest for an American site for the ILC Industrialization • Initiate procurements for the fabrication of the first of three complete RF units (cavities, cryomodules, RF system components) by industrial firms in the Americas. Cavity processing and cryomodule assembly would use existing lab infrastructure. These “placeholders” to be reviewed by LCSGA panel charged with developing a plan for technical R&D in support of the US regional interest 20 April 06 P5 meeting Global design effort 27 Beyond FY07-Speculation Americas • For FY08 and 09, one can make a crude speculative extrapolation from the FY07 requests. • For FY08, increase the R&D efforts in most areas, and substantially increase Technical Systems (the TDR engineering efforts). Infrastructure, continues at the same level, roughly, while accelerator design, is reduced a bit as the effort shifts more to engineering. • Most of the growth appears in “bid to host”, where the civil work increases, as well as the funding for industrially produced RF units. • The same trends continue into FY09. At the end of FY09, the total civil work for the bid to host is about $30M, corresponding roughly to a CDR for the civil design of the US ILC site. The $46M of industrial effort has produced 3 RF units, corresponding to enough components for a 3 GeV linac. (Detailed plan to be worked out by LCSGA panel). • No funding is allocated here for actually assembling these components into a linac, for example as a systems integration demonstration. 20 April 06 P5 meeting Global design effort 28 Beyond FY07-Speculation Americas M A C H I NE A RE A DOE FY07 Tota l P rogram direc tion and adminis tration $ 4 ,0 3 0 M anagement $425 G lobal s ys tems $ 6 ,3 4 9 E lec tron s ourc es $ 2 ,5 5 0 P os itron s ourc es $ 3 ,1 8 2 D amping rings $ 4 ,6 8 5 Ring to M ain L inac $222 M ain L inac s : O ptic s , beam dynamic s , ins trumentation $ 2 ,1 1 9 M ain L inac s : RF s ys tems $ 1 2 ,9 9 1 M ain L inac s : C avities and C ryomodules $ 3 1 ,6 3 7 Beam delivery s ys tem $ 6 ,2 1 9 C onventional fac ilities $822 T ec hnic al Sys tems $ 8 ,5 7 4 Res erve $ 4 ,0 0 0 Bid to hos t $ 1 0 ,4 8 4 TOTA L 20 April 06 P5 meeting $98,289 -------------DOE FY08 Tota l $ 3 ,3 0 0 $350 $ 5 ,5 0 0 $ 1 ,7 0 0 $ 3 ,5 0 0 $ 5 ,7 0 0 $200 $ 1 ,5 0 0 $ 1 1 ,0 0 0 $ 3 4 ,0 0 0 $ 8 ,5 0 0 $ 1 ,0 0 0 $ 1 6 ,5 0 0 $ 4 ,5 0 0 $ 3 0 ,0 0 0 $127,250 Global design effort DOE FY09 Tota l $ 3 ,6 0 0 $400 $ 5 ,1 0 0 $ 1 ,6 0 0 $ 2 ,5 0 0 $ 2 ,9 0 0 $100 $ 1 ,0 0 0 $ 1 2 ,0 0 0 $ 3 4 ,0 0 0 $ 6 ,5 0 0 $500 $ 2 0 ,2 5 0 $ 4 ,5 0 0 $ 3 5 ,0 0 0 $129,950 3-y ea r Tota l $ 1 0 ,9 3 0 $ 1 ,1 7 5 $ 1 6 ,9 4 9 $ 5 ,8 5 0 $ 9 ,1 8 2 $ 1 3 ,2 8 5 $522 $ 4 ,6 1 9 $ 3 5 ,9 9 1 $ 9 9 ,6 3 7 $ 2 1 ,2 1 9 $ 2 ,3 2 2 $ 4 5 ,3 2 4 $ 1 3 ,0 0 0 $ 7 5 ,4 8 4 $355,489 29 Conclusions Americas • A vigorous R&D program, in support of the GDE goals, is underway in FY06 at national labs and universities throughout the Americas region. The Americas Regional Team is also playing a major role in the development of the ILC RDR and cost estimate. • For FY06, challenges remain in completion of the RDR and cost estimate this year, in cavity processing and klystron R&D, and in effective co-ordination of the regional R&D programs. • Next year, as the project enters the TDR phase, a significant increase in resources will allow development of the TDR, expansion of the R&D program, and the start of efforts to develop the Americas region bid to host the ILC. • The requested resources for an FY07 technically limited program exceed those expected to be available. • Top-down extrapolations from FY07 to FY08 and FY09 can be made, but are highly speculative at this point. 20 April 06 P5 meeting Global design effort 30