Extends A WARM WELCOME PRESENT SCENARIO Pumping 780 Million Litres of Water per Day to Bangalore City through Cauvery Water Supply Scheme Stage-I, II, III and IV.
Download ReportTranscript Extends A WARM WELCOME PRESENT SCENARIO Pumping 780 Million Litres of Water per Day to Bangalore City through Cauvery Water Supply Scheme Stage-I, II, III and IV.
Extends A WARM WELCOME PRESENT SCENARIO Pumping 780 Million Litres of Water per Day to Bangalore City through Cauvery Water Supply Scheme Stage-I, II, III and IV PRESENT SCENARIO Handling 410 Million Litres of sewage and treating them in 5 sewage treatment plants located in different parts of the City. STATEMENT SHOWING THE TOTAL REVENUE COLLECTION FOR THE YEARS 1995-96 TO 2002-2003 (up to December 2002) (DEC. 2002) 22937.69 25000.00 21447.53 19587.45 18181.04 16134.93 AMOUNT IN LAKHS 20000.00 14364.23 15000.00 12092.61 10146.96 10000.00 5000.00 0.00 1995-1996 1996-1997 1997-1998 1998-1999 1999-2000 2000-2001 2001-2002 2002-2003 Prorata Charges collected from 1995-96 to 2002-2003 (up to December 2002) 2500 2330.87 2186.73 2161.15 (DEC. 2002) 2000 Am ount in Lakhs 1521.36 1500 1029.64 1105.36 983.28 1000 816.36 500 0 1995-96 1996-97 1997-98 1998-99 1999-2000 2000-2001 2001-2002 2002 CONSUMPTION OF CHLORINE FROM 1995 TO 2002 (DECEMBER) (DEC. 2002) 907.80 WEIGHT IN METRIC TONNES 1000.00 807.30 900.00 800.00 700.00 600.00 384.30 500.00 295.72 400.00 239.56 400.45 382.66 267.31 300.00 200.00 100.00 0.00 1995 1996 1997 1998 1999 2000 2001 2002 Customer friendly initiatives Electronics Clearing System introduced; Informative Website in position; Interactive Voice Response System in position; Monthly Water Adalats in each SubDivision effectively working; Customer Charter launched; Many transparent measures introduced for the benefit of customers; DOMESTIC TARIFF STRUCTURE Sl.No Slabs ( in litres) Amount in Rs. Minimum 90.00 1 0-15000 6.00 2 15001-25000 8.00 3 25001-50000 12.00 4 50001-75000 30.00 5 75001-100000 36.00 6 100000 & above 36.00 NON-DOMESTIC TARIFF STRUCTURE Sl.No Slabs (in litres) Amount in Rs. 1 2 3 4 5 6 Minimum 0-10000 10001-20000 20001-40000 40001-60000 60001-100000 100001 & above 360.00 36.00 39.00 44.00 51.00 57.00 60.00 INDUSTRIES TARIFF STRUCTURE Sl.No Category 1 INDUSTRIES Amount in Rs. 60.00/K.L. CURRENT PROJECTS ON HAND Commissioning of seven sewage treatment plants under Cauvery Water Supply Scheme Stage-IV, Phase-I, adding an additional capacity of 245 MLD . Projected to be completed by December 2003 CURRENT PROJECTS ON HAND Comprehensive networking of all BWSSB offices in Bangalore through LAN WAN. Proposed to be completed by first week of Feb. 003. CURRENT PROJECTS ON HAND Two tertiary treatment plants – Vrishabhavathi Valley (60 MLD) and Yelahanka (10 MLD) to be commissioned during Feb. 2003 CURRENT PROJECTS ON HAND National River Conservation Plan works with an estimated cost of Rs. 47 crores under implementation CURRENT PROJECTS ON HAND Newly added areas being networked with water supply and UGD facilities at an estimated cost of Rs. 143 crores. CURRENT PROJECTS ON HAND An ambitious project for reducing Unaccounted For Water (UFW) and bringing it down to less than 15 % under implementation. Proposed to be completed by December 2003. AusAID Master Plan Project Four Components 1. Planning for Water Supply, Sewerage & Environmental Sanitation. 2. Services Upgrading and Extension for the Urban Poor and Vulnerable Communities. 3. Institutional Capacity Building and Strengthening. 4. Water Supply and Sewerage Pilot Projects. Water supply requirements(MLD) B.W.S.S.B. Service Area 2000 2005 2010 2025 655 873 1147 2010 Capital cost estimates for Water Supply rehabilitation (2001-25) (In Rs. Crores) 200105 200610 201115 201620 202125 Total Water Treatment Plants 26.05 15.10 20.55 4.55 11.00 77.25 Major Pipelines 31.93 53.25 63.85 47.68 60.70 257.41 GLRs &OHTs 14.01 5.48 11.79 0.34 8.33 39.85 Pumping Stations 10.07 5.80 10.06 29.17 11.97 76.07 Minor Pipelines 43.60 39.18 36.95 35.30 35.30 190.90 125.66 118.81 152.10 117.04 127.30 640.91 TOTAL Summary of Capital Costs Stage 1 (In Rs. Crores) Stage 2 (In Rs. Crores) Leakage & UFW 242.70 - Water supply rehabilitation & Extension Major sewer rehabilitation Minor sewer rehabilitation TOTAL 139.70 370.30 190.40 195.80 227.70 227.30 800.50 793.40 Customer friendly initiatives to be launched during the first half of 2003 Spot billing system 24-hour KIOSKS Web enabled access to customer history Web enabled interactive redressal system