Transcript Slide 1
DRAFT 2011-12-11 Barents 2020 Final Report RN01 “Co-ordination of Deliverables” Moscow 14 December 2011 Presented by Vladimir Vernikovskij, Russian Coordinator of RN01 RN01 Participants Name Company Vladimir Vernikovskiy GAZPROM / TK23 Denis Tikhomirov VNIIGAZ Alexander Ermakov SDAG Annie Audibert-Hayet TOTAL Jan Gustaf Eriksson STANDARDS NORWAY Alf Reidar Johansen OGP Per Eirik Fosen STATOIL Morten Bøhlerengen Moss Maritime Anatoly Baryshnikov ENI E&P (NCOC) Tore Sildnes DNV Co-ordinators 2 RN01 - Mandate for Phase IV 1. Recommend how deliverables should be structured and published 2. Review deliverables for compliance with the recommendations, – prepare roadmaps for implementation of deliverables 3. Create awareness among the potential recipients as to what is coming – (e.g. standards organisations) 4. Provide proposal for an Arctic long term international standards program – (ref. ISO/TC67 MC Ad-hoc group Arctic Operations) Task 1: Recommendation of deliverables • Report developed and delivered to Steering Committee 7th Dec. 2010 • Recommendations presented at B2020 Conference 9th Dec. 2010 Task 2 Review of deliverables and recommendation for implementation RN02 - Ice Loads Deliverable Guidance Document Recipient Application ISO Editing Panel for 19906 Input to update of 19906 ISO TC67/SC8 Future NWIP National St.org. Russia/Norway Regional amendment to ISO 19906 (unitl new edition issued) RN02 - Commentary RN03 – Risk Management Deliverable Recipient Seminar Proceedings Barents 2020 Report RN03 - Commentary RN04 – Evacuation & Rescue Deliverable Recipient Application ISO Editing Panel for 19906 Input to update of 19906 ISO TC67/SC8 Future possible NWIP Guide for Arctic Evacuation ISO TC67/SC8 Future possible NWIP Guide for Emergency Reponse Vessels ISO TC67/SC8 Future possible NWIP Commentary on EER provisions of ISO19906 ch.18 RN04 - Commentary RN05 – Human Factors Deliverable Report Recipient Application ISO TC67/SC8 Future NWIP ISO Editing Panel for 19906 Input to Update of 19906 DNV Class Rules Class Notation «Winterised» RN05 - Commentary RN06 – Ice Management Deliverable State of the Art Report Recipient ISO TC67/SC8 Application Future NWIP RN06 - Commentary RN07 – Operational Emissions & Discharges Deliverable Reginal Guidance Report Recipient Application Russian National Std. Body Gost or SanPin std. ISO TC67/SC8 Future NWIP OGP Arctic environmental Guideline RN07 - Commentary Task 3: Creating Awareness Initiatives RN01 participation and presentations: • Plenary meeting of ISO TC67/SC7 – Singapore, Jan. 2011 • ISO/TC67/Management Committee meeting – San Francisco, June 2011 – where the formation of ISO/TC67 MC AHG “Arctic Operations” were discussed • Norwegian Sector Board for Petroleum Standardisation • OGP Standards committee meetings • OGP Arctic Co-ordination TF meetings Article in OGP Standards bulletin 2011 18 Task 4 – Proposal for Arctic Long Term Standardisation 1 2 3 4 B2020 RN01 Recomm. Report to ISO (June) ISO Ad-hoc Group Arctic Operation (June-Sep.) ISO TC67 Plenary Meeting Moscow (Sep) New ISO TC67 Sub-Comm. 8 «Arctic Operation» formed 1 RN01 Recommendations to ISO: 11 New Work Item Proposals Working group Deliverables 2012 2013 2014 2015 2016 2017 2018 PNGI – Arctic operations – Ice loads in structural design PNGI – Arctic Operations – Topside facilities, add. tech. requirements PNGI – Arctic operations – Working environment RN01: Recommendation for structuring, editing and publishing of phase IV deliverables PNGI – Arctic operations – Escape, evacuation and rescue PNGI – Arctic operations – Onshore logistics PNGI – Arctic operations – Offshore logistics PNGI – Arctic operations – Staff management PNGI – Arctic operations – Maintenance of structures PNGI – Arctic operations – Offshore structures corrosion protection PNGI – Arctic operations – Plant security PNGI – Arctic operations – Ice management 20 2 ISO AHG • The ISO/TC67 MC Ad-hoc group on Arctic Operations used the Barents 2020 RN01 report as a basis for their recommendations • Recommended to the ISO/TC67 plenary meeting in Moscow, 14-15th September 2011: – to set up a new subcommittee for Arctic Operations – to invite Russia to propose a chairman and secretary. • • Re. ISO/TC67 N 1148 Report ISO TC67 MC AHG Arctic operations, dated: 2011-09-07. . 3 3 – IOS plenary meeting • The plenary meeting of ISO/TC67 took a resolution in its meeting 2011-09-15 to establish SC8 “Arctic Operations”. • The SC8 work programme will be developed on the basis of the abovementioned work items. • The formal establishment of SC8 has been approved by ISO Technical Management Board • Preparations for the first meeting can start. Detailed new work item proposals are being prepared. 4 ISO TC67 SC8 • SC 8 work programme to start with about 15 work items, which should include the following subjects and/or standards: – Working environment in connection with cold-climate conditions (1 standard ready in late 2014); – Escape, evacuation and rescue (1 standard ready in early 2014)); – Maintenance of onshore and offshore structures (2 standards ready in late 2014); – Ice management (6 standards ready in 2015); – Onshore and offshore logistics (2 standards ready in late 2014); – Plant security (1 standard ready in early 2014). • The detailed new work item proposals are being prepared. Thank you for your attention ! Options for final reporting 1. Barents 2020 technical report 2. Proposal for Guideline(s) or Recommended Practice(s) – – – GAZPROM (STO) DNV (RP) OGP 3. Proposal for identical Russian and Norwegian national supplementary standard to an ISO standard – – 4. 5. 6. 7. 8. 9. GOST R Standard, Recommendation or “set of rules” NS or NORSOK standard Proposal for national annex to adopted ISO or EN-ISO standard Proposal for ISO Technical Specification (TS) Proposal for ISO Technical Report (TR) Proposal for ISO Publicly Available Specification (PAS) Proposal for ISO International Workshop Agreement (IWA) Proposal for ISO Amendment to existing standard (Amd)