ELC 347 project management
Day 8
Agenda
• Quiz 1 • October 2 (next Class) • Chapter 1-4 • M/C & essay questions • Entire Class period • Assignment 3 Graded • 3 A’s, 2 B’s, 2 C’s, 1 D & 1 F • • Some students could have used more effort case 3.1.xls
• Assignment 4 Posted • Due October 9 • Integrative Project • 1 st part due Oct 2, Post in File Exchange in Group Section of Blackboard • Outline of deliverables (posted in WebCT) • Scope Management • Using MS project
5-3
Scope Management
Chapter 5 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
Project Scope
Project scope
is everything about a project work content as well as expected outcomes.
–
Scope management
is the function of controlling a project in terms of its goals and objectives and consists of:
1) Conceptual development 2) Scope statement 3) Work authorization 4) Scope reporting 5) Control systems 6) Project closeout
Conceptual Development
The process that addresses project objectives by finding the best ways to meet them.
Key steps in information development: 1.
2.
3.
4.
5.
Problem/need statement Information gathering Constraints Alternative analysis Project objectives
Problem Statements
Successful conceptual development requires: •
Reduction
of overall project
complexity
• Goals and objects are –
clearly stated
Reference points are provided • • Complete
understanding
of the problem You cannot solve a problem till you
UNDERSTAND
the problem
Statement of Work (SOW)
A SOW is a
detailed narrative description
required for a project.
of the work
Effective SOWs contain 1. Introduction and background 2. Technical description 1.
The more specific the better 3. Timeline and milestones 1.
Anticipated (hoped-for) 4. Client expectations 1.
What constitutes a project well done
The Scope Statement Process
1. Establish the project
goal criteria
(deliverables) a) cost b) schedule c) performance d) deliverables e) review gates 2. Develop the
management plan
for the project 3. Establish a
work breakdown structure
4. Create a
scope baseline
Work Breakdown Structure
a process that sets a project’s scope by
breaking down
its overall
mission
into a cohesive set of synchronous, increasingly
specific tasks
.
What does WBS accomplish?
Echoes project objectives Offers a logical structure Establishes a method of control Communicates project status Improved communication Demonstrates control structure
WBS and goals
Example WBS
Work Breakdown Structure and Codes 1.0
The project is the overall project under development 1.2
1.3
1.4
1.2.1
1.3.1
Deliverables are major project components 1.2.2
1.3.2
1.2.3
Subdeliverables are supporting deliverables 1.2.3.1
Work Packages are individual project activities 1.2.3.2
Examples
Sample WBS in MS Project
Work Packages
Lowest level in WBS X.X.X.X Deliverable result One owner Miniature projects Milestones Fits organization Trackable
Organizational Breakdown Structure Organizational Breakdown Structure (OBS) allows • Work definition • Owner assignment of work packages • Budget assignment to departments
OBS links cost, activity & responsibility
Intersection of WBS and OBS
Responsibility Assignment Matrix
Deliverable Task & Code Match IT to Org. Tasks 1.1
Problem Analysis Develop info 1.1.1
1.1.2
Identify IS user needs 1.2
Interview users Develop show 1.2.1
1.2.2
Gain user “buy in” 1.2.3
LEAD PROJECT PERSONNEL Dave Sue IS HR Ann R&D Jim R&D Bob IS Prepare proposal 1.3 Find cost/ benefit info 1.3.1
Support Notification Responsible Approval
Work Authorization
The formal
“go ahead”
to begin work Follows the scope management steps of: 1. scope definition 2. planning documents 3. management plans 4. contractual documents
Contractual Documentation
Most contracts contain:
Requirements Valid consideration Contracted terms
Contracts range from: Lump Sum also called “Turnkey” Cost Plus
Scope Reporting
determines what types of information reported, who receives copies, when, and how information is acquired and disseminated.
Typical project reports may contain 1. Cost status 2. Schedule status 3. Technical performance
Types of Control Systems
o Configuration o Design o Trend monitoring o Document o Acquisition o Specification
Project Closeout
The job is not over until the paperwork is done…
Closeout documentation is
used to
: Resolve contractual disputes Train project managers Facilitate auditing Closeout documentation
includes
: Historical records Post project analysis Financial closeout
Using MS project 2003
• Many of the required functions/reports in Project management are part of MS project 2003 – Industry wide acceptance • Do not use Wizard till you are comfortable with MS project • File ->New • Enter Project and all – Deliverables – Sub deliverables – Work packages • Indent using arrows to show decomposition – Template – Actual project • More on MS Project on Oct 6