Improvements in process
1. Enhanced structure for oversight, coordination,
communication, and management of Capital Projects:



Executive Oversight Committee: High-level oversight over Projects,
reviews status reports from the Programming/Building Committee and
Project Team, sets procurement priorities, approves changes in scope,
evaluates projects, appoints Programming/Building Committee.
Programming/Building Committee: Oversight of major and minor capital
projects , conducts activities during programming/design, assists in
selection of architect.
Project Team: Oversight for day-to-day operations and coordination of
project, includes relevant stakeholders, reports status to Exec Oversight
Committee.
Improvements in process
2. Regular Classroom and Building Maintenance removed
from Master Plan Process:


Regular Maintenance Plan developed and implemented beginning Fall
2012.
No need for submission of requests to Master Plan process.
3. Small Projects Request Process:


Small Projects no longer submitted to the Master Plan process.
Requests accepted year-round, $10K - $50K, submit to VP for approval.
How to Submit a Project for the Technology / Facilities
Master Plan
Complete “Project
Proposal Template Part
1” and forward to VP
Approved Proposals
Submitted by VP to
cnm.edu/masterplan
(Due Dec 17, 2012)
Master Plan Vetting Team
uses Criteria to
recommend Projects
Recommended Projects to
Executive Team for Preliminary
Approval (Due Jan 22, 2013)
How to Submit a Project for the Technology / Facilities
Master Plan
For Approved Proposals,
Part 2 Proposal Form
requested (Jan 30, 2013)
Proposer Submits Part 2
Project Proposal form to
cnm.edu/masterplan
(Due Feb 18, 2013)
Executive Team receives final
recommendation from Vetting
Team (Feb 16, 2013)
Final Prioritized Projects
Submitted to Budget Office
(Mar 7, 2013)
Master Plan Vetting Team
Luis Campos
Joe Gieri
Team Leader
Team Leader
Ray Barela
Margie Barnett
Jolita Barnes
Jennifer Cornish
Charlotte Gensler
Sydney Gunthorpe
Alexis Kerschner
Jason Manzanares
Richard Mazon
Loretta Montoya
Eugene Padilla
UNKNOWN
Lis Turkheimer
Juliane Ziter
Facilities
Academic Affairs
Student Services
Student Services
Purchasing
Academic Affairs
MCO
Faculty
Information Technology
Fiscal Operations
Student Services
Student
Academic Affairs
Planning
How is your Master Plan Proposal evaluated?
The Master Plan Vetting Team will use
the following criteria divided into four
categories:
Student Success (15 Points)
• Does it enhance or increase educational opportunities?
• Does it improve student support services?
• Does it improve the student studying and gathering
environment?
College Success (15 Points)
• Does the project promote economic development and
or provide jobs in areas where growth is desired?
• Will it reduce time and resources of existing staff and
enhance services?
• Does this promote CNM’s identity in the local, state, or
national environment?
Health and Safety (15 Points)
• Does the project reduce risk to people and
property?
• Does it help promote a feeling of a safe
campus?
• Does it enhance communication that
promotes a safe campus?
Sustainability (15 Points)
• Does it promote long term regulatory
compliance?
• Do resources spent on maintenance of an
existing structure or item justify replacement?
• Does this represent a process improvement?
Compliance
• Regulatory, Accreditation, Legislative and Audit
• Must include supporting documentation
• No Number Value, Isolated for Executive Team if
documentation provided
Does the project represent legislative or other
mandate?
Is the project required as a result of audit findings?
Is the project required as a result of accreditation
requirement?
Does it protect against immediate safety and threat to
CNM?
cnm.edu/masterplan
•
•
•
•
•
Website to Submit Proposals
Cover Letter
Project Proposal Template Form
Instructions and Definitions
Criteria used by Master Plan Vetting Team to
recommend priorities to Executive Team
Current Master Plan - In Progress
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
2101 Oxford Property Purchase
A Building Restrooms Renovation
Access Control Project
ATC Landscape
Banner Assessment-Finance/HR/Student (Phase 1)
Business Office Refresh
Cable Plant Expansion
Campus Restroom Stall Renovation - Main
CNM Connect Technology
Curriculum Management Tool
DR Site Expansion
Enterprise Application Performance Plan
Enterprise Storage-Upgrade Project
Enterprise Technology Upgrade-Luminus
LSA 1st Floor Renovation
Main Campus Bookstore Renovation APS Data Center
Memorial Project
Microsoft Active Directory
Network Filter
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Nine Building Fire Alarm Upgrades
Part-time Faculty LOA/Compensation Automation
Renovation South Valley Room 106 & 107
Rio Rancho Open Computer Lab
Security Cameras Project
Southwest Campus Master Plan - Study Only
SRC Communications Entrance Cooling
SRC Richard Barr Room Acoustical
SRC Stair/Sidewalk Project
SSC Building Enhancements
SSC Food Court Enclosure
Student Health Center (Door) Renovation
Student Svc Ctr Renovation (Bookstore Space)
Voice System
W Bldg Emergency Egress Gates
Web Enhancement Consulting (Sharepoint)
Web Home Page
WS Phase III
WS Stone Replacement Project
Current Master Plan - Almost Completed
•
•
•
•
•
•
•
•
•
•
•
H Bldg
HVAC Fan Max Salazar Bldg
HVAC Fan Smith Brasher Bldg
JS Renovation/S Bldg
KC & MS Fire Alarm Upgrade
Media Production Studio in A Bldg
Millennium Security
MS Elevator
Parking System
Student Email Outsourcing
Tom Wiley Renovation
Current Master Plan - Coming Soon!
Project
Start Date
A Building Courtyard
April 2013
AT Wall Removal - TC122/W16
October 2012
ATC New Roof
October 2012
Campus Communications Duct Bank Study/Wellness Path (Tech Loop)
April 2013
Campus Emergency Broadcast & Display System
October 2012
J Bldg Renovation
March 2013
L Building
March 2013
Network Vulnerability Scanning
November 2012
Records Retention to Theater Black Box Renovation
December 2012
Retro Commission-MS,SB,SSC,WTC,K,J (Mostly HVAC-Begin w/MS)
December 2012
Room Scheduling Upgrade
November 2012
Smith Brasher Renovation
May 2013
Software Virtualization-Phase I of 3
October 2012
TC138 HVAC Upgrade
October 2012
Trades MS,SSC Grade & Drainage Improvements
April 2013
Current Master Plan - Future Work
•
•
•
•
•
•
•
•
•
•
•
•
A Building Renovation
ATC Phase II
Campus Wayfinder and Entry Way Improvements
CNM Building Information Model for all Campuses
CNM Outdoor Amphitheater
E Bldg Renovation
Energy Service Provider and Controls Installation
Human Resources OnBoard System [On Hold]
Online Planning Tool [On Hold]
Renewable Energy Technology (Solar Panels)
South Valley Campus Renovation
SV Phase IV & Cosmetology/Vet Tech Renovation
Current Master Plan - Maintenance
•
•
•
•
•
•
•
•
•
Classroom Refresh
Classroom Technology Replacement/Expansion
Critical Application Business Continuity Exercise
Enterprise Storage
Network Replacement
Parking Lot Resurfacing
PC Replacement
Server Replacement
Virtual M-Ware
Let’s Celebrate - Completed Projects
•
•
•
•
•
•
•
•
•
•
•
•
•
A Building Cable Power and Data
Migration
A Building Furniture
Alameda Site Irrigation Meters
ATC Phase I
ATC Student Services ReceptionConnect
Banner Finance
Bike Project-Smoke Free Zone near KC
Blackboard Learn 9
Culinary Arts Equipment
Data Port Installation at SB & TC
Demolition of Houses-Buena Vista
Enrollment Management Area
Renovation
I Building Network Outlet
•
•
•
•
•
•
•
•
•
•
•
•
•
Instructional Network Hardware (BIT)
Lockers Outside Bookstore at JMMC
LSA Break Area
Media Site
N Building Infrastructure
On-line Collaboration Tool
Rio Rancho Phase I
SRC ISP
Student Resource Center
SV 256 Faculty Offices converted to
Computer Lab
Trades Temp Telecommunication
WS Data Center Network & Equip
WTC Carpet Replacement
Thank you!