ISSUES: Beam Height State of WBS & State of Re-baseline exercise 1.6 m 1.8 m Beam Height.

Download Report

Transcript ISSUES: Beam Height State of WBS & State of Re-baseline exercise 1.6 m 1.8 m Beam Height.

ISSUES:
Beam Height
State of WBS &
State of Re-baseline exercise
1.6 m
1.8 m
Beam Height
1.6 m
1.8 m
Beam Height
Considerations
• What drives the beam height?
– Cavity Module?
• What height is convenient?
– Lower is better?
• Next spring we will cut into the synchrotron
vault
1.8m
1
2
3
3
1
2
3
4
5
6
4
1
2
3
4
5
6
7
8
5 5
1
2
3
4
5
6
1
2
2.1
2.2
2.3
3
4
5
5.1
5.2
5.3
5.4
6
7
8
9
10
11
7
8
9
10
11
12
13
Zisman/
Bross
 Kaplan
 Edgecock
Drumm
Introduction
Blondel
The Conceptual Design of MICE
Palmer
Layout and Optics
Specification of the magnetic lattice:
coil sizes, positions and
currents:Stay clear dimensions
Emittance Reconstruction
Measurement programme &
Staging of MICE
RF System
Li
Cavity Design
Coupling Coil
RF Power System
Integration
Safety
Cost and Schedule
 Lau
Absorber Module
Absorber and Manifold
Windows
Test Plans
Instrumentation
Focus Coils
Integration
Safety
Cost and Schedule
 Drumm
Beam and Beam Line
Target
Beam Line Layout
Expected Performance
Safety
Cost and Schedule
Detectors
Bross
Overview
Time of Flight detectors
ToF0
ToF1
ToF2
Up stream Cherenkov detector
Down stream Cherenkov detector
Tracker Module
Long
The Baseline design – SiFi
R&D – TPG
Tracker Solenoid
SiFi - Tracker Solenoid integration
Checker
Author
Editor
Subsection
Title
Section
Chapter
Coordinating Editors
1
2
Palmer
Palmer
Green
Palmer
 Blondel
Zisman
Li
Green
Church
! Virostek
Li
Li
Baynham
Ishimoto
Cummings
Cummings
?
Barr
 Lau
 Black
Zisman
 Lau
Roberts
Booth
Tilley
Tilley/Roberts
 Drumm
 Drumm
Paladino
Bross
! Bonesini
Comments
Version 16-December 2003
MICE Technical Reference Document Layout
Executive Board has final control
Tasks:
Editors:
Decide on sub-sections;
Allocate and agree with sub-section Authors;
Assemble text from authors;
Use checker when the document has matured
Keep Coordinating Editors Informed
Authors:
Keep in touch with your editor
Supply an up to date proposal like section with added details:
Supply engineering drawings*
Specifications*
related "defining" documents*
* in original format
Checkers:
Is the documentation correct and complete?
Does the documentation correspond to an "agreed" design/specification?
Proofing
Support/encourage your editor!
Dates:
Starting line-up reviewed by Technical Board (15/16th) and Steering group (18th)
Status report at video conference on 17th December.
Summers
! Gregoire
!
!

!
Ellis
Radicioni
Fabbricatore
Long
Calorimeter
! Tortora
Data Acquisition
! Radicioni
Analysis and Simulation
Torun
 Black
Integration
Bross
Safety
Bross
Cost and Schedule
Bross
 Norem
Effects of Radiation on Detectors
Current Status
 Ivanyushenkov
 Black
Engineering Integration
 Black
 Ivanyushenkov
1.1
Integration of MICE
 IvanyushenkovBlack
1.2
Hall Layout
2
Infrastructure and Services
Ivanyushenkov
Drumm
2.1
Cryogenic System
Bradshaw
2.1.1
Estimation of the heat load
Bradshaw
2.2
Hydrogen
Bradshaw
 Drumm
2.3
Electrical Power

2.4
Cooling Water
Drumm
 Ivanyushenkov
3
Magnetic Shielding
 Drumm
4
Controls
 Drumm
5
Vacuum
 Ivanyushenkov
6
Civil Engineering
 Ivanyushenkov
7
Safety
 Drumm
8
Cost and Schedule
Slow Controls, Instrumentation and the Experimental Interface
 Ivanyushenkov
Safety Issues
 Drumm
Quality Control
Black/Lau/Virostek
 Drumm
Responsibilities, Costs, Funding and Schedule
 Kaplan
Summary
Blondel
Re-Baseline
Exercise