ISSUES: Beam Height State of WBS & State of Re-baseline exercise 1.6 m 1.8 m Beam Height.
Download ReportTranscript ISSUES: Beam Height State of WBS & State of Re-baseline exercise 1.6 m 1.8 m Beam Height.
ISSUES: Beam Height State of WBS & State of Re-baseline exercise 1.6 m 1.8 m Beam Height 1.6 m 1.8 m Beam Height Considerations • What drives the beam height? – Cavity Module? • What height is convenient? – Lower is better? • Next spring we will cut into the synchrotron vault 1.8m 1 2 3 3 1 2 3 4 5 6 4 1 2 3 4 5 6 7 8 5 5 1 2 3 4 5 6 1 2 2.1 2.2 2.3 3 4 5 5.1 5.2 5.3 5.4 6 7 8 9 10 11 7 8 9 10 11 12 13 Zisman/ Bross Kaplan Edgecock Drumm Introduction Blondel The Conceptual Design of MICE Palmer Layout and Optics Specification of the magnetic lattice: coil sizes, positions and currents:Stay clear dimensions Emittance Reconstruction Measurement programme & Staging of MICE RF System Li Cavity Design Coupling Coil RF Power System Integration Safety Cost and Schedule Lau Absorber Module Absorber and Manifold Windows Test Plans Instrumentation Focus Coils Integration Safety Cost and Schedule Drumm Beam and Beam Line Target Beam Line Layout Expected Performance Safety Cost and Schedule Detectors Bross Overview Time of Flight detectors ToF0 ToF1 ToF2 Up stream Cherenkov detector Down stream Cherenkov detector Tracker Module Long The Baseline design – SiFi R&D – TPG Tracker Solenoid SiFi - Tracker Solenoid integration Checker Author Editor Subsection Title Section Chapter Coordinating Editors 1 2 Palmer Palmer Green Palmer Blondel Zisman Li Green Church ! Virostek Li Li Baynham Ishimoto Cummings Cummings ? Barr Lau Black Zisman Lau Roberts Booth Tilley Tilley/Roberts Drumm Drumm Paladino Bross ! Bonesini Comments Version 16-December 2003 MICE Technical Reference Document Layout Executive Board has final control Tasks: Editors: Decide on sub-sections; Allocate and agree with sub-section Authors; Assemble text from authors; Use checker when the document has matured Keep Coordinating Editors Informed Authors: Keep in touch with your editor Supply an up to date proposal like section with added details: Supply engineering drawings* Specifications* related "defining" documents* * in original format Checkers: Is the documentation correct and complete? Does the documentation correspond to an "agreed" design/specification? Proofing Support/encourage your editor! Dates: Starting line-up reviewed by Technical Board (15/16th) and Steering group (18th) Status report at video conference on 17th December. Summers ! Gregoire ! ! ! Ellis Radicioni Fabbricatore Long Calorimeter ! Tortora Data Acquisition ! Radicioni Analysis and Simulation Torun Black Integration Bross Safety Bross Cost and Schedule Bross Norem Effects of Radiation on Detectors Current Status Ivanyushenkov Black Engineering Integration Black Ivanyushenkov 1.1 Integration of MICE IvanyushenkovBlack 1.2 Hall Layout 2 Infrastructure and Services Ivanyushenkov Drumm 2.1 Cryogenic System Bradshaw 2.1.1 Estimation of the heat load Bradshaw 2.2 Hydrogen Bradshaw Drumm 2.3 Electrical Power 2.4 Cooling Water Drumm Ivanyushenkov 3 Magnetic Shielding Drumm 4 Controls Drumm 5 Vacuum Ivanyushenkov 6 Civil Engineering Ivanyushenkov 7 Safety Drumm 8 Cost and Schedule Slow Controls, Instrumentation and the Experimental Interface Ivanyushenkov Safety Issues Drumm Quality Control Black/Lau/Virostek Drumm Responsibilities, Costs, Funding and Schedule Kaplan Summary Blondel Re-Baseline Exercise