Technical status of the W-Si project CALICE : CAlorimeter for the LInear Collider with Electrons A calorimeter optimized for the Energy Flow measurement.

Download Report

Transcript Technical status of the W-Si project CALICE : CAlorimeter for the LInear Collider with Electrons A calorimeter optimized for the Energy Flow measurement.

Technical status of the W-Si project
CALICE : CAlorimeter for the LInear Collider with
Electrons
A calorimeter optimized for the Energy Flow measurement of
multi-jets final state at the Future Linear Collider running at
a center-of-mass energy between 90 GeV to 1 TeV.


Electromagnetic Calorimeter
Hadronic Calorimeter
http://polywww.in2p3.fr/flc/calice.html
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
General view of the
calorimeter
Tracker : TPC
ECAL : Sandwich Wplate & Si Wafer
HCAL : DHCAL or AHCAL
Coil : 4 T (2 )
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
ECAL concept :
-
A fine granularity calorimeter with large number of segmentation is proposed as
the best solution for the energy flow, lepton identification, photon reconstruction
with good precision on energy and direction.
-
On the other side, the coil thickness is bigger than usual due to the 4 Tesla field
needed to maintain the machine background close to the beam pipe. Therefore ,
the ECAL has to be very compact. (1,30 m for ECAL and HCAL)
-
Such a calorimeter could be made of Tungsten-Silicon sandwich.
-
With pad of 1x1 cm and 40 layers : A TRACKER CALORIMETER .
-
It gives a clean picture of all energy flow objects in all type of events
Simulation using GEANT4 lead to think of an energy resolution on electron/photon in the
region of Delta E /E = 11% / sqrt(E)
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Toward physique prototype :
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Global view
of the test beam setup
VME/…
HCAL
Prototypes overview
ECAL general view
2nd structure
3rd structure
(3×1.4mm of W plates) (2×1.4mm of W plates)
ECAL
Beam
monitoring
Movable table
VFE
1st structure
(1.4mm of W plates)
Detector slab
Vanel Jean-Charles LLR / IN2P3
Silicon wafer
NIKHEF 1-4 April 2003
Alveolus structures
Design and construction of a mould with all metallic pieces for the 3 different structures
Mould for alveolus structure 1.4
Structure 5 alveolus :(10 layers)
Detector slab
(here it is just a type H structure)
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Sizes of the structure : Alveolus
8.5 mm
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Detector slab
Transverse view
Front End electronics
Shielding
PCB
Silicon wafer
(0.525 mm)
8.5 mm
PCB (multi-layers)
Al. Shielding
( 2.4 mm)
Silicon wafer
(Cfi / W) structure type H
PCB :
- 14 layers
- Thickness 2.4 mm
Vanel Jean-Charles LLR / IN2P3
Composite structure
(0.15 mm / layer)
Tungsten
(1.4 mm, 2×1.4 or 3×1.4 mm)
NIKHEF 1-4 April 2003
Type H structure
Conception and realization of mould for manufacturing the whole
30 type H structures (3 different thickness W) :
Mould structure H :
Ended alveolar :
Carbon fiber
Tungsten 1.4 mm thick
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Sizes of the structure : Slab
Aluminum foil : ~0.1 mm
PCB : 2.4 mm
8,3 mm
Wafer : 0.525 mm
Vanel Jean-Charles LLR / IN2P3
Carbon fiber : 0.15 mm
W plate : 1.4 mm
NIKHEF 1-4 April 2003
PCB, Wafer, Chip : still in progress
PCB
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
PCB, Wafer, Chip : still in progress
PCB
Wafer
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
PCB, Wafer, Chip : still in progress
PCB
Chip
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
4” high resistivity wafers
- 525 microns thick – 5Kcm
ECAL prototype
silicon wafer description
- tile side: 62.0 + 0.0
- 0.1 mm
- guard ring
First test production
with 43 wafers
39 good
(< 2 nA leakage)
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Wafer :
Thickness : 525 microns  3 %
In silicon ~80 e-h pairs / micron  42000 e- /MiP
Capacitance : ~25 pF
Leakage current : 1 – 5 nA
Full depletion bias : ~150 V
Nominal operating bias : 200 V
Fréquence
% cumulé
8
120,00%
7
100,00%
4
Vanel Jean-Charles LLR / IN2P3
60,00%
3
40,00%
2
20,00%
1
3,
6
3,
2
Leakage curent (nA)
2,
8
2,
4
2
1,
6
1,
2
,00%
0,
8
0
0
Institute of Physics, Academy of Sciences of the
Czech Republic - Prague
80,00%
5
0,
4
Institute of Nuclear Physics - Moscow State
University
Number of pads
6
NIKHEF 1-4 April 2003
Detector schematic description
Amorphous silicon deposition
 Resistance
 Capacitance (AC coupling)
2 2 2 2 2
62mm
10mm
6
2
62mm
1 wafer
Diode bias
Sig. readout
Diode pin out
Vanel Jean-Charles LLR / IN2P3
Yvan Bonnasieux
Physique des Interfaces et Couches Minces Ecole Polytechnique - Palaiseau
10mm
Diode footprint
Aluminium sheet
PCB
Wafers
The aluminium sheet is the ground
NIKHEF 1-4 April 2003
Passive component on the wafer :
10
 Capacitance :
0,1
 Dielectric : silicon nitrite
 Refractive index : n=2
 Thickness : e = 2 m
R
2
0,2
7,6
C
10
S
C  0r
e
n  r
C= 1,32 nF
 Resistance :
 material : aSiH
 Resistivity : =1011 .cm
 Thickness : l = 2 m
0,1
9,8
0,1
l
R 
S
R= 102 M
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Passive component on the wafer :
0,6
C ~ 1.4 nF
Leakage current
0,4
current (nA)
 Capacitance :
0,2
0
-0,2
-0,4
Problem of measurement
-0,6
-300
-200
-100
0
100
200
300
Tension (V)
 Resistance :
Still in progress …
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Gluing of Si wafer
A automatic device is use to deposit the conductive glue :
Gluing and placement ( 0.1 mm)
of 270 wafers with 6×6 pads
About 10 000 points of glue.
X-Y-Z table (400×400×150 mm3) with glue
dispensing tool (conductive glue)
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Front end electronic : Asic
Laboratoire de l'Accélérateur Linéaire - Orsay
Detector
Charge preamp
shaper
Track & hold
Vdc = -200V
Amp
OPA
DC block
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Front end electronic : Asic
Laboratoire de l'Accélérateur Linéaire - Orsay
Detector
Charge preamp
shaper
Track & hold
Vdc = -200V
Amp
OPA
DC block
4.2 pC max input charge (650 MIP)
2.8V dynamic range
below 1% non-linearity
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Front end electronic : Asic
Laboratoire de l'Accélérateur Linéaire - Orsay
Detector
Charge preamp
shaper
Track & hold
Vdc = -200V
Amp
DC block
Vanel Jean-Charles LLR / IN2P3
OPA
180ns peaking time
NIKHEF 1-4 April 2003
Front end electronic : Asic
Laboratoire de l'Accélérateur Linéaire - Orsay
Detector
Charge preamp
shaper
Track & hold
Vdc = -200V
Amp
OPA
DC block
Multiplexing output :
18 channel / chip
2 chips / wafer
ENC = 2200 @ 80 pF
Talk from Bernard Bouquet : R&D for ECAL-VFE technology prototype
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Front end electronic : Asic
New FLC_PHY2 – General presentation
FLC_PHY1
FLC_PHY2
• Preamp  1 gain (1.5pF)
• Low noise (2200e-)
• Shaper  Mono gain
unipolar
• track & hold  Unipolar
Pin-Pin
compatibility
• Preamp  16 gains (0.2,
0.4, 0.8, 1.6pF switchable)
• Lower noise (input trans
improved)
• Shaper  bigain differential
• track & hold  differential
1 channel
Amp
Vanel Jean-Charles LLR / IN2P3
OPA
MUX out Gain=10
OPA
MUX out Gain=1
NIKHEF 1-4 April 2003
New FLC_PHY2
• Peaking time is 200ns on both gain
•High-gain shapers can be shut down by switching off their biases
•Two different output for low gain and high gain
Interface compatibility with the read out is kept
New interface not written at this point
Transient simulation
Vanel Jean-Charles LLR / IN2P3
Linearity simulation
NIKHEF 1-4 April 2003
DAQ :
VME (use and modify CMS board for Si tracker)
Need of 6 boards for physic prototype
FED layout
Ideally, keep
everything to
the right, redo
everything to
the left
• Restricts
readout board
to same I/O
and interFPGA paths
as FED
• No major
problems seen
so far
21 January 2003
Vanel Jean-Charles LLR / IN2P3
Talk from Paul
Dauncey : DAQ for
the CALICE beam
test
Paul Dauncey - UK Electronics
1
NIKHEF 1-4 April 2003
Cosmic test bench: general view
Interconexion Panel
Trigger
generator
Scintillator
Plane
Daq board and
control signals
to VFE PCB
VFEPCB
Scintillator
Plane
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Cosmic test bench: general view
Interconexion Panel
Trigger
generator
Scintillator
Plane
Daq board and
control signals
to VFE PCB
VFEPCB
Scintillator
Plane
2 XY planes : 16 in X et 16 in Y (40x40 cm2)
scintillators reading : PM + Ampli + Trigger Logic
Crate VME :
- QDC CAEN
- Trigger + Veto (dual timer)
- Crate Controller : PCI MXI-2 (NI) board
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Cosmic test bench: general view
Interconexion Panel
Trigger
generator
Scintillator
Plane
Daq board and
control signals
to VFE PCB
VFEPCB
Scintillator
Plane
Pattern generation board (Labo) :
Numerical CPLD
Clock toward PCB : 208 KHz
Level translator TTL/RS422
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Cosmic test bench: general view
Interconexion Panel
Trigger
generator
Scintillator
Plane
VFEPCB
Daq board and
control signals
to VFE PCB
Instrument)
Commercial board (National
- PCI Interface
Scintillator
- ADC 12
bits (1.25 Msa/s)
Plane
- DMA Transfer
- Input dynamic : from +/- 0.05 to +/- 10V
Talk from Cristina Lo Bianco : Assembly and cosmic test for the W-SI prototype (CALICE)
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Other ECAL R&D

Thermal studies
VFE inside beam

Passive component on the wafer



(Chip evaluation board and small DAQ are ready)
(Capacitance Ok and resistance still in progress)
Amorphous silicon … (works of Pierre
Jarron at Cern)
…
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Other ECAL R&D

Thermal studies
AC coupling elements ?
Thermal contact
Aluminium
Cooling tube
VFE chip
Cooling tube
power line
command line
signal out
1.3 mm
1.0 mm
PCB
Pad
0.5 mm
Silicon wafer
gluing for electrical contact
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Other ECAL R&D

Thermal studies
In the case of 40 layers and
considering a power dissipated of
about 5 mW/cm2 the temperature
at the middle of structure would
be about 280 °C
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Other ECAL R&D

Thermal studies
Cooling channel
Heat points
(VFE chip)
Thermal sensors
External
connections
PCB 1mm thick
(with wafers)
Structure type H
Vanel Jean-Charles LLR / IN2P3
Radiator
aluminium plate
NIKHEF 1-4 April 2003
Other ECAL R&D

Thermal studies
VFE inside beam

Passive component on the wafer



(Chip evaluation board and small DAQ are ready)
(Capacitance Ok and resistance still in progress)
Amorphous silicon … (works of Pierre
Jarron at Cern)
…
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Physic prototype : who ?

Mechanic :
–
–
–
–

W plates : Russian
ECAL Structure : LLR
Infrastructure of beam test : LPC Clermont-ferrand ? and ?
beam Hodoscope : ?
Data processing :
– DAQ / Event Builder : ?
– Simulation : LLR

Electronic :
– VFE : LAL
– DAQ : UK
– Slow control : ?

Instrumentation :
– silicon : LLR and PICM + Russian and Czech
– ECAL Integration : LLR
– Cosmic test bench : LLR
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Physic Prototype : Planning
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Q1 03
Q2 03
Q3 03
Q4 03
Q1 04
Q2 04
Q3 04
Q4 04
Nom de tâche
ID
jan
fév
mar
avr
mai
jui
jul
aoû
sep
oct
nov
déc
jan
fév
mar
avr
mai
jui
jul
aoû
sep
oct
nov
déc
Physic Prototype : Planning
1
Mecanic
2
Structure
Structure
1.4 1.4
3
Structure
Structure
typetype
H H
4
Structure
Structure
2.8 -2.8
4.2- 4.2
5
Gluing studies
6
Assembly
Assembly
7
Electronic VFE & PCB
8
Production
PCB design
VFE
9
PCB fabrication + test +
Production PCB
Production
10
11
12
Chip redisgn + Foundry + test
Assemblage
Chip Production
et Montage
PCB & Chip assemnly
13
SlowSlow
control
control
14
DAQ
15
Prototype (design + layout + Fab.)
16
Production (9 board)
17
Cosmic test bench design + fab
18
Cosmic test
Cosmic
test of slab detector
19
Event Builder
Event
Builder
20
Infrastructure test
Infrastructure
testbeam
beam
21 Beam test with electrons
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Q1 03
Nom de tâche
ID
ID
Nom de tâche
Mecanic
1
Mecanic 2
2
3 1.4
Structure
Structure
typetype
H H
Structure
Structure
1.4
3
Structure
Structure
typetype
H H
4
Structure
Structure
2.8 -2.8
4.2- 4.2
fév
mar
avr
mai
Q4 03
Q3 03
jui
jul
aoû
Q1 04
Q2 04
Q4 03
sep
oct
nov
déc
Q3 04
Q1 04
jan
fév
mar
avr
Q4 04
Q2 04
mai
jui
jul
aoû
Q3 04
sep
oct
nov
Q4 04
déc
jan
fév
mar
avr
mai
jui
jul
aoû
sep
oct
nov
déc
jan
fév
mar
avr
mai
jui
jul
aoû
sep
oct
nov
déc
Structure
Structure
1.4 1.4
4
Structure
Structure
2.8 -2.8
4.2- 4.2
5
Gluing studies
6
6
jan
Q3 03
Q2 03
Physic Prototype : Planning
1
5
Q2 03
Q1 03
Assembly
Assembly
Gluing7studies
Electronic VFE & PCB
8 Production
PCB design
VFE
Assembly
Assembly
9
10
11
12
PCB fabrication + test +
Production PCB
Production
Chip redisgn + Foundry + test
Assemblage
Chip Production
et Montage
PCB & Chip assemnly
13
SlowSlow
control
control
14
DAQ
15
Prototype (design + layout + Fab.)
16
Production (9 board)
17
Cosmic test bench design + fab
18
Cosmic test
Cosmic
test of slab detector
19
Event Builder
Event
Builder
20
Infrastructure test
Infrastructure
testbeam
beam
21 Beam test with electrons
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Q1 03
Q2 03
Q3 03
Q4 03
Q1 04
Q2 04
Q3 04
Q4 04
Nom de tâche
ID
jan
fév
mar
avr
mai
jui
jul
aoû
sep
oct
nov
déc
jan
fév
mar
avr
mai
jui
jul
aoû
sep
oct
nov
déc
Physic Prototype : Planning
ID
1
Mecanic
2
Structure
Structure
1.4 1.4
3
Structure
Structure
typetype
H H
4
Structure
Structure
2.8 -2.8
4.2- 4.2
5
Gluing studies
de tâche
6 Nom
Assembly
Assembly
7
1
3
4
7
mar
avr
mai
jui
jul
aoû
Q4 03
sep
oct
nov
Q1 04
déc
jan
fév
Q2 04
mar
avr
mai
Q3 04
jui
jul
aoû
Q4 04
sep
oct
nov
déc
Electronic VFE & PCB
Production
PCB design
VFE
11 Assemblage
Chip Production
et Montage
Chip redisgn
+ Foundry
+ test
PCB & Chip assemnly
Assemblage
Chip Production
et Montage
13
6
fév
Q3 03
Production
PCB design
VFE PCB fabrication + test +
9 Production PCB
Production
PCB fabrication + test +
Production10PCB Chip redisgn + Foundry + test
Production
12
5
jan
Q2 03
Electronic VFE & PCB
8
2
Q1 03
SlowSlow
control
control
PCB & Chip assemnly
14
DAQ
SlowSlow
control
control
15
Prototype (design + layout + Fab.)
16
Production (9 board)
17
Cosmic test bench design + fab
18
Cosmic test
Cosmic
test of slab detector
19
Event Builder
Event
Builder
20
Infrastructure test
Infrastructure
testbeam
beam
21 Beam test with electrons
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Q1 03
Q2 03
Q3 03
Q4 03
Q1 04
Q2 04
Q3 04
Q4 04
Nom de tâche
ID
jan
fév
mar
avr
mai
jui
jul
aoû
sep
oct
nov
déc
jan
fév
mar
avr
mai
jui
jul
aoû
sep
oct
nov
déc
Physic Prototype : Planning
1
Mecanic
2
Structure
Structure
1.4 1.4
3
Structure
Structure
typetype
H H
4
Structure
Structure
2.8 -2.8
4.2- 4.2
5
Gluing studies
6
Assembly
Assembly
7
Electronic VFE & PCB
8
Production
PCB design
VFE
9
PCB fabrication + test +
Production PCB
Production
10
11
1
DAQ
Q1 03
Q2 03
Q3 03
Q4 03
Q1 04
Q2 04
Q3 04
Q4 04
jan
fév
mar
avr
mai
jui
jul
aoû
sep
oct
nov
déc
jan
fév
mar
avr
mai
jui
jul
aoû
sep
oct
nov
déc
PCB & Chip assemnly
SlowSlow
control
control
Prototype (design + layout + Fab.)
14
3
Assemblage
Chip Production
et Montage
12
13
2
Chip redisgn + Foundry + test
Nom de tâche
ID
DAQ
Production (9 board)
15
Prototype (design + layout + Fab.)
4
Cosmic test
design
+ fab
16 bench
Production
(9 board)
5
17 Cosmic test bench design + fab
Cosmic test
Cosmic
test
of slab detector
6
Event Builder
Event
Builder
18
19
Cosmic test
Cosmic
test of slab detector
Event Builder
Event
Builder
7
Infrastructure test
Infrastructure
testbeam
beam
8
Beam test21with
electrons
Beam
test with electrons
20
Infrastructure test
Infrastructure
testbeam
beam
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003
Q1 03
Q2 03
Q3 03
Q4 03
Q1 04
Q2 04
Q3 04
Q4 04
Nom de tâche
ID
jan
fév
mar
avr
mai
jui
jul
aoû
sep
oct
nov
déc
jan
fév
mar
avr
mai
jui
jul
aoû
sep
oct
nov
déc
Physic Prototype : Planning
1
Mecanic
2
Structure
Structure
1.4 1.4
3
Structure
Structure
typetype
H H
4
Structure
Structure
2.8 -2.8
4.2- 4.2
5
Gluing studies
6
Assembly
Assembly
7
Electronic VFE & PCB
8
Production
PCB design
VFE
9
PCB fabrication + test +
Production PCB
Production
10
11
12
Chip redisgn + Foundry + test
Assemblage
Chip Production
et Montage
PCB & Chip assemnly
13
SlowSlow
control
control
14
DAQ
15
Prototype (design + layout + Fab.)
16
Production (9 board)
17
Cosmic test bench design + fab
18
Cosmic test
Cosmic
test of slab detector
19
Event Builder
Event
Builder
20
Infrastructure test
Infrastructure
testbeam
beam
21 Beam test with electrons
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003

Physic prototype  program is well advances
First test beam with electrons  mi 2004
First hadronic test beam  2005

All is not covered :


– Physic prototype in 2004
– R&D (thermal et electronic)
–…
http://polywww.in2p3.fr/flc/calice.html
Vanel Jean-Charles LLR / IN2P3
NIKHEF 1-4 April 2003