Presentation of the The ARC System Construction Cost Control “Click” mouse to advance presentation Version 2.2 January 2003 FocusPlus SA January 2003 What is the ARC System? • Site construction cost control & management software • Designed for the telecommunications industry • Based on a comprehensive “shopping list” of construction items (Master Schedule of Works with agreed rates) • User–friendly means of managing the Schedule of Agreed Construction Rates • Uses well-defined model sites to set accurate site construction budgets & produce cost control documents • Used by Designers & Contractors to produce site cost control documentation from Estimate (financial planning) to Final Account FocusPlus SA January 2003 What are the Benefits? • Visibility of ‘REAL’ construction costs and excessive costs for sites, early in the rollout process • • Consistent and clear cost information from Contractors • • • Contractors judged on time and quality not on COST Simple method of producing / processing cost documentation & contractor payments Client can use the costs to determine future budgets Ensures appropriate ‘paper trail’ for Quality Assurance FocusPlus SA January 2003 How does the ARC work? In brief, the ARC System involves two phases of work and different versions: CLIENT VERSION • • Utilised for the set up of the software in accordance with the Customer requirements including a Master Schedule of Works & Model Sites - Phase 1 Following set-up the software can be utilised by the Client to import / create / manage cost control documentation – Phase 2 PARTNER VERSIONS • Utilised by Design Consultants and Contractors to create construction cost control documentation based on an agreed set of rates and model sites – Phase 2 FocusPlus SA January 2003 Phase 1 - Initialisation / Set-up With the assistance of FocusPlus SA, the ARC System is customised to the Client requirements Modifying the Master Schedule of Works to suit the Client’s & project needs Setting Client and project parameters Entering project Designers and Contractor details Importing & analysing Contractor post tender rates based on the schedule of line items Setting & fixing the final rates for each Contractor Defining & importing model sites that are appropriate to the project Generating Designer & Contractor partner versions for creation of cost control documents based on fixed rates FocusPlus SA January 2003 Phase 1-Master Schedule of Works The FocusPlus Master Schedule of Works is Structured as follows: • Schedule divided into SECTIONS • Sections divided into CATEGORIES • Categories contain SUB CATEGORIES or line items of construction activity Note: Alternatively a Client may utilise their own schedule of works, however, modifications to the schedule may be necessary to ensure compatability with the ARC software. FocusPlus SA January 2003 Phase 1-Master Schedule of Works The FocusPlus SA schedule can be modified or a Client schedule can be imported into the ARC Support statements provide descriptions of the line items to assist in pricing & schedule management Sections, Categories & construction line items can be easily located by the tree structure FocusPlus SA January 2003 Line Items can be added to or deleted from the schedule Phase 1-Rate Agreement The Thefinalised ARC is utilised project to Schedule analyseof Contractor Works is rates Priced for different by thescenarios Contractors (e.g. & the National rate for vs each Regional). line item The is ARC imported will produce into theaARC spreadsheet system. which compares the rates submitted by the Contractors. The ARC can compare the rates of any number of different Contractors Rates are negotiated and agreed with the Contractors, then fixed by the ARC The ARC provides a visual comparison based on percentage variation from the mean value. The percentage variation can be modified to suit. FocusPlus SA January 2003 Phase 1-Project Model Sites Model sites are defined with the Client that represent the typical sites to be constructed on the project. Model site schedules are imported into the ARC system. The function of model sites is as follows: • Utilised by the Client to establish construction budgets based on negotiated rates • Selection of an appropriate model site schedule as the basis for the cost control document creation • As a cost cross comparison budget vs live site construction costs FocusPlus SA January 2003 Phase 1-Typical Model Sites Model sites are defined that suit the project and territory. Typical models sites currently available are indicated below: Model Site Ref. Model Site Description GLS – 24 Greenfield – Lattice 24 M – Shelter GLS – 42 Greenfield – Lattice 42 M – Shelter GGS – 60 Greenfield – Guyed Mast 60 M – Shelter GMS – 25 Greenfield – Monopole 25 M – Shelter GME – 25 Greenfield – Monopole 25 M – External Cabs RFPE Rooftop – Flat – Poles – External Cabs RFPS Rooftop – Flat – Poles – Shelter RFPA Rooftop – Flat – Poles – Attic Internal Room RFPB Rooftop – Flat – Poles – Basement Internal Room RPPE Rooftop – Pitched – Poles – External Cabs RPPA Rooftop – Pitched – Poles – Attic Internal Room RPPB Rooftop – Pitched – Poles – Basement Internal Room FocusPlus SA January 2003 Phase 1-Partner Version Creation The CLIENT VERSION is utilised to generate PARTNER VERSIONS of the software for distribution as follows: The ARC Design Consultant Partner Version incorporates fixed rate types for the range of Contractors and/or Regions for which they will work The ARC Contractors Partner Version incorporates fixed rates for one of the following rate types: • • • National rate basis for all project Contractors Regional rate basis for each Contractor within a region Specific Contractor rate basis (Set of fixed rates for each Contractor) FocusPlus SA January 2003 Entry Screens for Different Versions Administrator access only FocusPlus SA January 2003 Phase 2-Cost Control Documents The ARC System manipulates the Master Schedule of Works to efficiently create various cost documents for each Site, as indicated below: Build Cost Estimate Bill of Quantities The above documents are typically prepared by a Design Consultant Fixed Price Quotation Certificate of Payment Variation Orders Final Account The above documents are typically prepared by a Contractor Note: The application can be utilised to produce all or a selection of the above documents for each site type. FocusPlus SA January 2003 Phase 2-Cost Control Documents Cost Control Document output is dependant on the ARC Version utilised, as indicated below: Client Version Designer Version Bill of Quantities Yes Yes Yes Yes Contractors Fixed Price Quotation Yes Yes Contractors Certificate for Payment Yes Yes Contractors Variation Order Yes Yes Contractors Final Account Yes Yes Cost Control Document Type Build Cost Estimate FocusPlus SA January 2003 Contractor Version Phase 2-Cost Control Documents Each document type is issued during the following phases: Cost Control Document Type When Issued Build Cost Estimate Concept Design Phase Bill of Quantities (without costs) Detailed Design Phase Contractors Fixed Price Quotation Pre Construction Phase Contractors Certificate for Payment Contractors Variation Order Contractors Final Account FocusPlus SA January 2003 During and Post Construction Phase During Construction Phase Post Construction Phase Phase 2-Cost Document Creation Accessing site cost information or entering new site details: Enter the site reference and candidate List of sites in the database Enter the site details e.g Site ID, site name, address site type etc. Create a document The above screens are used to access site details and documents already in the database and for entering new site details FocusPlus SA January 2003 Phase 2-Cost Document Creation Select the document type and other parameters: Site details Import quantities from a document previously created by another ARC user Saved Documents Choose a document type: Build Cost Estimate Bill of Quantities Contractors Fixed Price Quotation Contractors Certificate for Payment Contractors Variation Order Contractors Final Account Document version control Creation of document based on: View the contents of a document A Model Site Previously created document (same type) Document version from another Site Manually from the Master Schedule Imported document prepared by another user Print a report Choose the rate basis: National Regional Contractor (OR Zero rate) FocusPlus SA January 2003 Create a document Export a created document Phase 2-Cost Document Creation Creating a cost control document (e.g. Build Cost Estimate) Select the name of the user pereparing the document Site details Itemsof work which are Not Included in the Master Schedule of Works can be entered manually Delete line items as necessary Unit rates CANNOT be altered by the end user Add new line items From the Master Schedule of Works library Group statement FocusPlus SA January 2003 Documents based on model sites are substantially complete with only minor modifications necessary Alter quantities as necessary Phase 2-Cost Document Creation Creating a Contractor’s Certificate for Payment Purchase order value Select the name of the user pereparing the document Site details Contractors name must be selected Manually enter the gross amount figure Save modifications prior leaving the screen Total of variation orders issued to date entered automatically The report can be previewed and printed from this screen Enter retention precentage if applicable FocusPlus SA January 2003 Net amount due in the current certificate Less amount paid out in the previous payment certificate entered automatically Phase 2-Cost Document Creation Creating a Contractor’s Final Account Select the name of the user pereparing the document Site details Contractors name must be selected Save modifocations prior to leaving the screen Contractors final account is based on the fixed price quotation plus any variation orders issued during the construction phase Total of variation orders FocusPlus SA January 2003 Total final account The report can be previewed and printed from this screen Phase 2-Cost Document Creation Creating a Contractor’s Variation Order Enter manually items of work which are Not Included in the Master Schedule of Works Select Sub Categories from the Master Schedule of Works to be included in the Variation Order FocusPlus SA January 2003 Entering a negative quantity will change the item to a negative amount and turn the line RED The ARC System by FocusPlus SA FocusPlus SA January 2003 Contacting FocusPlus SA FocusPlus SA 6e étage Immeuble BCB – Route de Renens 1 Case postale 184 CH-1030 Bussigny-près-Lausanne SWITZERLAND Telephone: +41 21 706 6000 Facsimile: +41 21 706 6009 E-mail: [email protected] WWW: www.focusplus.ch FocusPlus SA January 2003