Working Group on Nowcasting Research Annual Report to JSC6Paul Joe WGNR - JSC6 July 18 2013
Download ReportTranscript Working Group on Nowcasting Research Annual Report to JSC6Paul Joe WGNR - JSC6 July 18 2013
Working Group on Nowcasting Research Annual Report to JSC6 20130718 Paul Joe WGNR - JSC6 July 18 2013 1 Outline • • • • • Membership JSC5 Action Items Projects – Near Past, Current and Future Other Activities Planned Meetings WGNR - JSC6 July 18 2013 2 Approval/Advice from JSC 1. 2. 3. 4. 5. 6. Membership Scheduling? Lake Victoria (defer to 4.7) WGNR Meeting – EA 2014? WSN15 or WSN16 – begin to prepare? WWOSC Nowcasting White Paper? Merging? WGNR - JSC6 July 18 2013 3 Tom Keenan WGNR - JSC6 July 18 2013 Steve Goodman 4 •Startup in 2003 •Staggered membership began in 2011 •Now organized to change every 4 years* •Chair in year preceding year •2 term rule* WGNR - JSC6 July 18 2013 5 JSC5 Action Items • 36 – CIMO Link • 38 – Lake Victoria • 39 – Contribute to WIGOS WGNR - JSC6 July 18 2013 6 36 CIMO Link • “Link should be established with CIMO to look into defining a standard for operational instrumentation.” • Action to: Chairs of JWGFVR, WGNR, CAS President • DONE! • JWGFVR is a member of the Solid Precipitation Inter-comparison Experiment International Organizing Committee of CIMO (June 2013) • Defer to JWGFR report WGNR - JSC6 July 18 2013 7 38 – Lake Victoria • “Executive Council requested WWRP to investigate a Lake Victoria Basin Understanding project. UKMO noted gap in lack of evaluation process for local forecasts in Lake Victoria region, JSC asked to consider establishing a field RDP.” • On-going • Discussed under “future project 4.7” WGNR - JSC6 July 18 2013 8 39 - Contribute to WIGOS • JSC recommended provision of quantified WWRP requirements as input to WIGOS. • Provided input to CBS/SBO Weather Radar Data Exchange Initiative - DONE • Plan is to organize various FDP science and monitoring leads to draft “user requirements table” for nowcasting data requirements for fine scale observation and prediction – On-going/see next slide WGNR - JSC6 July 18 2013 9 GCOS Data Requirements Table Spatial Resolution Cycle Time WGNR - JSC6 July 18 2013 10 Projects • • • • • • • SNOW-V10 NWP for Nowcasting FROST14 INCA-CE TOMACS Korea 2018 Lake Victoria Project WGNR - JSC6 July 18 2013 11 SNOW-V10 3 journal papers published 17 journal papers accepted for publication 40+ Conference papers More to come… WGNR - JSC6 July 18 2013 12 SNOW-V10 FROST-14 Capacity Building Oct 2012 Sochi Forecaster Training WGNR - JSC6 July 18 2013 13 Weather Olympians 2014 WGNR - JSC6 July 18 2013 1980 2000 2014 14 FROST-2014: • To develop a comprehensive information resource of alpine winter weather observations; • To improve and exploit: – high-resolution deterministic mesoscale forecasts of meteorological conditions in winter complex terrain environment; – regional meso-scale ensemble forecast products in winter complex terrain environment; – nowcast systems of high impact weather phenomena (wind, visibility, precipitation type and intensity etc.) in complex terrain. • To improve the understanding of physics of high impact weather phenomena in the region; • To deliver deterministic and probabilistic forecasts in real time to Olympic weather forecasters and decision makers. • To assess benefits of forecast improvement (verification and societal impacts) WGNR - JSC6 July 18 2013 15 Today’s network of meteorological stations in the region of Sochi WGNR - JSC6 July 18 2013 16 Vaisala C-band Doppler radar WRM200 on Akhun mountain in Sochi was launched in September 2012 Altitude – 646 m Location: 43о32’52,6 ״N, 39о51׳05,0״E. • Max reflectivity; • wind&refl 2km-cappy; • echo tops; • 1-hour precipitation WGNR - JSC6 July 18 2013 Raw Turkish data are expected to be 17 available Mobile Remote Sensing Vertical Profile of Doppler Spectra MRR Radiometer Wind Profiler Radiometer + 4 times/day upper air sounding in Sochi WGNR - JSC6 July 18 2013 MRR 18 3. DEMOS – 24 Jan 2013 (heavy rain/snow) 2.5 km 1.0 km 250m Precipitation Cascading Domain Wind Same domain 25 Jan 2013 WGNR - JSC6 July 18 2013 19 Model Elevation – Jason Milbrandt 3. DEMOS – 24 Jan 2013 (heavy rain/snow) 250 m X-C S-J WGNR - JSC6 July 18 2013 Alpine 20 Ensemble project component Current state: COSMO-S14-EPS, GLAMEPS, NOAA-7km EPS, COSMO-RU2-EPS Expected: HARMON-EPS, Aladin LAEF / AROME-1km, KMA’s downscaling of probabilistic forecasts. Poor man’s ensemble of deterministic high-resolution models WGNR - JSC6 July 18 2013 21 INCA-CE See Ingo Meirold-Mautner report. Agenda item 4.3.. WGNR - JSC6 July 18 2013 22 TOMACS Proposal WGNR - JSC6 July 18 2013 23 Use of Dense Observations 11+ radars WGNR - JSC6 July 18 2013 24 Fine Scale Data Assimilation WGNR - JSC6 July 18 2013 25 PyeongChang Korea 2018 WGNR - JSC6 July 18 2013 Radars Wind Profiler AWS Met. Sensors of IPS 26 Surface detectors Met. Supports : Specialized Support System Special Observation Research (snow process and physics) Forecasting system development Sonde Special OBS Snow process and physics WGNR - JSC6 July 18 2013 Precipitation type Forecast 27 Met. Supports : Specialized Support System Research on the physical processes over the rugged terrain and High Mountain Forecast system specialized on mountain : Radiation over slope SFC TEMP at sunrise (SH-ORG) Freezing level Forecast Understanding the specific physical processes over the mountainous area through the18 special WGNR - JSC6 July 2013 observation 28 Met. Supports : Specialized Support System Supporting system for each venues WGNR - JSC6 July 18 2013 29 Lake Victoria Project Proposal “WMO Executive Council (EC) recommended that a World Weather Research Programme (WWRP) project be considered for the Lake Victoria Watershed that would include a test-bed for field campaigns to collect data for Four Components 1. 2. 3. 4. research to understand the dynamics The Nowcast System The SWFDP The Field Project Capacity Building over the lake in order to reduce disaster from water spouts, waves, and wind gusts that affect both lake transport and fishermen who rely on the lake for their livelihoods. The EC further noted the potential linkages with the SWFDP for Eastern Africa." WGNR - JSC6 July 18 2013 EC 2010 30 Lake Victoria (Item 4.7) WGNR - JSC6 July 18 2013 31 The Field Project • Meteorological Understanding • Scientific Validation • Statistical Verification Red Stars – surveillance radar White Stars – hi res radar, dual-doppler Blue Star 6 – IOS Blue Star 4 – Upper Air Station Yellow – Met Stns WGNR - JSC6 July 18 2013 32 Other Activities Planned Meetings WGNR - JSC6 July 18 2013 33 NWP for Nowcasting 1. Predictability of Precipitation Systems 2. Mesoscale Networks 3. Data Assimilation and Rapid Update WGNR - JSC6 July 18 2013 34 WWRP Symposium on Nowcasting Research Rio di Janiero, Aug 2012 166 participants from 21 countries Radar Renewal in SA Nowcasting Impetus + 2 hours of lectures each day La Plata Rio 2016 Port Ops WGNR - JSC6 July 18 2013 35 Argentina Training (T-NOTE) • Initiated by radar renewal, radar networks, nowcasting needs, La Plata Basin • Initiated by Celeste Saulo, Paola Salio, Claudio Campetella, WSN12 • Lead trainer is Rita Roberts of NCAR • 5-16 August 2013 in Buenos Aires TRMM Height of 40 dBZ Echo TRMM Lightning Flash #/min WGNR - JSC6 July 18 2013 36 The Workshop Agenda WGNR - JSC6 July 18 2013 37 EUMETNET – Nowcasting New initiative began 1 Jan 2013 WGNR - JSC6 July 18 2013 38 Membership (23 Countries) WGNR - JSC6 July 18 2013 39 Nowcasting Activity 24.04.2013 EUMETNET Milestones • Establishment of a group of nowcasting experts under the EUMETNET governance and their motivation for engagement in the nowcasting related planning within EUMETNET • Provision of a scientific and technical overview of the applied nowcasting systems in Europe including quality assessment and development of verification standards for nowcasting (define parameters to verify, methods and observations to use for verification) • Identification of (scientific or technical) elements in the presently existing nowcasting systems, which are worthwhile for exchange between members and the organization of the exchange process • Assessment and interpretation of observation and NWP requirements for improved nowcasting and their communication with the relevant communities • Preparation of the Nowcasting Activity proposal for the second phase (20142017) WGNR - JSC6 July 18 2013 40 Nowcasting Activity 24.04.2013 EUMETNET Deadline 01.03.2013 Deliverables Deliverables Nomination of representative experts of members; set up Working Area (WA) teams, Expert Team, Observers; ToR of ET, WA teams and WA leaders 23.-24.04.2013 1. Face-to-face Meeting of ET (in the frame of INCA-CE (orig. Progress Meeting), WA working plan 15.06.2013) ET meeting (possibly via teleconference), WA progress report 15.11.2013 01.05.2014 Nowcasting conference, WA final report 01.06.2014 Different reports and assessments 30.06.2014 Proposal for the second phase to be submitted to EUMETNET WGNR - JSC6 July 18 2013 41 Re-Organization JONAS + WGNR WGNR + WGMWFR WGNR - JSC6 July 18 2013 42 JONAS = WGNR + PWS • Action item from JSC4 • Discussion initiated with PWS – Open discussion, various options discussed – Planned to meet this week -> TBD WGNR/WWRP CBS -FDP’s/RDP’s GDPFS (SWFDP) PWS (SWFDP, WENS) JWGVFR? SERA? Obs Dept? Technology Transfer Activities -Advance -Promote -Capacity Build •Guide to Nowcasting •Promote •Capacity Building •Training Workshop 43 WGNR + WGMWFR •Initiated by WWRP •Telecon, WGMWFR in June 2013 •No discussion within WGNR WWW CBS CIMO CAS WWRP WGNR WGMWFR HIW GDPFS JONAS PWS WGNE DAOS WGNR - JSC6 July 18 2013 44 Brainstorm at WGMWFR Benefits: Automation -> NWP •Parameterization Probabilistic/Ense •Numerics mble Nowcasting •Gray Zone Focus on 2-12 gap •Typhoon LAM Mutli-parameter •Land Surface Data Sets •Optimal Use of existing Hi-Res NWP dev networks Impact •Co-chair, membership at 20? •Too broad? 20 is unwieldy, difficult to cover expectations if much less? •Severe Weather? Hi-Res NWP use •Understanding Fine Scale DA dev •Systems, Fine Scale DA Heuristics Observations DQ analysis •Forecaster Interaction Brief Summary: Observations DQ •Promotion No one at WGMWFR •Capacity Building Gaps: adverse to re-organization •New Technologies Forecast Systems •Maturity, skill of Address gaps? NWP for severe Observations Clarity on rationale? Since WGNR - JSC6 July 18 2013 weather (core) 45 many options. Early Activities • Guide to Nowcasting (P. Li, HKO) • Aviation Nowcasting Initiative (P. Li, HKO) – CAEM developing strategic plan for aviation – SESAR in Europe – NEXTGEN in U.S. • Brazil Regional Training Centre – Nowcasting – Presented in WGNR Rio meeting – At USP, extended training workshops (2-6 weeks); annual – Request sustainability plan WGNR - JSC6 July 18 2013 46 Planned Meetings • • • • • • • Lake Victoria Planning Meetings? WGNR – East Africa 2014? EUMETNET Nowcasting 11/2013 or Spring 2014? TOMACS Kickoff – Dec 2013 FROST 14 Science – Spring 2014 WWOSC – Montreal, July 2014 WSN 15 or 16? – Hong Kong, Capetown, Sydney, Shanghai – EUMENET Nowcasting Meeting ~May 2014 • Urban Nowcasting Workshop 2015/16? – TOMACS, SREP, Pan Am2015 – With WSN? WGNR - JSC6 July 18 2013 PanAm15 Wx, AQ, HI 47 Approval/Advice from JSC 1. 2. 3. 4. 5. Membership Scheduling? Lake Victoria (defer to 4.7) WGNR Meeting – EA 2014? WSN15 or WSN16 – begin to prepare? WWOSC Nowcasting White Paper expected? 6. Merging? WGNR - JSC6 July 18 2013 48 Thank You WGNR - JSC6 July 18 2013 49