Verbal Change Orders
Goals for updating the VCO format
 Relate VCO costs to template locations
 Create additional space for subcontractor costs
 Remove outdated material
2
Verbal Change Orders
Identification Information
 VCO number has been added
 Field event and site manager were relocated
 Text updated
3
Verbal Change Orders
Template Activity Description
 H1 now calculates at 20% of field work
 Put an “X” in the box for H1 to show it is appropriate
 Number “1” is automatically entered
 Costs from Template Sections A, B, C, D & H
4
Verbal Change Orders
Subcontractor / Equipment Purchase
 More entry lines
 Section & Number reference to template
 Subcontractor Name
 Costs from Template Section G
Easier Invoicing
Consistently tracked on template
5
Verbal Change Orders
In-house Services / Equipment Rental
 Section & Number reference to template
 Larger area to define services or equipment
 Costs from Template Sections E & F
6
Verbal Change Orders
Labor Section was removed
 Build up on backup spreadsheet
 Track under template activity section
 Apply to H1 with an X in the field work
box (labor and kits)
Miscellaneous Expense section was removed
 Items should be placed under Template Activity,
Subcontractor or In-house areas
Price List was removed
 Prices should be obtained from the work order template
7
Verbal Change Orders
Some things stay the same
 Deliverables / Extensions
 Signatures
 Totals
 Period of Service
8
Verbal Change Orders
Sampling Table Tab
 Updated to be consistent with template
Spreadsheet Tab
 Cells beside vehicle, per diem and PPE opened
for site manager notes
9
Lab Maximum Compensation Schedule
Laboratory
GW
10
Lab Maximum Compensation Schedule
Not Only Rates Change
 Laboratory Maximum Compensation Schedule (MCS)
Maximum amount the State will pay
 Pay actual subcontractor cost plus markup
 actual cannot exceed amount on MCS
Updated Method numbers as applicable
EPA Methods no longer have letters
Letters document method updates
SM Methods need letters
Different letters indicate different methods
11
Lab Maximum Compensation Schedule
(10%) Ten Percent Reduction - except when not
 Priority Pollutant Extractable Organics
 EPA Methods 625, 608, 8270 and 8081/8082
 Increased rates for Soil and Groundwater
 EDB by either method is now $50.05
 10% reduction for EPA 8011, but 1% reduction for EPA 504.1
 8 RCRA Metals
 Compilation of the individual metals costs
 Gasoline / Kerosene and Used Oil Groups
 Compilation of individual method costs
 With pre-existing discount applied
12
Lab Maximum Compensation Schedule
Added Parameters of Interest
 Heterotrophic Plate Counts (aqueous)
 replaces generic plate counts
 Mercury (aqueous)
 Ammonia (aqueous)
Orthophosphate (aqueous)
 Sodium (aqueous)
 Potassium (aqueous)
13
Lab Maximum Compensation Schedule
Removed Parameters
 Non-priority Pollutant Organics Aqueous
Removed from the MCS
Removed from the Used Oil Group
 Oxidation Reduction Potential Aqueous
 Carbonate Aqueous
Organic Carbon Content Solid
Duplicate of TOC
14
Verbal Change Orders and Laboratory
Maximum Compensation Schedule
Natasha Lampkin
 Questions
 Compliments
[email protected]
(850) 245-7525
Chuck Williams
 Comments
 Complaints
15